Loading…
Loading…
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
22 Jun 2026, 3:00 pmDue today
Similar tender results from the same govt authority in the past 3 years.
Sh. Nitin Nandwani E.E CD-19 (UC), DSIIDC
Plot No.74-A, 2nd Floor, Room No.216, Ring Road, Lajpat Nagar-III, New Delhi-110024
Development works in unauthorized colonies. C/o CC Road and RCC drains at Shisha Godam Road, Mohan Garden Ph-I (Regn. No. 244) in Uttam Nagar AC-32
2026_DSIDC_293409_1
NIT No.29/2026-27/CD-19 (UC)
Open Tender
Civil Works
180 days
Shisha Godam Road, Mohan Garden Uttam Nagar
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹7.2 L
12 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 566 | cum | 2,434.25 | ₹13,77,785.5 | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 398.95 | cum | 1,503.6 | ₹5,99,861.22 | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1,742.25 | cum | 260.3 | ₹4,53,507.68 | - |
| 4 | 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size). | 116.15 | cum | 6,518.6 | ₹7,57,135.39 | - |
| 5 | Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.
All works upto plinth level. M-10 grade plain cement concrete. (Minimum cement content considered @ 220 kg/cum) | 396.98 | cum | 8,849.75 | ₹35,13,173.76 | - |
| 6 | Surface dressing of the ground including inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 3,989.5 | sqm | 34.15 | ₹1,36,241.43 | - |
| 7 | Providing and laying ready mix cement concrete of M-30 grade, in roads using cement content as per design mix, using coarse sand and graded stone aggregate of 20 mm nominal size in appropriate proportions as per approved & specified design criteria including cost of admistures in recommended propportions as per IS :9103 to accelerate/retard setting of concerete, improve workability without impairing strength and durability including pumping of R.M.C: from transit mixer to site, laying at site, spreading and compacting mechanically by using needdle and surface vibrators, leveling to required slope/camber, finishing with required texture, booming with wire brush curing excluding the cost of centering, shuttering complete all as per directions of engineer in incharge(minimum cement content required in M-30 is @ 350 kg/cum). Cement concerete manufactured in approved R.M.C. plant including transportation to site in transit mixture. | 595.47 | cum | 9,655.7 | ₹57,49,679.68 | - |
| 8 | Deduct for not laying the concrete by using the pump, piping work, accessories, vacuum process, top matting, power charges, loading/unloading & other misc. operational charges etc. as per direction of Engineer-in-charge. | 992.45 | cum | 355.66 | ₹3,52,974.77 | - |
| 9 | Providing and fixing in position pre-moulded joint filler in expansion joints. | 12,330 | per cm depth per cm width per m length | 5.3 | ₹65,349 | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. | 4,519.75 | sqm | 392.15 | ₹17,72,419.96 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
nittd29cd19.pdf
Tender Documents • 0.41 MB
BOQ_389907.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid