Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45,000Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹45,335+₹335 (0.74%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹47,250+₹2,250 (5.00%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹50,000
EMD Value
₹1,500
Closing Date
4 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
RENOVATION OF PASSENGER SHED AT WANPOH BLOCK ANANTNAG
2026_RDPR_318021_82
ENIT79of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹1,500
7 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 0.50 mm thick with zinc coating not less than 275 gram/m2 | 23.23 | sqm | 852.5 | ₹19,803.58 |
| 2 | Providing and laying of hand Packed stone soling including carriage from approved source to site of work complete job | 4.33 | cum | 1,174 | ₹5,083.42 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) with carriage of materails lead of 5 kms | 3.47 | cum | 6,055.5 | ₹21,012.59 |
| 4 | Centring Shuttering including strutting Proping & Removal of form Work wtc complete job suspended floors .slabs etc | 5.4 | sqm | 286.35 | ₹1,546.29 |
| 5 | provision for sign board ,photographes with painting of etc complete jobetc | - | Each | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1047389.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .