| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC | ₹4.0 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L2₹4.4 CrRejected-AOC F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹4.4 Cr | L2 | Rejected-AOC 2ND LOWEST |
| Sl No | Description | Qty | Unit | Hydrotech Paryavaran India Pvt. Ltd. L2 | SHREE SHYAM ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Capital Cost:
Turnkey work of Design construction, erection, testing and commissioning of STP 1.00MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping and all other contingent Electrical, Mechanical Electromagnetic Flow Measurement Device on inlet and outlet Piping and instrumentation works With PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipment’s and including OandM of 3 Years after 12 months defect liability period and 3 months trail run period.(Including items as given below) at Bada Talab, Medininagar, Jharkhand
All kinds of civil work and electromechanical work along with SITC of same as per Annexure - A AND Annexure - B and as per tender document.
[*Any other item required for proper functioning of the plant as per direction of Engineer-in-charge’s shall be included in scope.
Rest as per Annexure - A and B to meet specifications and as per tender document.] * Note:- 1. All Kinds of Civil works related to walkways, Pathways, Landscaping for proper functioning of STP in all respects to be included in Scope of Contractor and as per tender.
2. All Electromechanical and Structural Design and Engineering including Drawings should be approved and vetted by any IIT/Government Institution or department of repute.
3. Any other item required for proper construction and functioning of the plant should be carried out as per instruction of Engineer-in-charge’s. | 1 | JOB | 3,77,69,625 ₹3.8 Cr | 3,48,72,976 ₹3.5 Cr |
| 2.00O&M: Operation and Maintenance of sewerage system alongwith the maintenance of STP, complete infrastructure For 3 - YEARS after trial run period of 3 months Inclusive of the: - Repair & maintenance of E&I as and when required - Manpower required for smooth operation of the plant - 3 operators & 1 Incharge - Consumables required to operate the plant so as to achieve the required outlet parameters AS PER NGT/PCB | |||||
| 2.01 | 1st Year (2025) | 1 | JOB | 18,00,000 ₹18 L | 15,50,000 ₹15.5 L |
| 2.02 | 2nd Year (2026) | 1 | JOB | 20,00,000 ₹20 L | 18,50,000 ₹18.5 L |
| 2.03 | 3rd Year (2027) | 1 | JOB | 22,00,000 ₹22 L | 19,30,000 ₹19.3 L |
Tender Value
₹3.5 Cr
EMD Value
₹3.5 L
Closing Date
14 Feb 2025, 2:00 pmClosed
MUNICIPAL COMMISSIONER
MEDININAGAR MUNICIPAL CORPORATION
Design Build and Transfer Sewage Treatment Plant of Capacity 1 Mld Using Sequential Batch Reactor SBR Technology for Sewage Treatment at Bada Talab District Palamu in The State of Jharkhand Along with Its Operation and Maintenance for ....
2025_UDD_98247_1
UDHD/MMC/30/2024-25
Open Tender
Civil Works
90 days
Medininagar Municipal Corporation
AS PER TENDER DOCUMENT
4 documents required · 4 mandatory
₹10,000
₹3.5 L
Yes
MEDININAGAR MUNICIPAL CORPORATION
16 Dec 2025
6 Feb 2025
15 Feb 2025
6 Feb 2025
14 Feb 2025
6 Feb 2025
8 Feb 2025
Amount
Capital Cost: Turnkey work of Design construction, erection, testing and commissioning of STP 1.00MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping and all other contingent Electrical, Mechanical Electromagnetic Flow Measurement Device on inlet and outlet Piping and instrumentation works With PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipment’s and including OandM of 3 Years after 12 months defect liability period and 3 months trail run period.(Including items as given below) at Bada Talab, Medininagar, Jharkhand All kinds of civil work and electromechanical work along with SITC of same as per Annexure - A AND Annexure - B and as per tender document. [*Any other item required for proper functioning of the plant as per direction of Engineer-in-charge’s shall be included in scope. Rest as per Annexure - A and B to meet specifications and as per tender document.] * Note:- 1. All Kinds of Civil works related to walkways, Pathways, Landscaping for proper functioning of STP in all respects to be included in Scope of Contractor and as per tender. 2. All Electromechanical and Structural Design and Engineering including Drawings should be approved and vetted by any IIT/Government Institution or department of repute. 3. Any other item required for proper construction and functioning of the plant should be carried out as per instruction of Engineer-in-charge’s.
O&M: Operation and Maintenance of sewerage system alongwith the maintenance of STP, complete infrastructure For 3 - YEARS after trial run period of 3 months Inclusive of the: - Repair & maintenance of E&I as and when required - Manpower required for smooth operation of the plant - 3 operators & 1 Incharge - Consumables required to operate the plant so as to achieve the required outlet parameters AS PER NGT/PCB
1st Year (2025)
2nd Year (2026)
3rd Year (2027)
Hydrotech Paryavaran India Pvt. Ltd. (BID ID -647082)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid