| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,008.12Accepted-Finance | ₹77,008.12 | L1 | Accepted-Finance Less Quoted |
| 2 | L2₹94,890.43Accepted-Finance | ₹94,890.43 | L2 | Accepted-Finance Above Quoted |
| Sl No | Description | Qty | Unit | sundaresan L2 | Devaraj L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Renovation of Two Class Room School Building (PUPS) in Ariyaperumbakkam at Ariyaperumbakkam Panchay Estimate Amount : 0.84 Lakhs | |||||
| 2.00 | Clean removal of cement plaster from walls and Celling including all charges etc complete | 91.46 | Sqm | 39 ₹3,566.94 | 9 ₹823.14 |
| 3.00 | Casurina Poles 8cm-10cm dia For Scaffolding | 123 | Sqm | 49 ₹6,027 | 19 ₹2,337 |
| 4.00 | Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly to site and all labour charges etc complete | 34 | Sqm | 188 ₹6,392 | 158 ₹5,372 |
| 5.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 90.46 | Sqm | 338 ₹30,575.48 | 308 ₹27,861.68 |
| 6.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 90.46 | Sqm | 235 ₹21,258.1 | 205 ₹18,544.3 |
| 7.00 | Plastering with Cement Mortar 1:3, 10mm thick including cost and conveyance of all materials and labour charges etc., complete | 2.4 | Sqm | 355 ₹852 | 325 ₹780 |
| 8.00 | Plastering with Cement Mortar 1:5, 12mm thick including cost and conveyance of all materials and labour charges etc., complete | 28.01 | Sqm | 30 ₹840.3 | - |
| 9.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 23.88 | Sqm | 292 ₹6,972.96 | 262 ₹6,256.56 |
| 10.00 | Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete | 13.68 | Sqm | 183 ₹2,503.44 | 153 ₹2,093.04 |
Tender Value
₹84,000
Closing Date
25 Feb 2026, 3:00 pmClosed
Block Development Officer BP Kancheepuram
Block Development Office Kancheepuram
Renovation of Two Class Room School Building (PUPS) Ariyaperumbakkam at Ariyaperumbakkam Panchayat in Kancheepuram Union Under Rural Building Maintenance Policy / 2025-26 PKG No.TNKPM 02/2025-26 Est Amt . 0.84 Lakhs
2026_RDTN_660671_1
RC.No. 229/2026/A7 02 Dt.16.02.2026
Open Tender
Civil Works - Others
90 days
Kancheepuram Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
15 May 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Clean removal of cement plaster from walls and Celling including all charges etc complete
Casurina Poles 8cm-10cm dia For Scaffolding
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly to site and all labour charges etc complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Plastering with Cement Mortar 1:3, 10mm thick including cost and conveyance of all materials and labour charges etc., complete
Plastering with Cement Mortar 1:5, 12mm thick including cost and conveyance of all materials and labour charges etc., complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats of block board using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_792680.xls
BOQ • 0.29 MB
Schedule.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid