| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹6.7 LRejected-AOC | ₹6.7 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | Akash Rajasekar L1 | CHANDRASEKARAN C L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 40.79 | Cum | 263.7 ₹10,756.32 | 275 ₹11,217.25 |
| 2.00 | Supplying and filling in foundations and basement with filling sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications | 25.98 | Cum | 2,059 ₹53,492.82 | 2,075 ₹53,908.50 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including including cost and conveyance and all labour charges | 25.98 | Cum | 5,776 ₹1.5 L | 5,785 ₹1.5 L |
| 4.00 | Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. | 159.75 | Cum | 547.5 ₹87,463.13 | 547.5 ₹87,463.13 |
| 5.00 | Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. Deck slab | 4.67 | Cum | 1,095 ₹5,113.65 | 1,095 ₹5,113.65 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges | 25.04 | Cum | 7,085 ₹1.8 L | 7,150 ₹1.8 L |
| 7.00 | Suppliyng fabricating and placing in position Mild steel steel / Ribbed steel grill fo RCC works including cost and conveyance and all labour charges | 0.1 | MT | 91,969 ₹9,196.90 | 91,969 ₹9,196.90 |
| 8.00 | CC 1:11:5:3 mix concrete using including cost and conveyance and all labour charges | 1.05 | Cum | 9,528 ₹10,004.40 | 9,528 ₹10,004.40 |
| 9.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance and all labour charges | 6.75 | Cum | 6,052 ₹40,851 | 6,052 ₹40,851 |
| 10.00 | Provision for Bituman pad | 2.36 | Cum | 719 ₹1,696.84 | 719 ₹1,696.84 |
Tender Value
₹6.7 L
EMD Value
₹6,700
Closing Date
18 Feb 2026, 9:00 amClosed
The Block Development Officer(BP)
Panchayat Union, Ariyalur
Providing CC road at Pottaveli colony street in Pottaveli Panchayat
2026_RDTN_659457_1
R.C.NO.A4/1551/2025, Date.09.02.2026
Open Tender
Civil Works - Roads
90 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹6,700
26 Mar 2026
17 Feb 2026
18 Feb 2026
17 Feb 2026
18 Feb 2026
17 Feb 2026
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including including cost and conveyance and all labour charges
Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete.
Supplying and erecting centering shuttering including cost and conveyance to site and all labours etc., complete. Deck slab
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges
Suppliyng fabricating and placing in position Mild steel steel / Ribbed steel grill fo RCC works including cost and conveyance and all labour charges
CC 1:11:5:3 mix concrete using including cost and conveyance and all labour charges
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance and all labour charges
Provision for Bituman pad
Plastering in CM 1:5 to 12mm thick including cost and conveyance and all labour charges
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
TechnicalBid1.pdf
Tender Documents • 0.31 MB
PriceBid1.pdf
Tender Documents • 0.22 MB
BOQ_791202.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid