Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-Finance BYE PASS N H NEAR STATE BANK OF INDIA SIDHRA JAMMU | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.4 L+₹15,681 (12.6%)Accepted-Finance GOLE GUJRAL JAMMU JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.7 L+₹44,581 (35.9%)Accepted-Finance 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | 3 | Accepted-Finance Found Eligible | |
| 4 | 4₹1.7 L+₹44,881 (36.1%)Accepted-Finance BHAGWATI NAGAR JAMMU | 4 | Accepted-Finance Found Eligible |
| Sl No | Description | Qty | Unit | M/S K S ENGG WORKS L3 | BEE AAR ENTERPRISES L4 | M/S GOPAL ELECTRICAL L2 | GS ENGG WORKS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Repairs to 400 KVA voltage stabilizer at LIS Nud. The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coil. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of copper wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (2 nos.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 210 litre T.oil in stabilizer after heating of the T.oil. Re-installation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load. Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. Complete Job. | 1 | Job | 3,378 ₹1,65,522 | 3,384 ₹1,65,816 | 4,200 ₹1,35,800 | 2,486.38 ₹1,21,832.62 Lowest |
Tender Value
₹1.7 L
EMD Value
₹3,406
Closing Date
30 Sept 2026, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair to 400 KVA Voltage Stabilizer with other allied works at LIS Nud.
2026_IFC_325603_1
MID/AN/45
Open Tender
Electrical and Maintenance Works
Item Wise
15 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹3,406
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
10 Oct 2026
22 Sept 2026
1 Oct 2026
22 Sept 2026
30 Sept 2026
25 Sept 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to 400 KVA voltage stabilizer at LIS Nud. The job involves disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables). Loading the voltage stabilizer in the vehicle by using crane and suitable tools and tackle and shifting the voltage stabilizer to workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the coil. Thereafter dismantling of the core assembly and extraction of the all burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of copper wire of the superior quality and then complete insulating and varnishing of coils. Assembling of the coils to make it a complete unit. Replacement of the rotor switch (2 nos.) by way of p/f of new components, replacing all the damaged /burnt components. Filling of 210 litre T.oil in stabilizer after heating of the T.oil. Re-installation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts. Shifting the voltage stabilizer to LIS and unloading of the voltage stabilizer at site by using crane Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load. Complete job includes the cost of material, labour charges, transportation charges, hiring charges of tools/tackles required at site. Complete Job. | 1 | Job | 65 | ₹65 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1100595.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .