Tender Value
₹20.7 L
EMD Value
₹41,420
Closing Date
8 Jun 2026, 11:00 am2d left
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Providing and Repair of Scour Points for Sewerage of Sector 16 and Village Budhanpur 17 and 18 and Rajiv Indra Colony Panchkula
2026_HBC_525918_1
2026BC1E2271 DE15 48FF A390 14FF44DAE056269HSV
Open Tender
Civil Works
180 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹41,420
Yes
1 Jun 2026
1 Jun 2026
9 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
1 Jun 2026 - 8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | 4.12.1:- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in- charge. 1. All kinds of soil [Through Rate] | 202.62 | P. Cum | 78 | ₹15,804.36 | BI01010001010000000000000515BI0100001112 |
| 2 | 5.23.2:- Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 16.62 | P. Cum | 1,149 | ₹19,096.38 | BI01010001010000000000000515BI0100001113 |
| 3 | 11.5.3:- 12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 268.62 | P. Sqm | 113 | ₹30,354.06 | BI01010001010000000000000515BI0100001114 |
| 4 | 10.76:- Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 50mm thick compacted bed of coarse sand,
filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] | 266.4 | P. sqm | 556 | ₹1,48,118.4 | BI01010001010000000000000515BI0100001115 |
| 5 | 10.100.2:- Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 111.72 | P. Cum | 1,863 | ₹2,08,141.81 | BI01010001010000000000000515BI0100001116 |
| 6 | 17.70:- Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 666 | P. Sqm | 26 | ₹17,316 | BI01010001010000000000000515BI0100001117 |
| 7 | 17.71:- Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate] | 399.6 | P. Sqm | 66 | ₹26,373.6 | BI01010001010000000000000515BI0100001118 |
| 8 | 7.21.2:- Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 61.78 | P. Cum. | 3,968 | ₹2,45,143.04 | BI01010001010000000000000515BI0100001119 |
| 9 | 21.93.1:- Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the ngineerin- charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 37 | Each. | 1,155 | ₹42,735 | BI01010001010000000000000515BI0100001120 |
| 10 | 21.94.3:- Providing salt glazed stone ware pipes grade ‘A’ in standard length of 600 mm each pipe marked with IS: 651 and their lowering, cutting, jointing and testing as described in item No. 21.38, 21.39, item 21.40 including the cost of jointing materials as well as carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction of Engineer-in-charge. 3.
200mm i/d [Through Rate] | 450 | P. Mtr. | 238 | ₹1,07,100 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_604886.xls
BOQ • 0.28 MB
AD0154770.pdf
Additional Documents • 0.53 MB
OT0154770.pdf
Other Document • 0.09 MB
Download all tender documents and submit your bid