Karnataka Power Corporation Limited
MANJUNATH SONNAD
9449597971
As per bid document
KPCL/2024-25/PS/WORK_INDENT2549
KPCL/2024-25/PS/WORK_INDENT2549
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Superintending Engineer MM one Office RTPS Raichur
8 documents required · 4 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intending bidder shall have experience in Supply / Erection / Maintenance of Turbine HP Heaters / LP Heaters / Deaerator / Hotwell level control valves of thermal power station of capacity 210MW and above. As a proof, bidder shall furnish work orders OR Purchase orders.
The intending bidder should have satisfactorily completed, as a prime contractor at least one similar work such as Supply / Erection / Maintenance of Turbine HP Heaters / LP Heaters / Deaerator / Hotwell level control valves of value not less than Rs 45.00 Lakhs in any one financial year during last five years (2019-20, 2020-21, 2021-22, 2022-23 2023-24) and shall upload the corresponding Work done certificate/Work Completion certificate/MOM/PO & corresponding invoice issued by competent authority. (Work done of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year in which the tenders are invited).
The intending bidder in his name should have achieved an average annual financial turnover of Rs 88.48 Lakhs in at least two financial years during the last five years (2019-20, 2020-21, 2021-22, 2022-23 & 2023-24). As a proof of this the bidder shall upload the certified copy of the Profit and Loss account statement or Turnover certificate duly certified by the Chartered Accountant. (Turnover of previous years shall be given weightage of 10% per year to bring them to the present price level of the financial year in which the tenders are invited).
₹1,880
₹1.8 L
30 Jan 2025
30 Jan 2025
8 Feb 2025
4 Feb 2025
Supply, Erection, Testing and Commissioning of U-3 Level Control Valves
Supply of complete assmbly of Fisher/ILP make Deaerator level control valve
Supply of complete assmbly of Fisher/ILP make HP Heater 5 level control valve (Normal)(HPH-5 to DEA)
supply of complete assmbly of Fisher/ILP make HP heater 5 level control valve (Emergency)(HPH-5 to FT)
Supply of complete assmbly of Fisher/ILP make HP Heater 6 level control valve (Normal)(HPH-6 to 5)
Supply of complete assmbly of Fisher/ILP make HP Heater 6 level control valve (DEA)(HPH-6 to DEA)
Supply of complete assmbly of Fisher/ILP make HP Heater 6 level control valve (Emergency)(HPH-6 to FT)
Supply of complete assmbly of Fisher/ILP make hotwell level control valve (DM-5)
Supply of complete assmbly of Fisher/ILP make hotwell level control valve (DM-6)
Dismantling of existing valve and erection of new Fisher/ILP make Deaerator level control valve
Dismantling of existing valve and erection of new Fisher/ILP make HP Heater 5 level control valve (Normal)(HPH-5 to DEA)
Dismantling of existing valve and erection of new Fisher/ILP make HP heater 5 level control valve (Emergency)(HPH-5 to FT)
Dismantling of existing valve and erection of new Fisher/ILP make HP Heater 6 level control valve (Normal)(HPH-6 to 5)
Dismantling of existing valve and erection of new Fisher/ILP make HP Heater 6 level control valve (DEA)(HPH-6 to DEA)
Dismantling of existing valve and erection of new Fisher/ILP make HP Heater 6 level control valve (Emergency)(HPH-6 to FT)
Dismantling of existing valve and erection of new Fisher/ILP make hotwell level control valve (DM-5)
Dismantling of existing valve and erection of new Fisher/ILP make hotwell level control valve (DM-6)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid documents U3 R&M control valves finalised.pdf
Tender Document • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].