| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹1.6 Cr+₹1.6 L (1.01%)Rejected-AOC | ₹1.6 Cr+₹1.6 L (1.01%) | L2 | Rejected-AOC REJECT |
Tender Value
₹2 Cr
EMD Value
₹2 L
Closing Date
28 Feb 2024, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
The Commissioner, Coimbatore Corporation
Restoration Of Bt Surface at SURIYA NAGAR STREET 1 CUT ROAD 1 162056R11152, SURIYA NAGAR STREET 1 CUT ROAD 2 162056R11153, SURIYA NAGAR STREET 1 CUT ROAD 3 162056R11154, SURIYA NAGAR STREET 1 CUT ROAD 4 162056R11155,SURIYA NAGAR STREET 1 CUT ROAD 5
2024_MAWS_425974_2
e15/2023
Open Tender
Civil Works - Roads
Works
120 days
Coimbatore corporation-
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹2 L
3 May 2024
17 Feb 2024
29 Feb 2024
17 Feb 2024
28 Feb 2024
17 Feb 2024
Amount
Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification
Removal of Excavated Excess Earth away from the site to 5 K.M including loading and transportation charges etc, complete as per standard
Charges for cutting the B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers.
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base /base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime Coat 7Kg/10 M2 With Bitumen Emulsion (Slow Setting) Including Cost of Bitumen emulsion At The Site Including Labour Charges For Preparing The Surface And Applying Required Quantity of Bitumen Emulsion As Prime Coat Using Bitumen Sprayer Etc. Complete Over Wet Mix Macadam As Per Clause 502 of Mort & H Specifications.
Providing and laying Tack Coat 2.5 kg/10 m2 with Bitumen Emulsion (Rapid Setting 1) including cost of bitumen emulsion at the site, including labour charges for preparing the surface and applying required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete over the primed surface as per clause 503 of MoRT& H Specifications Rev.5
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Advance Bitumen Patch repair work with bituman 80/100 premixed chips 50 mm thick 13.20 mm IRC HBG metal premixed with 44 kg Bitumen per cubic metre of Chips to the road and consolodation thick of 50 mm with all cost of materials and labour charges etc completed as per the standard specification.
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.25 kgs of VG60/ VG70 bitumen,5.03 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm /30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Plastic 8 % )
K.NATARAJAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .