Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-Finance | ₹10.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹10.5 L+₹19,998.39 (1.94%)Accepted-Finance | ₹10.5 L+₹19,998.39 (1.94%) | L2 | Accepted-Finance L2 |
Tender Value
₹10 L
EMD Value
₹5,000
Closing Date
21 Apr 2026, 11:00 amClosed
COMMISSIONER
MUNICIPAL COUNCIL, SRI GANGANAGAR
Construction of a hall at Shri Dharmasangh Ved Vidyalaya Trust, Gram Panchayat 4 Z Chak 1 B Chhoti, Sri Ganganagar (MLA LAD)
2026_DLB_551370_1
NIT-01/2026-27
Open Tender
Civil Works
Percentage
120 days
MUNICIPAL COUNCIL, SRI GANGANAGAR
FIRM REGI, GST, TENDER, PROCESSING FEES, EMD, ONLINE CHALLAN PAYMENT COPY AND OTHER NECESSARY DOCS
2 documents required · 2 mandatory
₹1,000
COMMISSIONER
₹5,000
24 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 1 | Cum | - | - |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 0.6 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level : 1:4:8 (1 Cement : 4 Fine / coarse sand : 8 graded stone aggregate 40mm nominal size) | 0.4 | Cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 0.2 | Cum | - | - |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.8 | Cum | - | - |
| 6 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : In cement mortar 1:6 (1 cement : 6 coarse sand) | 0.2 | Cum | - | - |
| 7 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix:
1:4 (1 cement : 4 fine/ coarse sand) | - | Sqm | - | - |
| 8 | Providing and fixing pressed steel door frames confirming to IS: 4351 manufactured from commercial mild steel sheet of 1.25 mm thickness including hinges jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25mm, or base ties of 1.25mm pressed mild steel welded or rigidly fixed together by mechanical means, adjustable lugs with split end tail to each jamb including steel butt hinges 2.5mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer-in-charge: Profile E | - | Mtr | - | - |
| 9 | Centering and shuttering at all levels including at all levels including strutting, propping etc. and removal of form for : Susupended floors, roofs, landings, balconies and access platform. | - | Sqm | - | - |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_982552.xls
BOQ • 0.38 MB
NIT01.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .