Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹39.5 L+₹79,887 (2.06%)Rejected-Finance 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L2 | Rejected-Finance Found in order but L2 | |
| 3 | Rejected-Technical 289 KASERU KHERA MAWANA ROAD MEERUT 250001 U P | MEERUT | UTTAR PRADESH | 250001 | - | Rejected-Technical Your firm not enlisted in desired category. | |
| 4 | Rejected-Technical 79 B BLOCK SRI GANGANAGAR 335001 RAJASTHAN | GANGANAGAR | RAJASTHAN | 335001 | - | Rejected-Technical Your firm not enlisted in desired category. |
Tender Value
Refer Docs
EMD Value
₹76,516
Closing Date
30 Dec 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HQ CWE Meerut
29J The Mall Road Meerut Cantt Uttar Pradesh 250001
SPL REPAIR OF 06 NOS RTCC PANELS, OLTCS OF 06 NOS OF POWER TRANSFOERMER AND ALLIED ITEMS AT 33 KV MRS ROORKEE ROAD, SHIVAJI LINE AND BHAGAT LINE UNDER GE (U) MEERUT CANTT
2024_MES_686477_1
94166/MRT/2024-25/E8
Open Tender
Civil Works
Item Rate
180 days
Meerut Cantt
Please refer Tender documents
7 documents required · 7 mandatory
₹500
GE (U) E/M Meerut
₹76,516
Yes
28 Feb 2025
30 Nov 2024
2 Jan 2025
30 Nov 2024
30 Dec 2024
16 Dec 2024
Amount
Dismantling of old u/s & Supply, installation, commissioning & testing of ON-load Tap motion generator anticlockwise and clockwise on HV side to vary secondary voltage from (+) 10% TO (-) 15% in steps of 1.25%, HV / Dielectric strength not less than 45KV at 2.5 mm, Digital MICROPROCESSOR CARD along with upgrading the existing RTCC panel including replacement of existing manual Relay with new AVR Relay (MAKE PARTNER/ ISO 9001:2015 CERTIFIED), having following specification:-The RTCC shall be upgraded such that it will maintain electrical properties, even under severe overload, under/over voltage and under/over frequency conditions. Input correction range shall be -30% to +20% of nominal input voltage. Upon turn on or restart, the output of the 33/11 KV TFR shall not exceed the specified output regulation limits. if the input voltage or frequency exceeds programmable minimum or maximum set points for a programmable time period (factory set for 10 seconds),When electrical parameters are back within acceptable limits for a programmable time period (factory set for 60 seconds), the output voltage is outside of acceptable programmed limits, the RTCC must give output command to electronically operate connected 33 KV Transformer. Response Time: RTCC Line Voltage Regulation and Correction Time: Output regulation shall be +5%, -6%, given an input voltage variation of -30% to +30% for nominal, when within +/-5% of the nominal frequency. Load Regulation: No load to full load regulation shall be 3% typical under linear loading.
Note: The existing RTCC shall be adjusted so that the combination of line voltage regulation and linear load regulation results in a maximum output voltage variation of +7% to -8% from nominal, when within +/-5% of the nominal frequency. Operating Frequency: The existing RTCC shall be capable of operating at +10% to -15% of the nominal frequency, 50Hz, with programmable high and low limits to alarm and electronically shut down the SF6 Breaker. Limits shall be set to +/-2Hz from nominal and electronic shutdown shall occur if limits are exceeded for 10 seconds. Once back within limits for a programmable time period of 60 seconds, the SF6 Breaker shall automatically restart. Over Voltage/Under Voltage Protection: against UV/OV. (2 Nos each at Roorkee Road, Shivaji Line & Bhagat Line MRS). An aux. relay is energized to operate an hooter. The UV and OV state is shown on the LCD. You can also set the AVR to get an SMS on your mobile phone in case of OV/UV. The affect in change in voltage takes place only after the time delay (TD) has elapsed as set by the user. In other words, the relay will send command to the motor only after the time delay has elapsed. This is required to avoid the motor start/stop on frequent voltage fluctuations. This delay time can be set from 5 to 125 seconds. This refers to the drop in line voltage from generating end to transformer primary. The LDC helps the AVR to compensate this drop. The feature is added on request on charge-able basis. In case auxiliary supply to AVR fails (from PT), the AF relay gets activated. You can also set the AVR to get an SMS on your mobile phone in case of auxiliary supply failure. If the OLTC/AVR malfunctions because of any reason for certain preset time (say 10 minutes) then the CF relay will get energised and activated. An alarm can be connected with this relay contacts. Once the controls resume the normal functions, the relay gets de-energized putting the alarm off. All this can be seen on the LCD.
You can also set the AVR to get an SMS on your mobile phone in case of control failure of the OLTC AVR. This feature is used to indicate the tap position. The tap position is displayed on the LCD. You can get tap position on your mobile phone also (on request). Card can be monitored and control through a wireless SCADA application from anywhere in the world. You can monitor the complete parameters of a transformer like electrical parameters, winding temperature (sensor required), oil temperature (sensor required), oil level (sensor required), buclotz relay status. oil leakage (sensor required). You can connect 4 X analog sensors (4 - 20 mA OR 0 - 5 volts) to record and monitor the health of the HT transformer. You can connect 4 x digital sensor (pulse/counter) to check the status of transformer buchlotz's relay, transformers breaker etc.,You can connect winding temperature sensor, oil temperature sensor, oil level sensor at the analog inputs. Data can be monitored on LCD display of the OLTC AVR. If the AVR is GPRS enabled then you can also monitor the live data on SCADA application. In case a transformer if getting overloaded, provision for an instant alert on 5 mobile numbers so as to take immediate action.
Optional feature can also be provided to start an alarm or switch off the breaker and hence the transformer to save it from over-heating,ONLY Original OEM is entitled for work. Contractor has to ensure it.Necessary test certificates & Purchase Vouchers to be submitted by the contractor. Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately at the time of completion of work. Contractor has to submit Post Audit report of work, without that completion will not be issued. All as specified and directed.
Supply, Insallation, Testing & Commissioning in replacment of TC on load interlockable changeover cum corrector system along with indoor type 3-phase main Auto Synchronizing automatic120 degree phase angle corrector for motor protection comprising of 2 Nos. of power contactor of current rating 110 Amps both paralleled output having electronic RC (resistor-capacitor) network comprising of 3 phase transformer unit operating voltage 440 volts, insulation upto 500 Volt, signal command 0-15 volts, built with integrated operational amplifier circuit featuring the output to give correct phase (i.e. RYB irrespective whether input is RYB, YRB or BRY) irrespective either supply is coming from Mains or standby supply and also featuring single phasing prevention in case of phase failure at input/output, connecting its output to common bus bar of existing panel equipped with digital three phase voltmeter Accuracy Cl. 0.5 (model No. DM3210 of CONZERV (Schneider) or an equivalent model of Areva / Neptune / Secure) enclosed in & including suitable size powder coated enclosure, duly painted with two coats of synthetic enamel paint over a coat of red oxide primer, complete all as specified and as directed by Engineer-in-Charge. (MAKE : PARTNER Cat part No PI3PSQ110 /SIEMENS/L&T/BCH ) MINIMUM 1SO 9001:2015 CERTFIED ONLY Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates & Purchase Vouchers to be submitted by the contractor. Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately at the time of completion of work. Contractor has to submit Post Audit report of work, without that completion will not be issued. (01 Nos each at Roorkee Road, Shivaji Line & Bhagat Line MRS).
User interface should be remotely accessible on internet, with secure login credentials. User interface should work on secure https. Communication between data gathering, and data storage should be over a secure encrypted channel. IIOT controller must have inbuild local control capability to operate in case of network unavailability. However, control logics must be configurable remotely. The user-interface should have minimum of following tabs (all dashboards, reports must be self-configurable without any scripting or OEM intervention): Dashboard - To evaluate captured parameters at a glance with current, hourly, daily, weekly, monthly, & yearly. End-user should be able to create Dashboards on their own, without AF involvement. End user should be able to define number of rows / columns in dashboard, merge cells of dashboard to make some areas small / large, configure row heights to provide flexibility in how data is displayed (ex. multiple numerical KPIs in a smaller row, and graphs in a larger row to utilize displayed area of dashboard optimally).
Histograms/Pie charts/Bar graphs/line graphs/ donut graph, area graph, heatmap graph shall be available. System should support Time vs Time comparison of captured parameters by showing data of interested days/months adjacent to each other (example: 9th day of this month, and last month displayed adjacent to each other) System should support Spend Analysis (money equivalent of energy, and not just units of energy) System should support creating user-defined KPIs (max, min, aggregated Sum, averaged values over day, week, month) system should support creating user-defined benchmarks, and displaying data in charts / dashboard comparing against these benchmarks System should support saving frequently used analytics charts for later users. All saved charts should be available to choose with a single-click. System should support showing analytics data in graphical and tabular form. Facility to export data over a custom time interval to Excel shall be available. Reports should be user-defined and not fixed (hardcoded into the system). System should support sending daily, weekly and monthly reports. Daily reports should be sent next day morning over email incorporating all data from previous day.
There should be a mechanism to turn reporting sending of scheduled reports ON/OFF There should be a mechanism to send a pre-created report on-demand (and not just as scheduled daily / weekly / monthly report) Settings - To view the metadata related to the system, such as the site name and installation date, details of equipment at site etc. Alarms and event logs – Alarm should Issue a system update that the system has detected. Passwords should be stored in encrypted format. Website should be accessible on all platforms and be compatible with popular browsers such as IE, Chrome, Firefox, Safari etc. Online Administration: All administration is handled online via a current web browser Audit Trail: Administrators can access logs in the backend on need-basis where they can view changes that have been made to the database for critical information. Data Backup should support PITR (Point-in-time-recovery). Scheduler for auto archival and backup of application and database to a different machine which should be capable of coming online by simply firing a script button in event of downtime of primary server. The database should use encryption at rest to persist the data in database.
Secure password protected login for administrative actions in the system. All updates to data gathering hardware should be through OTA (over the air). No static IPs shall be made available at sites. The complete equipment must be programmed with protection CT inside the existing Low Tension switchgear /breaker / Switching Contactors along with multifunction microprocessor digital programmer having Main measurements and functions include: Voltage: phase, line and system values Current: phase values (neutral current calculated) Power: apparent, active and reactive phase and total values Power Factor per phase and total Frequency of measured voltage value HIGH LOW AVERAGE - - value functions for all measurements Maximum demand of power and current values Voltage and current asymmetry Total harmonic distortion ( ): voltage and current THD Energy meters for active, reactive, apparent partial and total values, per phase and system values Hour counter for programmable total and partial hours Phase active power unbalance must saturate sufficiently high to allow a relatively accurate measurement of the fault current by the protection whose operating threshold can be very high. with built in high Accuracy Limit Factor (ALF) ratio between the nominal overcurrent and the rated current. so that existing switchgear relay must be able to withstand high overcurrent’s also featured with Real accuracy factor ratio between the overcurrent , nominal error and the rated current .with following specifications insulation level voltage .433 KV ratio 100/5A - to 500/5A Core 3 class PS, KPV >= 150 Volts Imag at vk/2<= 30 ma , RCT at 75C<= 2 Ohms short time rating 15 KA for 1 second , SIEMENS/SCHNIDER/ ABB. approved by GE minimum ISO 9001:2015 Certified .ONLY Original OEM is entitled for work . Contractor has to ensure it. Necessary test certificates & Purchase Vouchers to be submitted by the contractor. Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately at the time of completion of work. Contractor has to submit Post Audit report of work, without that completion will not be issued.
Supply and fix New DC interface change over supply system capacity up to 110 volts DC supply 75 Amp load with zero crossing switching enabled for uninterupted power supply to auto tripp / auto close coils and distribution systems of exsisting feeder panels equipped with short circuit ,overload protection and bye pass feature Make Partner/BCH/ABB/Schneider The entire work is to be executed by OEM only approved by GE. The Contractor has to submit Original Purchase Vouchers, Test Certificates & Guarantee Certificate from OEM before installation at site. (01 Nos each for Roorkee Road, Shivaji Line & Bhagat Line MRS).
Dismentaling of old damaged burnt fuse kit kat assembly and replace with Supply instalation testing and commissioning of Surge voltage arrester consisting of base element with remote indicator contact and ground connectors, for mounting on NS 35/7.5, nominal voltage: 230 V AC, 3 + 1 circuit protection With floating remote indication contact Multi-channel type 2 arresters Optical, mechanical status indication for the individual arresters Type 2 consistent plug-in surge arresters Mechanical coding of all slots Disconnect device on each individual plug , Ambient temperature (operation) -40 °C to 80 °C Ambient temperature (storage/transport) -40 °C to 80 °C Altitude ≤ 2000 m (amsl (above mean sea level)) Permissible humidity (operation) 5 % to 95 % Shock (operation) 25g (Half-sine / 11 ms / 3x ±X, ±Y, ±Z) Vibration (operation) 5g (10 to 500 Hz / 2.5 h / X, Y, Z) General IEC test classification II T2 EN type T2 IEC power supply system TN-S TT Mode of protection L-N L-PE N-PE Mounting type DIN rail: 35 mm Color jet black RAL 9005 Housing material PA 6.6 PBT Degree of pollution 2 Flammability rating according to UL 94 V-0 Type DIN rail module, two-section, divisible Number of positions 4 Surge protection fault message Optical, remote indicator contact Protective circuit Nominal voltage UN 240/415 V AC (TN-S) 240/415 V AC (TT) Nominal frequency fN 50 Hz (60 Hz) Maximum continuous operating voltage UC (L-N) 275 V AC Maximum continuous operating voltage UC (L-PE) 275 V AC Maximum continuous voltage UC (N-PE) 260 V AC Rated load current IL 80 A Residual current IPE ≤ 5 µA Standby power consumption PC ≤ 360 mVA Nominal discharge current In (8/20) µs 20 kA Maximum discharge current Imax (8/20) µs 40 kA current interrupt rating Ifi (N-PE) 100 A Short-circuit current rating ISCCR 25 kA Voltage protection level Up (L-N) ≤ 1.35 kV data Protective circuit Voltage protection level Up (L-PE) ≤ 1.6 kV Voltage protection level Up (N-PE) ≤ 1.5 kV Residual voltage Ures (L-N) ≤ 1.35 kV (at In) ≤ 1.1 kV (at 10 kA) ≤ 1 kV (at 5 kA) ≤ 0.9 kV (at 3 kA) Residual voltage Ures (L-PE) ≤ 1.6 kV (at In) ≤ 1.2 kV (at 10 kA) ≤ 1 kV (at 5 kA) ≤ 0.9 kV (at 3 kA) Residual voltage Ures (N-PE) ≤ 0.4 kV (at In) ≤ 0.25 kV (at 10 kA) ≤ 0.15 kV (at 5 kA) ≤ 0.1 kV (at 3 kA) TOV behavior at UT (L-N) 335 V AC (5s / withstand mode) 440 V AC (120 min / safe failure mode) TOV behavior at UT (N-PE) 1200 V AC (200 ms / withstand mode) Response time tA (L-N) ≤ 25 ns
Response time tA (L-PE) ≤ 100 ns Response time tA (N-PE) ≤ 100 ns Max. backup fuse with V-type through wiring 80 A (gG) Max. backup fuse with branch wiring 125 A (gG) Indicator/remote signaling Switching function PDT contact Operating voltage 5 V AC to 250 V AC 30 V DC Operating current 5 mA AC to 750 mA AC 1 A DC Connection method Plug-in/screw connection via COMBICON Screw thread M2 Tightening torque 0.25 Nm Stripping length 7 mm Conductor cross section flexible 0.14 mm² to 1.5 mm² Conductor cross section solid 0.14 mm² to 1.5 mm² Conductor cross section AWG 28 to 16 Connection data Connection method Screw connection. Make CITEL/ABB/SCHNEIDER/PHONIX. The entire work is to be executed by OEM approved by GE. The Contractor has to submit Original Purchase Vouchers, Test Certificates & Guarantee Certificate from OEM at the time of installation at site to Engineer-in-Charge/ GE. (02 Nos each for Roorkee Road, Shivaji Line & Bhagat Line MRS)
Dismentaling of old Mechanical on load changeover and Supply and fix On load changover 3 phase type and replacement Phase failure and undervoltage monitoring of primary supply. Interlocked contactor switching. AUTO Changeover switching. Manual override of supplies. Supply available indication. Supply in use indication. Adjustable time delay between switching. with new on load auto interlock changeover system equipped with two switchgear contactors not less than 16 Amps three pole and following parameters Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for 3 phase load of Potential Transformer , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection.ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM BUILT WITH SCROLLING DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY AND POWER FACTOR Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting currrent =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UB, OV, UV , Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set.,
Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL ,Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time. MAKE PARTNER /SIEMENS/SCHNIDER/BCH/L&T ONLY Original OEM is entitled for work . Contractor has to ensure it. Necessary test certificates & Purchase Vouchers to be submitted by the contractor. Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately at the time of completion of work. Contractor has to submit Post Audit report of work, without that completion will not be issued. (01 Nos each for Roorkee Road, Shivaji Line & Bhagat Line).
M/S Sonu Traders (BID ID -3194256)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .