Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹20.2 L
EMD Value
₹40,000
Closing Date
21 Sept 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Yogesh Kushwaha
Plot No-4, Unit-41, Niladri Vihar, Chandrashekharpur, Bhubaneswar-751021
Re-Construction of Collapsed & tilted portion of Boundary Wall at POWERGRID Baripada Substation (Under AM Budget)
ER2/NT/W-CIVIL/DOM/EC4/23/06277
Limited
Civil - All
Works
Baripada
₹40,000
5 Sept 2023
5 Sept 2023
21 Sept 2023
5 Sept 2023
21 Sept 2023
5 Sept 2023
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.
Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: all shapes and sizes in :
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
15 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Providing and fixing up to floor five level cement concrete for copings sills,shelves hosting,
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.in cement mortar
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Structural Steel work required to be re-erected all complete as per instruction of EIC
Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :One or more coats on old work
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):From brick work in cement mortar
Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.in cement mortar
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: all shapes and sizes in :
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
15 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm)
: Civil Works Package - :
2 or More
JV (Joint Venture)
180 (One Hundred and Eighty Days)
Average annual turnover (in INR)
Details of Contract & Date
Tentative Completed date
Qualification
Ref/ Page No.
Ref/ Page No.
Ref/ Page No.
Ref/ Page No.
POWER GRID CORPORATION OF INDIA LIMITED,
Section
Clause No./ Page No.
Ref. and Page No.
Ref. and Page No.
Period in weeks (from the effective date of LOA)
Date of Retirement/ resignation from POWERGRID
Date of Retirement/ resignation from POWERGRID
Date of Retirement/ resignation from POWERGRID
180 (One Hundred and Eighty Days)
Name of the published index
Wholesale Price Index Number for ‘High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Wholesale Price Index Number for ‘Ferrous Metals’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Wholesale Price Index Number for High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Wholesale Price Index Number for ‘Cement & Lime’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Wholesale Price Index Number for ‘Structural Clay Products’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
JV (Joint Venture)
FALSE
We have enclosed a Bid Guarantee in original and one copy in the form of Bank Guarantee (Bank Guarantee No.-, dated DD-MM-YYYY issued from ) for a sum of Rupees /-, Valid for a period of Seven [07] calendar months from the date of opening of bids i.e. upto and inclusive of DD-MM-YYYY.
EMD DETAIL FORM
Bank Guarantee No.
Name of Issuing Bank :
Clause No 13.0, ITB, Section -II and cl. 3.0 SCC, Section-IV, Volume-I
Clause No.64.0, Conditions of Contract (GCC) & Clause 11.0, SCC
Clause No.14,Section GCC, Vol.-I ,Conditions of Contract & Clause 12.0 of SCC, Section-IV, Vol-I & Clause 33.0 of ITB, Volume-I
Clause No 10.0 of SCC, Volume-I
Clause No 11.0 of ITB,
Cl.No.45.0 & 46.0 Section. GCC, Vol. I, Conditions of Contract & Clause 8.0 of SCC, Volume- I
Clause No. 9.0 of SCC, Volume -I
Banks certified Cheque
Bank Guarantee
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
Attachment-26 Declaration regarding events encountered pursuant to ITB Clause 2-1.docx
docx • 0.03 MB
Attachment-27.doc
doc • 0.04 MB
Bill of Material.xlsx
xlsx • 0.07 MB
First Envelope and Bid Forms.xlsx
xlsx • 0.67 MB
4. Damaged and Cracked Boundary Wall.pdf
pdf • 1.93 MB
Drawing of Boundary wall.pdf
pdf • 0.32 MB
Standard Field Quality Plan Civil Works for Site Packages Revision 04.pdf
pdf • 2.22 MB
1. Photos of Collapsed Boundary wall.pdf
pdf • 2.61 MB
2. Temporary Fencing Arrangement.pdf
pdf • 0.75 MB
3. Photos of Tilted Boundary Wall.pdf
pdf • 3.13 MB
Thumbs.db
db • 0.03 MB
01 Invitation for Bids (IFB)-Section-I.docx
docx • 0.16 MB
02 Instructions to bidders(ITB)-Section-II.pdf
pdf • 0.55 MB
03 Bid Data Sheets (BDS)-Section-III.doc
doc • 0.38 MB
03A ANNEX-B (BDS) Sample E-stamp paper.pdf
pdf • 0.08 MB
03B ANNEX-D(BDS)-Undertaking for Authenticity.DOC
doc • 0.05 MB
04 Conditions of Contract Civil Works.pdf
pdf • 0.39 MB
04A GCC Civil Amendments I - IX.pdf
pdf • 1.46 MB
05 SCC-Section-V.docx
docx • 0.10 MB
06 ANNEXURE-I, II ,III ,IV & V of SCC.docx
docx • 0.04 MB
07 ANNEX-D (SCC) SA 8000 2008.pdf
pdf • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .