| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.3 L+₹10,137.28 (2.41%)Admitted-Fee/PreQual/Technical/Finance | ₹4.3 L+₹10,137.28 (2.41%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.6 L+₹34,691.07 (8.25%)Admitted-Fee/PreQual/Technical/Finance | ₹4.6 L+₹34,691.07 (8.25%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R. KUMAR L2 | P MURUGAN,WORKS CONTRACTOR L3 | Palani Andavar Constructions L1 |
|---|---|---|---|---|---|---|
| 1.00Conversion of community Hall into Integrated Kitchen for Morning Breakfast | ||||||
| 1.01 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. -Mixing by manual means | 6 | m3 | 5,525.8 ₹33,154.8 | 4,819 ₹28,914 Lowest | 5,395.78 ₹32,374.68 |
| 1.02 | Brick work in CM 1:5 (one cement & five sand) using III class country bricks of size 8 3/4"X4 1/4" X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 4 | m3 | 6,638.64 ₹26,554.56 | 5,651.1 ₹22,604.4 Lowest | 6,482.44 ₹25,929.76 |
| 1.03 | Special ceiling plastering and finishing the exposed surface of all RCC items of work
such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab
etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 4 | M2 | 335.94 ₹1,343.76 | 291 ₹1,164 Lowest | 328.03 ₹1,312.12 |
| 1.04 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 33 | M2 | 291.87 ₹9,631.71 | 252 ₹8,316 Lowest | 285.01 ₹9,405.33 |
| 1.05 | Supply and delivery and fixingof HDPE tank as per IS 12701 /1996 including loading, unloading,transportation and labour chargesfor fixing of the GI pipes andspecials for pipe connectionworks including cutting, threadingand fixing charges etc.,1000litre | 2 | E | 8,603.7 ₹17,207.4 | 7,120 ₹14,240 Lowest | 8,401.26 ₹16,802.52 |
| 1.06 | Supplying and fixing 32mm Dia PVC Pipe | 28 | M | 66.05 ₹1,849.4 | 53.96 ₹1,510.88 Lowest | 64.49 ₹1,805.72 |
| 1.07 | Supplying and fixing 25mm Dia PVC Pipe | 16 | M | 44.12 ₹705.92 | 41.5 ₹664 Lowest | 43.08 ₹689.28 |
| 1.08 | Supplying and fixing 20mm Dia PVC Pipe | 3 | M | 17.44 ₹52.32 | 21.25 ₹63.75 | 17.03 ₹51.09 Lowest |
| 1.09 | Supplying and fixing PVC Specials
32mm Dia PVC Elbows | 12 | E | 14.54 ₹174.48 | 11.46 ₹137.52 Lowest | 14.19 ₹170.28 |
Tender Value
Refer Docs
EMD Value
₹5,500
Closing Date
17 Aug 2026, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Conversion of community Hall into Integrated Kitchen for Morning Breakfast ward no.52
2026_MAWS_689984_1
64/2026-27/AEE
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Conversion of community Hall
Registered Contractor
3 documents required · 3 mandatory
₹0
₹5,500
17 Aug 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Conversion of community Hall into Integrated Kitchen for Morning Breakfast | |||||
| 1.01 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. -Mixing by manual means | 6 | m3 | - | - |
| 1.02 | Brick work in CM 1:5 (one cement & five sand) using III class country bricks of size 8 3/4"X4 1/4" X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 4 | m3 | - | - |
| 1.03 | Special ceiling plastering and finishing the exposed surface of all RCC items of work
such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab
etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 4 | M2 | - | - |
| 1.04 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 33 | M2 | - | - |
| 1.05 | Supply and delivery and fixingof HDPE tank as per IS 12701 /1996 including loading, unloading,transportation and labour chargesfor fixing of the GI pipes andspecials for pipe connectionworks including cutting, threadingand fixing charges etc.,1000litre | 2 | E | - | - |
| 1.06 | Supplying and fixing 32mm Dia PVC Pipe | 28 | M | - | - |
| 1.07 | Supplying and fixing 25mm Dia PVC Pipe | 16 | M | - | - |
| 1.08 | Supplying and fixing 20mm Dia PVC Pipe | 3 | M | - | - |
| 1.09 | Supplying and fixing PVC Specials
32mm Dia PVC Elbows | 12 | E | - | - |
stage.html
html • 0.02 MB
finance_829428.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_829428.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .