Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAccepted-Finance SHOP NO 1 2 3 LAXMI NARAYAN ESTATE BEHIND PNB REWA ROAD SATNA MP 485001 | SATNA | SATNA | MADHYA PRADESH | 485001 | ₹9.4 Cr | L1 | Accepted-Finance Qualified |
| 2 | L2₹9.8 Cr+₹40.9 L (4.35%)Rejected-Finance | ₹9.8 Cr+₹40.9 L (4.35%) | L2 | Rejected-Finance Disqualified |
Tender Value
₹10.5 Cr
EMD Value
₹5.2 L
Closing Date
22 Jun 2026, 5:00 pmClosed
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
CHHATRAPATI SHIVAJI BHAWAN, AGAR ROAD UJJAIN
Development and Beautification of Central Divider Green Belt Service Lane and Other Necessary work of MR 2 Road from Nanakheda Bus Stand to Dewas Road Ujjain
2026_UAD_489111_3
27/Simhasth Cell/2026
Open Tender
Civil Works - Roads
Percentage
365 days
Nanakheda Bus Stand to Dewas Road Ujjain
YES PLEASE REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹30,000
₹5.2 L
Ujjain
28 Jul 2026
5 Jun 2026
23 Jun 2026
5 Jun 2026
22 Jun 2026
12 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transplantation of trees including trimming the branches of full grown trees as per the requirement, giving the wax treatment of the trimmed area of branches, uprooting the tree and transporting the uprooted tree to the specified site of the transplantation as directed by the engineer-in-charge upto 12 km lead including all lifts, transplanting the uprooted tree by digging a required size of pit, filling it with fresh garden soil and manure as per the requirement and maintaing it for a period of 4 months by watering,weeding, manuring etc complete. A) Trees having trunk girth upto 1.0 metre | 28 | Each | 4,241 | ₹1,18,748 |
| 2 | Transplantation of trees including trimming the branches of full grown trees as per the requirement, giving the wax treatment of the trimmed area of branches, uprooting the tree and transporting the uprooted tree to the specified site of the transplantation as directed by the engineer-in-charge upto 12 km lead including all lifts, transplanting the uprooted tree by digging a required size of pit, filling it with fresh garden soil and manure as per the requirement and maintaing it for a period of 4 months by watering,weeding, manuring etc complete. B) Trees having trunk girth more than 1.0 metre upto 1.5 meter | 3 | Each | 6,362 | ₹19,086 |
| 3 | Transplantation of trees including trimming the branches of full grown trees as per the requirement, giving the wax treatment of the trimmed area of branches, uprooting the tree and transporting the uprooted tree to the specified site of the transplantation as directed by the engineer-in-charge upto 12 km lead including all lifts, transplanting the uprooted tree by digging a required size of pit, filling it with fresh garden soil and manure as per the requirement and maintaing it for a period of 4 months by watering,weeding, manuring etc complete. D) Trees having trunk girth more than 2.0 metre | 3 | Each | 10,178 | ₹30,534 |
| 4 | Dismantling of existing structures by manual means comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 meter and as per relevant clauses of section-200 in Removing all type of R.C.C. pipes and stacking within a lead upto 1000 meter including earthwork and dismantling of masonry works around pipes. Up to 600 mm dia | 120 | Meter | 165 | ₹19,800 |
| 5 | Dismantling of existing structures by manual means comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 meter and as per relevant clauses of section-200 in Removing all type of R.C.C. pipes and stacking within a lead upto 1000 meter including earthwork and dismantling of masonry works around pipes. Above 600 mm to 900 mm dia | 300 | Meter | 222 | ₹66,600 |
| 6 | Dismantling of existing structures by manual means comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 meter and as per relevant clauses of section-200 in Removing all type of R.C.C. pipes and stacking within a lead upto 1000 meter including earthwork and dismantling of masonry works around pipes. Above 900 mm dia | 60 | Meter | 381 | ₹22,860 |
| 7 | Clearing and grubbing road land including
uprooting rank vegetation, grass, bushes, shrubs,
saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier, disposal of unserviceable
materials and stacking of serviceable material up to a
lead of 1000 meters including removal and disposal of
top organic soil not exceeding 150 mm in thickness, if
required, as per Section-200 of the specifications. By manual means: In area of thorny jungle Jungle clearing | 1.2 | Hectare | 1,40,176 | ₹1,68,211.2 |
| 8 | Dismantling of Cement Concrete Pavement
Dismantling of Cement Concrete pavement by
mechanical means including breaking to pieces not
exceeding 0.02 Cum in volume and stock piling at
designated locations and disposal of dismantled materials up to a lead up to 1000 meters, stacking serviceable and unserviceable materials separately as per Section-200 of the specifications | 523 | Cum | 643 | ₹3,36,289 |
| 9 | Dismantling of existing structures comprising of
masonry, Cement Concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
sorting the dismantled material, disposal of unserviceable material, stacking the serviceable material with all lifts and lead up to 1000 meters, as per Section 200 of the specifications. Tile Work / Brick Masonry By Manual Means In cement mortar | 117 | Cum | 383 | ₹44,811 |
| 10 | Dismantling of existing structures comprising of
masonry, Cement Concrete, wood work, steel work,
including T&P and scaffolding wherever necessary,
sorting the dismantled material, disposal of unserviceable material, stacking the serviceable material with all lifts and lead up to 1000 meters, as per Section 200 of the specifications.
By Mechanical Means Plain Cement Concrete Grade M-15 & M-20 | 150 | Cum | 1,217 | ₹1,82,550 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tenderdocumentmerged.pdf
Tender Documents • 2.01 MB
NIT.pdf
Other Document • 0.26 MB
BOQ_617937.xls
BOQ • 0.57 MB
corrimr2.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .