Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
7 Apr 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
Above/Below/Par
TECHNICAL
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of [V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Tenderer must have to submit valid Electrical Contractor license as per Indian Electricity Rules for the respective category of works and also submit Supervisory competency certificate(SCC) for the respective category of works issued by Government Electrical Licence Board on or before closing date of tender. Copy of which should be submitted along with the tender offer, otherwise tender will be summarily rejected.
The Similar nature of works for this instant tender shall be "Supply, installation, testing and commissioning of any LT/HT electrical work." The tenderer should have executed the similar nature of works in Central /State Government department or PSUs of Central /State Government."
54 conditions · 2 needing a document upload
Whether the cost of earnest money deposited
Whether cost of tender document deposited.
WHETHER VALID ELECTRICAL CONTRACTOR LICENCE AND SUPERVISOR LICENCE SUBMITTED
Migration to GST regime - Special Tender Conditions: The rates should clearly indicate the rate of applicable duties and taxes included in the prices quoted by them. Any variation in tax structure/ rate due to introduction of GST, shall be dealt with under Statutory Variation Clause. It should be ensure that bidders/tenderers are GST compliant and quoted tax structure/rates are as per GST Law.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractor should submit the GSTIN number and same should be mentioned in the bills along with a copy of GSTIN registration certificate while submitting the bills to accounts for audit and payment, As GST is scheduled to implemented wef 01.07.2017. Without GSTN, no bill will be accepted w.e.f. 01.07.2017
From 01.07.2017 GST has been implemented but the detail guideline is still not clear. Hence, new tax structure on materials and labour will be applicable to both Railway & contractor after getting proper notification
Payment of Earnest Money deposit (EMD) , in respect of e- tendering,should be accepted through net banking or online payment gateway only
Provision of track machine siding at DGU,KKET,AJRE,CPK,JGJN,KWM,BRLF,SCE,MBO stations in Lumding Division
EL-LM-24-25-50
EL-LM-24-25-50
Open
Works - General
180 Days
Hojai, Assam
₹0
₹2.1 L
7 Apr 2025
13 Mar 2025
70 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 44,52,871.68 | ||
| — | 540.00 | — | — | ||
| Supply and wiring of light point through good quality hard PVC casing with associated accessories for surface type wiring by 1.5 mm sq single core PVC insulated flexible copper cable and flush type 5/6 amp controlling switch to be provided on hard plastic moulded board. Casing shall be fixed on the wall / ceiling by MS screw (6x40 mm) at an interval not more than 300mm. | — | — | — | 92,183.4 | |
| — | 90.00 | — | — | ||
| Supply and wiring of ceiling fan point through good quality hard PVC casing with associated accessories for surface type wiring by 1.5 mm sq single core PVC insulated flexible copper cable with earth continuity by 16 SWG bare copper wire and flush type 5/6 amp controlling switch to be provided on hard plastic moulded board including 300W box type stepped electronic fan regulator. Ceiling fan connection shall be done through ceiling rose. Casing shall be fixed on the wall / ceiling by MS (6x40 mm) screw at an interval not more than 300mm | — | — | — | 23,418 | |
| — | 90.00 | — | — | ||
| Supply and wiring of exhaust fan point through good quality hard PVC casing with associated accessories for surface type wiring by 1.5 mm sq single core PVC insulated flexible copper wire with earth continuity by 16 SWG bare copper wire and flush type 5/6 amp controlling switch to be provided on hard plastic moulded board . Exhaust fan connection shall be done through ceiling rose. Casing shall be fixed on the wall / ceiling by MS (6x40 mm) screw at an interval not more than 300mm | — | — | — | 24,236.1 | |
| — | 180.00 | — | — | ||
| Supply and wiring of 5/6 amp, 5 pin plug point through good quality hard PVC casing with associated accessories for surface type wiring by 1.5 mm sq single core PVC insulated flexible copper cable with earth continuity by 16 SWG bare copper wire and flush type 5/6 amp controlling switch to be provided on hard plastic moulded board. Casing shall be fixed on the wall / ceiling by MS (6x40 mm) screw at an interval not more than 300mm. | — | — | — | 30,645 | |
| — | 90.00 | — | — | ||
| Supply and wiring of Geyser point by 15/16 amp, 6 pin plug point through good quality hard PVC casing with associated accessories for surface type wiring by 4 mm sq single core PVC insulated flexible copper cable with earth continuity by 16 SWG bare copper wire and flush type 15/16 amp controlling switch to be provided on hard plastic moulded board. Casing shall be fixed on the wall / ceiling by MS (6x40 mm) screw at an interval not more than 300mm . | — | — | — | 24,191.1 | |
| — | 90.00 | — | — | ||
| Supply & fixing of heavy duty exhaust fan 305/300mm sweep including all fixing accessories with wall cutting & frame louver shutter. All consumables regarding fixing arrangement will be supplied by the contractor as per the direction of engineer in charge at site. | — | — | — | 1,29,843 | |
| — | 360.00 | — | — | ||
| Supply, fitting, fixing, connection & commissioning of 18/20 watt LED indoor fitting complete set with LED tube and other accessories. The fitting shall be connected by 1.5 sq mm flexible copper wire through pvc pipes/casing as required at site. | — | — | — | 1,16,222.4 | |
| — | 180.00 | — | — | ||
| Supply installation and fitting of 7 watt, LED BULB | — | — | — | 28,620 | |
| — | 27.00 | — | — | ||
| Supply, installation, connection, testing and commissioning of 8 Way SPN MCB DB double door with i) 32 Amps DP MCB-2 Nos ii) 16A amps SP MCB -4 Nos including required accessories. | — | — | — | 1,12,941 | |
| — | 1800.00 | — | — | ||
| Supply and drawing of Sub main line by single-core 6 sq mm PVC insulated unsheathed FRLSH flexible copper cable with earth continuityby 16SWG bare copper wire through good quality hard PVCcasing/Conduit. (One RM consists of2 wires). Casing/conduit shall befixed on the wall/ ceiling by MS(6x40 mm) screw mat at aninterval not more than 300mm. | — | — | — | 1,19,862 | |
| — | 3600.00 | — | — | ||
| Supply and drawing of sub- main line by single core 4 sq mm PVC insulated flexible copper cable with earth continuity by 16 SWG bare copper wire through good quality hard PVC casing (One RM consists of 2 wires). Casing shall be fixed on the wall / ceiling by MS (6x40 mm) screw at an interval not more than 300mm. | — | — | — | 2,21,148 | |
| — | 9.00 | — | — | ||
| Supply, installation, testing and commissioning of water cooler 150 Ltr storage capacity ,, Cooler Cabinet sheet material should be Stainless Steel (Grade AISI 304), Conformity to Indian standard IS: 1475 latest | — | — | — | 1,79,640 | |
| — | 9.00 | — | — | ||
| Supply and fitting of 5 kVA, sine wave inverter, 72V system with trolley. | — | — | — | 3,00,672 | |
| — | 54.00 | — | — | ||
| Supply and testing of 150 AH battery with latest amendments having warranty of one years. All consumables regarding fixing arrangement will be supplied by the contractor as per the direction of engineer in charge at site. | — | — | — | 6,93,900 | |
| — | 36.00 | — | — | ||
| Supply and erection of earthing by 50 mm GI pipe, 3 mtr long 4.05mm thickness including construction of earth pit, RCC earth cover slab with filling/mixing of salt, charcoal etc of required quantity and earth continuity by 25x3mm GI strip with GI nuts bolts washer etc. including welding, earth resistance flag etc. as per Drg. No. NFR/CEE/CON/GS/10(earthing system)/04/2016 & as per Technical Specification No. NFR/ELECT/GS/10 (EARTHING SYSTEM). | — | — | — | 56,923.2 | |
| — | 9.00 | — | — | ||
| Supply, erection, installation, testing, commissioning of floor mounted LT panel consisting of i) 4 pole 250 Amp. MCCB -1 nos. ii) 4 pole 100 Amp.MCCB - 2 nos.,(iii) 4 pole 63 Amp.MCCB - 2 nos (iv) 4 pole 32 Amp.MCCB - 2 nos., with copper bus bar 250 Amp., incicator lamp ammeter, voltmeter etc. - 1 complete set.All MCCB's Ics = 100% of Icu. | — | — | — | 15,47,640 | |
| — | 72.00 | — | — | ||
| Supply,erection, installation & commissioning of 6 Mtr long Octagonal pole hot dip galvanized minimum 65 micron zinc coating with sectional dia 70 mm (top),130 mm (bottom).overall sectional thickness 3 mm complete with base plate of size (220x220x12)mm, 4 nos 600 mm long foundation bolt of suitable dia along with pipe cap type pole bracket 1000 mm long double arm made with suitable cap pipe 48.3 mm,3.25 mm thick arms.Junction plate made of 6 mm thick Bakelite sheet with 4/6 amps SP MCB b curve & 4 nos end terminals to be mounted inside the base compartment of Octagonal pole. The work will also include supply and erection of PCC/RCC works for foundation of size 55 cm x 55 cm and depth 1 Mtr below GL and height 20 cm above GL in proportion 1:2:4 with stone chips of maximum aggregate size 20 mm and less including cement,sand & provision of 75 mm dia pvc pipe for cable entry with excavation of earth for foundation of all depth and all places,nature and condition of soil including de-watering,shoring, shuttering, batchning,mixing,placing,leveling,carrying,etc and refilling the pit after completion of foundation work from excavated earth or borrowed pit by contractors own arrangement for octagonal pole. (considering SBC of soil is 10 Ton/sq.Mtr) | — | — | — | 4,63,137.12 | |
| — | 72.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .