| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹85.5 L+₹19,750 (0.23%)Admitted-Finance KUMBAKONAM | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | V GNANAPRAKASAM L2 | SRINIVAS CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation initial lead of 10m and lift of 2m in all classes of Soils such as muram, hard earth, earth mixed with boulders and sub soil etc., complete as per standard specification SS 20 A MORTH 24 & 25 | 121 | M3 | 10,817 ₹10,817 | 1,325 ₹1,325 Lowest |
| 2.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 48.5 | M3 | 1,18,752 ₹1,18,752 Lowest | 1,18,946 ₹1,18,946 |
| 3.00 | Providing and laying WMM (Wet Mix Mecadam) of 250 mm compacted thickness in two layors of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORT&H406 | 48.5 | M3 | 1,32,163 ₹1,32,163 | 1,31,048 ₹1,31,048 Lowest |
| 4.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 8,882 | M2 | 1,99,401 ₹1,99,401 Lowest | 2,17,254 ₹2,17,254 |
| 5.00 | Providing and applying of Prime Tack coat using emulsion bitumen at the rate of 7 kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. | 480.5 | M2 | 33,155 ₹33,155 | 32,746 ₹32,746 Lowest |
| 6.00 | Providing and applying of Tack coat using emulsion bitumen at the rate of 2.50kg per 10m2 over the Prime coated surface preparatory to another bituminous construction over it etc. complete. | 480.5 | M2 | 7,328 ₹7,328 | 7,063 ₹7,063 Lowest |
| 7.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm,0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm& below and with 53.20kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 505 of MORTH Rev-5. | 468.07 | M3 | 49,30,649 ₹49,30,649 | 49,05,467 ₹49,05,467 Lowest |
| 8.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30/VG40 and plastic waste added 4.02kgs bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 280.84 | M3 | 31,20,132 ₹31,20,132 | 31,18,798 ₹31,18,798 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
3 May 2023, 3:00 pmClosed
Executive Officer
Town Panchayat, Veppathur
Restoration Of BT Roads At Ammanpettai Thatchar Street(W to E),Ammanpettai Mela Street (Up To Church, E To W),Ammanpettai Mela Street Lane -1(W to E),Ammanpettai Mela Street (Near Church,N to S),Ammanpettai Mela Street (Kulanthaiadigal Salai - Arch
2023_DTP_303585_1
35/2023
Open Tender
Civil Works - Roads
Works
180 days
Veppathur Town Panchayat
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.0 L
Veppathur Town Panchayat
9 May 2023
19 Apr 2023
3 May 2023
19 Apr 2023
3 May 2023
19 Apr 2023
26 Apr 2023
Earth Work excavation initial lead of 10m and lift of 2m in all classes of Soils such as muram, hard earth, earth mixed with boulders and sub soil etc., complete as per standard specification SS 20 A MORTH 24 & 25
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and laying WMM (Wet Mix Mecadam) of 250 mm compacted thickness in two layors of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORT&H406
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and applying of Prime Tack coat using emulsion bitumen at the rate of 7 kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete.
Providing and applying of Tack coat using emulsion bitumen at the rate of 2.50kg per 10m2 over the Prime coated surface preparatory to another bituminous construction over it etc. complete.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm,0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm& below and with 53.20kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 505 of MORTH Rev-5.
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30/VG40 and plastic waste added 4.02kgs bitumen for premixing per 10sqm including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5.
V GNANAPRAKASAM
SRINIVAS CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BID.pdf
Tender Documents • 0.71 MB
BOQ_360030.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .