| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC | ₹28.9 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹46.7 LRejected-Finance VILL P O RANGIBASAN P S MAHISHADAL DIST PURBA MEDINIPUR PIN 721628 | MAHISHADAL | PURBA MEDINIPUR | WEST BENGAL | 721628 | ₹46.7 L | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹61.5 LRejected-Finance | ₹61.5 L | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹70.0 L
EMD Value
₹1.4 L
Closing Date
9 Feb 2026, 4:00 pmClosed
Executive Engineer and TA Western Circle-I
Office of the Superintending Engineer,Western Circle-I Jalasampad Bhawan 8th floor Bidhannagar, Kolkata 700091
De-siltation of Sheorapota Khal Northen Part for a length of 1.40KM from Rajchandrapur Railway Culvert to Baigachi Khal , near Belanagar Rail Gate and Suti Khal-I for a length of 0.80 KM from Belanagar to Bally Khal , Block Bally Jagacha , P.S Ni
2026_IWD_991100_1
WBIW/TA/WC-I/NIT-02(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
180 days
HOWRAH
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.4 L
Yes
25 Aug 2026
24 Jan 2026
10 Feb 2026
24 Jan 2026
9 Feb 2026
24 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in re-excavation / silt clearance of drainage channels in all kinds of soil including sludge and slush but excluding slush mixed with industrial wastes, sewage, municipal garbage, carcasses, etc and depositing the same as per profile in proper place as directed by the Engineer-in-charge without causing hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition including removal of polypacks, brickbats, stone ballasts & boulders, remnants of bullah & bamboo pins and all kinds of water hyacinth, solid / semi solid compact mass formed due to water hyacinth and burning them to ashes or removing outside Govt land where necessary and removal of thick & thorny jungles upto 30 cm girth including shoring and shuttering, if required, and including initial removal of sludge and slush etc by pan or bucket if required, and making arrangement for bailing out of any seepage water and removal of sand or soil blown from underneath, all complete.
(Measurement : Pre-work and Post-work level section. Pre-work section to be taken after removal of water hyacinth and all other floating materials etc.)
(b) By mechanical means using hydraulic excavators within an initial lead of 30 M and an initial lift of 3.0 M | 14,034 | Cum | 144.21 | ₹20,23,843.14 |
| 2 | Disposal/carriage of excavated earth/materials outside Government land by truck or by any other conveyance over kuncha/pucca road including making access for plying the truck or any other conveyance beyond 300 m and upto a distance of 5.00 km from the excavated point including cost of stacking, loading, unloading, transportating, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete.
Measurement : By stacks at loading point after deducting voids, as per rule.( This item can only be used after obtaining permission from the concerned Superintending Engineer). | 7,017 | Cum | 139.44 | ₹9,78,450.48 |
| 3 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
15 cm av. Diameter
Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end | 3,930 | Metre | 258.62 | ₹10,16,376.6 |
| 4 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles
15 cm av. Diameter
Note:
1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. | 2,100 | Metre | 125.14 | ₹2,62,794 |
| 5 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm. and less than 15 cm
Jhaw / Eucalyptus | 400 | Metre | 123.95 | ₹49,580 |
| 6 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge
a) One Coat | 1,851 | Sqm | 34.56 | ₹63,970.56 |
| 7 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete.
Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate | 15,200 | Each | 26.22 | ₹3,98,544 |
| 8 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). | 15,200 | Each | 14.3 | ₹2,17,360 |
| 9 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of
A) Beyond 4.00 km and upto 5.00 km
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. | 728.18 | Cum | 371 | ₹2,70,154.78 |
| 10 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 500 | Each | 139.44 | ₹69,720 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_2423126.xls
BOQ • 0.34 MB
2911.pdf
Tender Documents • 0.30 MB
sl1.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].