Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | -9.99% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 CrAdmitted-Finance | -0.10% | ₹2.2 Cr | L2 | Admitted-Finance |
| 3 | L2₹2.2 CrAdmitted-Finance | -0.10% | ₹2.2 Cr | L2 | Admitted-Finance |
| 4 | L2₹2.2 CrAdmitted-Finance | -0.10% | ₹2.2 Cr | L2 | Admitted-Finance |
| 5 | L2₹2.2 CrAdmitted-Finance | -0.10% | ₹2.2 Cr | L2 | Admitted-Finance |
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
22 May 2026, 5:00 pmClosed
CCE Phulbani (R and B) Circle Phulbani
Office of the CCE Phulbani RandB Circle Phulbani District Kandhamal PIN 762001
Construction of 4 Nos D Type (S plus 2) Residential Building Quarter at CT and GST Office Permises in the District of Boudh
2026_EICCL_128994_1
CCE R AND B PLB 02 OF 2026-27
Open Tender
Civil Works - Buildings
180 days
Boudh
Please Refer Tender Documents
2 documents required · 2 mandatory
₹10,000
₹2.2 L
Yes
18 Jun 2026
8 May 2026
25 May 2026
8 May 2026
22 May 2026
8 May 2026
8 May 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | CIVIL WORK:
Earth work in excavation in foundation in hard or gravelly soil in trenches, column foundation, pit etc in hard soil including dressing of sides and levelling the bed upto the required depth and depositing the excavated materials away from the work site with initial lead of 50mt and all lifts including shoring, shuttering and dewatering (if required) with cost of labour , labour cess, hire and running charges of all materials complete Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per direction of Engineer in charge. Stilt Floor | 941.35 | cum | 270.89 | ₹2,55,002.3 | NI-2902-9221-1 |
| 2 | Supplying & Filling foundation trenches , plinth & ditches with clean coarse river sand well watered and rammed in layers not exceeding 23 c.m. in depth with all lead and lift including cost, conveyance, loading, unloading, stacking, royalties and all cost & conveyance of water, cost of all Labour,labour ess,T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge. Stilt Floor | 414.61 | cum | 538.56 | ₹2,23,292.36 | NI-2902-9221-2 |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size hard crusher broken granite stone aggregate and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including all cost, conveyance, royalties and cost of all labours,labour cess, T&P etc complete as per specification & direction of the Engineer-in-charge. Stilt Floor | 78.37 | cum | 6,019.24 | ₹4,71,727.84 | NI-2902-9221-3 |
| 4 | Providing and laying plain cement concrete of proportion (1:2:4) in foundation and floors using 4 cm. size hard crusher broken granite stone aggregate and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including all cost, conveyance, royalties and cost of all labours,labour cess, T&P etc complete as per specification & direction of the Engineer-in-charge. Terrace Floor parapet coping | 1.05 | cum | 20,602.13 | ₹21,632.24 | NI-2902-9221-4 |
| 5 | RCC M-20 using 12 mm. to 20 mm. (0.5 inch to ¾ inch) size (20 mm. not to exceed 25%) hard crusher broken granite stone aggregate of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with all cost, conveyance, royalties, taxes of all materials with all labour,labour cess and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge. Column Footing Stilt Floor | 152.97 | cum | 6,818.1 | ₹10,42,964.76 | NI-2902-9221-5 |
| 6 | Plinth Beam Stilt Floor | 27.59 | cum | 7,684.36 | ₹2,12,011.49 | NI-2902-9221-6 |
| 7 | Column Silt Floor | 16.83 | cum | 18,339.61 | ₹3,08,655.64 | NI-2902-9221-7 |
| 8 | First Floor | 16.13 | cum | 20,837.78 | ₹3,36,113.39 | NI-2902-9221-8 |
| 9 | Second Floor | 16.13 | cum | 23,811.66 | ₹3,84,082.08 | NI-2902-9221-9 |
| 10 | Terrace Floor | 7.85 | cum | 27,356.4 | ₹2,14,747.74 | NI-2902-9221-10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.52 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_590248.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid