Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | A.P.R CONSRTUCTION L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 516 | m3 | 135 ₹69,659.32 Lowest |
| 2.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 79 | m3 | 5,590 ₹4,41,582.05 Lowest |
| 3.00Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | ||||
| 3.01 | Centering without strutting-for drain | 1,083 | m2 | 489 ₹5,29,587 Lowest |
| 3.02 | Centering for soffits of RC slab including strutting | 36 | m2 | 1,290 ₹46,440 Lowest |
| 4.00 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification | 176 | m3 | 6,319 ₹11,12,128.2 Lowest |
| 5.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications | 7 | Qtl | 9,321 ₹65,241.78 Lowest |
| 6.00 | Providing and laying in position of ready mix concrete 1:1.5:3 mix using Portland cement
with water cement ratio not exceeding 0.45 including the use of plastidizer of approved
make and dosage required grade at all location and levels using 20mm ISS gauge HBBG
metal and down graded aggregates in all type of works including hire charges for pump and
pumping charges to required location. machine, vibrating, tapping, curing as specified
charges conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of reinforcement, fabrication charges centering and shuttering ) mix by
departmental officers etc complete as per IS 4926 of 1976/1990 | 10 | m2 | 7,593 ₹75,923.93 Lowest |
| 7.00 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 252 | m2 | 292 ₹73,584 Lowest |
| 8.00 | Conveyance of excavated earth from site 0 to 15 km lead including loading and unloading elements completed | 310 | m3 | 68 ₹21,079.8 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
21 May 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Storm water Drain and Culvert at Swarnapuri layout in Ward No 87,south Zone Coimbatore Corporation.
2025_MAWS_558620_14
e23/2025- Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹30,000
9 Aug 2025
16 May 2025
22 May 2025
16 May 2025
21 May 2025
16 May 2025
Amount
Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification
Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete.
Centering without strutting-for drain
Centering for soffits of RC slab including strutting
Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification
Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications
Providing and laying in position of ready mix concrete 1:1.5:3 mix using Portland cement with water cement ratio not exceeding 0.45 including the use of plastidizer of approved make and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and down graded aggregates in all type of works including hire charges for pump and pumping charges to required location. machine, vibrating, tapping, curing as specified charges conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of reinforcement, fabrication charges centering and shuttering ) mix by departmental officers etc complete as per IS 4926 of 1976/1990
Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete
Conveyance of excavated earth from site 0 to 15 km lead including loading and unloading elements completed
Supply and Fixing of 600 mm Dia. SFRC Manhole Cover with Frame as per Standard Quality as per the Direction of the Departmental officers Etc., Complete.
a)Circular Manhole-600mm dia
Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .