Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance AROOR P O ALAPPUZHA KERALA 688534 | ALAPPUZHA | ALAPPUZHA | KERALA | 688534 | Admitted-Finance |
Tender Value
₹65.0 L
EMD Value
₹65,009
Closing Date
23 Nov 2022, 2:00 pmClosed
R S Sabat, DGM(Purchase)
IREL(India)Limited, OSCOM
AMC for Instrumentation Maintenance at Mining and MSP.
2022_IREL_134077_1
03-19086
Open Tender
Miscellaneous Works
Works
365 days
Matikhalo
Please refer tender document
2 documents required · 2 mandatory
₹0
₹65,009
Yes
26 Nov 2022
2 Nov 2022
24 Nov 2022
2 Nov 2022
23 Nov 2022
2 Nov 2022
2 Nov 2022 - 23 Nov 2022
Copper Cable up to 2.5 Sq. mm X 4 Core (Flexible)
Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Flexible)
Copper Cable up to 2.5 Sq. mm X 4 Core (Armoured)
Copper Cable 2.5 sq.mm X above 4 core and up to 10 Core or 5 Pair (Armoured)
Copper Cable up to 1.5 Sq. mm X 11 core-40 Core: Armoured
Cable: Communication / Compensating
Cable Glanding: Poly Carbonate/Metal/Equivalent
Earthing Cable: Wire/ strip
Installation/Dismantling/Replacement of Magnetic Flow meter up to 200 mm NB
Installation/ Dismantling/ Dismantling of Commissioning of Magnetic Flow meter: above 200mm NB - 400 mm NB
Replacement of Earthing Plate of Magnetic Flow Meter
Replacement of Gasket for Magnetic Flow Meter
Functional Testing & Troubleshooting of Magnetic Flow meter
Preventive Maintenance of Magnetic Flow meter with transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check the Supply/signal 4-20 mA...etc as per Checklist. PM Checklist report shall be submitted on each occasion.
Installation / Dismantling / Replacement of Density Gauge and Transmitter
Installation / Dismantling / Replacement of Computing Unit / Detector and its accessories
Internal calibration & Report generation of Density Meter
Replacement of Rubber Gasket/ SS Saddle of Density Meter
Functional Testing & Troubleshooting of Density meter
Preventive Maintenance of Density Meter: Blowering and cleaning, dedusting/Covering and terminal tightness …etc as per Checklist. PM Checklist report shall be submitted on each occasion.
Installation / Dismantling / Replacement of RTD/ Thermocouple/ Bi-metallic sensor Element
Installation / Dismantling / Replacement of Temperature Indicator cum Controller
Internal Calibration & Report generation of Temperature Sensor / Temperature Controller
Functional Testing & Troubleshooting of Temperature Measuring System- RTD / Thermocouple / Indicator / controller
Preventive Maintenance of Temperature Controller & Sensor Element: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per checklist. PM Checklist report shall be submitted on each occasion.
Installation / Dismantling of Pressure Transmitter
Installation / Dismantling of Raiser tube replacement
Installation / Dismantling of Isolation Valve
Internal calibration & report generation of Pressure Transmitter
Functional Testing & Troubleshooting of Pressure Transmitter
Preventive Maintenance of Pressure Transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of Pinch Control valve
Replacement of Shaft & Brush including Drilling &grinding of shaft
Replacement / Adjustment of Limit switch of Pinch Control Valve
Replacement of Capacitor of Pinch Control Valve
Replacement of Rubber Sleeve of Pinch Control Valve
Replacement & Realignment of gear system of Pinch Control Valve
Replacement of Motor of Pinch Control Valve
Valve Stroke Adjustment of Pinch Control Valve
Overhauling of Pinch Control Valve
Condition Monitoring of Pinch Control Valve
Functional Testing & Troubleshooting of Pinch Type Control Valve
Preventive Maintenance of Pinch Control Valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness…etc as pr PM Checklist. PM Checklist Report shall be submitted on each occasion.
Installation/ Dismantling / Replacement of Butterfly Valve
Adjustment &realignment of the gear system of Butterfly Valve
Repairing &realignment of variable register port of Butterfly Valve
Adjustment of Valve Stroke of Butterfly Valve
Overhauling of Butterfly Valve
Functional Testing & Troubleshooting of Butterfly Valve
Preventive Maintenance of Butterfly valve: Greasing, Oiling, Blowering and cleaning, dedusting/Covering and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of water flow meter
Repair & Overhauling of Water flow meter
Internal Calibration of Water meter and Report Generation
Functional Testing & Troubleshooting of water flow meter
Preventive Maintenance of Water Flow Meter: cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of Air flow meter
Repair & Overhauling of Air flow meter
Internal Calibration and Report Generation of Air flow meter
Functional Testing & Troubleshooting of Air flow meter
Preventive Maintenance of Air Flow Meter: cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of Oil flow meter
Repair & Overhauling of Oil flow meter
Internal Calibration of Oil flow meter
Functional Testing & Troubleshooting of Oil flow meter
Preventive Maintenance of Oil Flow Meter: cleaning, dedusting/Covering, Installation tightness and terminal tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of pH meter cum controller
Installation / Dismantling / Replacement of pH Electrode
Calibration of pH meter / Conductivity Meter with Buffer Solution & Report Generation
Functional Testing and Troubleshooting of pH meter/Conductivity meter
Preventive Maintenance of pH Meter / Conductivity Meter: Electrode cleaning, Meter- Blowering and cleaning, dedusting/Covering and terminal tightness. Maintenance Schedule to be carried out as per direction of EIC. PM Checklist of Analytical Instruments shall be submitted on each occasion.
Repairing of Panel meter/ PID controller/ transmitter/ Totalizer
Replacement of Electronic Component-register/capacitor/ IC…etc
Replacement of Low-capacity Transformer/motor
Installation /Dismantling /Replacement of Electronic Button or Switch
Replacement of Battery / Fuse / Buzzer
Functional Testing and Troubleshooting of Electronic System
Installation / Dismantling / Replacement of Digital Panel meter / Timer / Counter
Programming of Digital Panel Meter/Timer/ Counter as per process requirement
Functional Testing and Troubleshooting of Digital Panel meter /Timer /Counter
Preventive Maintenance of Digital Panel Meter or Timer: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist. PM Checklist of shall be submitted on each occasion.
Installation/Dismantling / Replacement of Digital Totalizer cum Indicator
Programming of Digital Totalizer cum Indicator as per function Requirement
Functional Testing and Troubleshooting of Digital Totalizer
Preventive Maintenance of Digital Totalizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of Digital Recorder
Programming of Digital Recorder as per process requirement
Functional Testing and Troubleshooting of Digital Recorder
Preventive Maintenance of Digital Recorder: Blowering and cleaning, dedusting/Covering and terminal tightness. Etc as per Pm checklist. PM Checklist r shall be submitted on each occasion.
Installation / Dismantling / Replacement of PID Controller
Programming & Parameter Adjustment of PID Controller as per process requirement
Functional Testing and Troubleshooting of PID Controller
Preventive Maintenance of PID Controllers: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist.PM Checklist shall be submitted on each occasion.
Replacement Solenoid coil, Relay, Joystick, Timer, Variable resistive port, Push Button of Hydraulic Control System
Replacement of Power supply module of Hydraulic Control System
Functional Testing & Troubleshooting of DWUP Instrument system
Preventive Maintenance of DWUP Hydraulic System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.
Installation / Dismantling /Replacement of Dosing Pump
Installation / Dismantling of Valve Actuator
Replacement, Repairing & Realignment of gear system / Limit Switch
Replacement of Potentio meter port
Replacement of Float Ball
Installation / Dismantling of Servo controller
Programming and Fine tuning of Servo controller
Overhauling of Electric Actuator System
Condition Monitoring of Flotation cell
Functional Testing and troubleshooting Sillimanite Floatation Cell
Preventive Maintenance of Sillimanite Flotation Cell: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.
Installation/ Dismantling / Replacement of Globe Discharge Valve
Condition Monitoring of Column Flotation System
Functional Testing and troubleshooting Column Flotation System
Preventive Maintenance of Column Flotation System: Blowering and cleaning, dedusting/Covering and terminal tightness… etc as per PM Checklist. PM Checklist of shall be submitted on each occasion.
Installation / Dismantling / Replacement of FFD/Park Plug
Installation / Dismantling / Replacement of Modulation Motors of Oil/Air Control system/ Inlet PRV/ Outlet PRV
Replacement/ Dismantling of Burner Gun/ Electrode/ Nozzle
Replacement/Dismantling of Flame Switch / Sequence Controller/ Modulating Controller
Replacement / Dismantling of solenoid Valve/ Solenoid Coil
Replacement / Dismantling of Ignition Transformer
Cleaning of air impulse line from field to Transmitter
Repair of Oil Heater control System
Repair of Air Purging System for Bag Filter
Repair/ Replacement/ Dismantling of Gas Train
Repair/ Replacement/ Dismantling of Oil Train
Functional Testing and Troubleshooting of FBD
Condition Monitoring of FBD system of MUS / GEM / Zircon
Preventive Maintenance of FBD System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Replacement/Repair / Dismantling of Oil Control valve system
Replacement/ Repair / Dismantling of Combustion Air Control valve
Replacement/Repair / Dismantling of ID FAN Control Valve Actuator
Repair of Oil Heater control System
Replacement/ Repair / Dismantling of Ratio control System
Checking of Field Instrument signal to DAS Panel for Control room operation and monitoring System
Condition Monitoring of Dryer System
Functional Testing and Troubleshooting of Driyer
Preventive Maintenance of DRIYER system: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation/Dismantling / Replacement of Auto sampler complete system
Replacement of Solenoid coil, Timer, Limit switch, Motor, Proximity sensor
Replacement of Pneumatic Cylinder, 3/2 Solenoid Valve
Replacement of Valve body, rubber sleeve, shaft, Gear system
Realignment of Gear System
Condition Monitoring of Auto Sampling System
Function Testing and troubleshooting of Auto sampling system
Preventive Maintenance of Auto Sampling System: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per Pm Checklist. PM Checklist shall be submitted on each occasion.
Installation /Dismantling / Replacement PLC CPU
Replacement/ Dismantling of SMPS, DI / DO/ AI / AO/ Card Rack
Replacement / Dismantling of Relay Unit / Relay Card / Card Battery
Replacement / Dismantling HMI Display
Re-starting of SCADA application S/W/ PLC System
Conditioning Monitoring of PLC and SCADA
Replacement / Dismantling of PLC Based LED Monitor
Checking of Earthing and Supply Voltage PLC Panel
Functional Testing & Troubleshooting PLC System
Preventive Maintenance of PLC & SCADA SYSTEM: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion.
Installation/Dismantling/Replacement of Computer System / Server
Installation/Dismantling/Replacement of Printer System
Cleaning of Computer Unit / Printer Unit
Formating and Drivers Installation of computer system
Replacement/ Dismantling of Mother Board / Fan / SMPS / RAM / Hard Disk / Mouse / Key Board / Monitor
Installation / Dismantling / Replacement of Network Rack 6U / 9U / 19 U
Installation / Dismantling / Replacement of Network Switch
Crimping of Network cable like RJ45 / VGA / DVI / HDMI ..etc
Functional Testing and Troubleshooting of Server /Computer/ Printer/ Network System
Preventive Maintenance of Computer and Network System: Blowering and cleaning, dedusting and terminal tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Loop checking AI /AO / DI / DO signal inside Panel System
Loop checking Copper Signal for Field Instruments to Panel
Loop checking Cooper Power Cable
Loop Checking of Communication cable
Installation / Dismantling/ Replacement of UPS System / stabilizer
Installation / Dismantling / Replacement of Battery
Conditioning Monitoring of system includes Recording of Battery Voltage, UPS input & output Voltage and Backup performance
Functional Testing and Troubleshooting of UPS System /stabilizer
Preventive Maintenance of UPS system / stabilizer: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM checklist PM Checklist shall be submitted on each occasion.
Installation/Dismantling / Replacement of Junction box - Polycarbonate / PVC / SS/ MS / FRP
Fixing/ Removal of DIN Rail with screw or nut bolts
Fixing / Removal of Terminal Block
Fixing / Removal of Terminal End Plate
Fixing / Removal of Terminal Block stopper
Fixing / Removal of Electronic Relays
Fixing / Removal of required Casing Capping /Duct
New Wiring for Junction Box
Installation / Dismantling /Replacement of Pressure/ Vaccum / Bi-metallic gauges
Repair of Pressure / Vaccum / Bi-metallic gauges
Functional Testing and Troubleshooting of Pressure / Vaccum / Bi-metallic gauges
Preventive Maintenance of Gauges: cleaning and dedusting/ Covering …etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation/Dismantling / Replacement of level transmitter
Programming of Level Transmitter as per process requirement
Internal Calibration and Report Generation of Level Transmitter
Functional Testing & Troubleshooting of Level Transmitter/Switch
Preventive Maintenance of level transmitter: Blowering and cleaning, dedusting/Covering and terminal tightness, check 4-20mA supply ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of Differential Pressure Switch
Calibration and Report Generation for of Differential Pressure Switch
Functional Testing and Troubleshooting of DP Switch
Preventive Maintenance of Differential Pressure Switch: Blowering and cleaning, dedusting/Covering and terminal tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.
Weighbridge in Plant & Mining Area - AMC Support
Weighing Scales/Machine - AMC Support
Belt Weigher - AMC Support
Mass Flow meter - AMC Support
MUS FBD - AMC Support
GEM FBD - AMC Support
Electronic Display Board - AMC Support
Flow Meter Calibration - AMC Support
Master Instruments Calibration - AMC Support
UPS System - AMC Support
Auto Sampler System - AMC Support
Bagging Machine - AMC Support
Fire Alarm System - AMC Support
PLC & SCADA System - AMC Support
Installation /Dismantling / Replacement of Weighing Scale
Replacement of Load Cell / Indicator / Communication Cord
Internal Calibration and Report Generation of Weighing scale with minimum 50% of Capacity
Conditioning Monitoring of Weighing Scale with Test Weight of Minimum 50 Kg
Functional Testing of Weighing Scales
Preventive Maintenance of Weighing Scale: Dusting, surface cleanning, Load cell cable tightness …etc as per Pm checklist. PM Checklist shall be submitted on each occasion.
Checking of Earth plate, Load cell, Platform Nut & Bolt and its tightness. Corrective action for optimal Performance
Greasing of Earth plate, Load cell, Platform Nut & Bolt
Replacement of Load Cell
Replacement of RFID / Camera / IR Sensor / NVR / Light Signal / PoE Switch
Calibration cross Checking with Vehicle in all Weighbridge
Conditioning Monitoring of Weighbridge
Functional Testing and Troubleshooting
Preventive Maintenance Weigh bridge- Dusting, surface cleaning of Digitiser, Computer, Printer, Terminal Tightness…etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Installation / Dismantling / Replacement of Belt Weigher
Replacement / Dismantling load cell / Tachometer / Junction Box
Replacement Belt Weigher Panel
Repair of Belt Weigher Panel
Internal calibration & Report Generation - Drop test
Internal Calibration & Report Generation- Complete with Test Chain
Conditioning Monitoring of Belt Weigher
Functional Testing and Troubleshooting of Belt Weigher
Preventive Maintenance of Belt Weigher: Desting, surface cleaning, Load cell cable tightness ..etc as per PM checklist. PM Checklist shall be submitted on each occasion.
Replacement / Dismantling of Load Cell/ Pneumatic Cylinder / Solenoid Valve
Replacement / Dismantling of Clamp Belt Rubber (width- 2'')/ Foot Switch
Replacement / Dismantling of PU Tubes
Repair of Pneumatic Cylinder / Solenoid Valve
Conditioning Monitoring of Auto bagging System
Functional Testing and Troubleshooting of Auto Bagging System
Preventive Maintenance of Bagging System: Desting, surface cleaning, Load cell cable tightness…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.
Replacement of Needle/ Any Parts
Replacement/ realignment of Looper
Replacement of V-Belt
Overhauling of Stitching Machine
Condition Monitoring of Stitching Machine
Functional Testing and Trouble Shooting of Stitching Machine
Preventive Maintenance of stitching: Blowering and cleaning, oiling, dedusting/Covering and terminal tightness. Etc as per PM Checklist .PM Checklist Shall be submitted on each occasion.
Conditional Monitoring of Fire Alarm System - MSP / TS / STORE & WORKSHOP / ADMINISTRATIVE BUILDING / MRSS & LCSS
Functional Testing of Fire Alarm Control Panel /Smoke/ Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module
Replacement of Smoke/Heat/ multicriteria Detector/Beam detector/Manual Pull Station/Strobe cum Hooter/ Relay Module
Replacement of Fire Alarm Panel
Installation/Dismantling / Replacement of Camera
Replacement of PoE Switch/ Power Supply Module / Media Converter
Replacement of Communication/Power Cord
Replacement of CCTV Surveillance Monitor
Replacement of NVR System
Parameter Fixing of NVR system as per requirement
Condition Monitoring of CCTV base Surveillance System- MSP / GEM / MUS / MINING POND / SMP / DWUP / SECURITY / ADMIN BUILDING / GUEST HOUSE
Function Testing and Troubleshooting of CCTV based Surveillance System
Preventive Maintenance of all camera: Blowering and cleaning, dedusting/Covering and terminal tightness…as per PM Checklist. PM Checklist shall be submitted on each occasion.
Installation/Dismantling / Replacement of Air Regulator /Air Filter / Oil Lubricator
Repair of Air Regulator / Air Filter / Oil Lubricator
Loading and unloading Pressure Setting
Oil Refilling for Compressor
Conditioning Monitoring for Compressor System
Replacement/ Dismantling of condensate drain valve system
Repair of condensate drain valve system
Function Testing and Troubleshooting of Compressor
Preventive Maintenance of compressed air conditioning system: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist of Air condition of standalone system shall be submitted on each occasion.
Installation/Dismantling / Replacement of Air Dryer
Replacement/ Dismantling solenoid valve / Solenoid coil
Replacement / repair of Air Drier Control Unit
Function Testing and Troubleshooting of Air Drier System
Preventive Maintenance of Air Drier: Blowering and cleaning, dedusting and covering, part checking…etc as per PM Checklist. PM Checklist shall be submitted on each occasion.
Brush Painting -Primer
Brush Painting -Paint
Surface Preparation- Chipping/sand Paper/ Buffing
Replacement/Fixing / Removal of MCB / SPD / Contactor/ Timer / Relay / Bush Button / Emergency Button
Replacement/ Fixing/ Removal of 5/6 Ams. 3/5 pin Socket(or) 3/5 pin Plug Top/Switch piano type
Replacement/ Fixing / Removal of 15/16 Ams. 3/5 pin Socket (or) 3/5 pin Plug Top/Switch piano type
Replacement / Fixing / removal of Light Fittings / Light / Fan
Fixing / removal of Electrical PVC/ Wooden/ Metal Junction Box - 4'' X 4''/4'' X 6''/4''X10''/6"x12"
Replacement/ fixing / removal of Transformer / Variac / SMPS
Functional testing of Electrical system
Laying & dressing of PVC Conduit pipe
Laying & dressing PVC Casing and Capping on the wall
Laying & dressing Flexible Conduit
Removal of PVC conduit / Casing & Capping / Flexible Conduit
Connection Fittings- Pipe/ casing capping
Laying of GI / MS / SS Pipe
Laying of HDPE Pipe
Fixing of HDPE Fitting
Dismantling and Disposal of old or unused Pipe / casing capping
Dismantling and Disposal of old or HDPE Pipe
Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size up to 1/2 ''
Connection of Fittings like- Union/Coupling/Nipple/Elbow/Bend/Tee Equal/Reducer size- above 1/2'' to 1 ''
Junction Box Fixing Bracket up to 2 sq. ft.: Mild steel
Junction Box Fixing Bracket above 2 sq. ft- 4 sq. ft.: Mild Steel
MS Fabrication as per Drawing provided EIC
MS Flange fabrication as per requirement with pipe up to 50 mm
MS Flange Fabrication above 50mm - 100 mm
SS/MS Cover for Field Instruments as per Drawing- max. sheet thickness 3 mm
Laying of MS / GI Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm
Laying of MS / GI Cable Tray Ladder Type- up to 200 X40 X 6 mm
Laying of MS/ Gi cable Tray Fittings
Fixing of MS / GI Tray Support
Laying of FRP Cable Tray Ladder Type - 300 mm X 50 mm X 6 mm
Laying of FRP Cable Tray Ladder Type- up to 200 X40 X 6 mm
Laying of FRP cable Tray Fittings
Fixing of FRP Tray Support of MS material
Removing of old cable from wall/cable tray/Cassing /open area and disposal to designated area as per direction EIC after weighment within area 100 mtr. Inside the plant premises.
Collection of old metal scrap from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises.
Collection of old electronic waste from Plant area and disposal to designated area as per direction EIC after weighment within area 100 mtr. inside the plant premises.
Preparation soft soil trench of size 30 cm X 30 cm X 30 Cm and refilling after cabling/piping. Etc work
Preparation of Hard soil (RCC) by cutting of size 20 cm X 20 cm X 20 cm and reconditioning to originality by filling with plain concrete after laying of pipe or cable
Replacement/ Dismantling /Installation of Control Panel of Booster Pump
Repair of Booster Pump control system
Functional testing and Troubleshooting of Booster Pump
Installation/ Dismantling / replacement of Replacement of Spillage Alarm Panel System
Replacement of Sensor switch
Conditional Monitoring of Spillage Control System
Functional testing and Troubleshooting of Spillage Alarm System
Preventive Maintenance of Spillage Control System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist shall be submitted on each occasion.
The Work Which are not included in the above List
Replacement / Dismantling / installation of Piezometer
Internal Calibration
Functional Testing & Troubleshooting
Condition Monitoring of Piezometer System
Preventive Maintenance of Piezometer System: Blowering and cleaning, dedusting and Pipeline tightening…etc as per PM Checklist PM Checklist shall be submitted on each occasion.
Installation/ Replacement of IR Occupancy Sensor
Installation /Replacement of Indicator light
Repair/ Installation/ Dismantling of Parking LED Monitor
Functional Testing & Troubleshooting of Smart Parking Facility
Condition Monitoring of Smart Parking Facility
Preventive Maintenance of Smart Parking Facility: Blowering and cleaning, dedusting…etc as per PM Checklist shall be submitted on each occasion.
Installation/ Replacement of Boom
Installation/ Replacement of Motor for Boom barrier
Installation/ Replacement / Repair of Mother Board card/ IR Sensor
Installation/ Replacement of RFID Scanner / Controller
Functional Testing & Troubleshooting of Boom Barrier System
Condition Monitoring of Boom Barrier System
Preventive Maintenance of Boom barrier System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.
Installation/ Replacement / Repair of RF-NIC card
Installation/ Replacement / Repair of DCU-NIC card
Functional Testing & Troubleshooting of Smart Metering System
Condition Monitoring of Smart Metering System
Preventive Maintenance of Smart Metering System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.
Installation/ Replacement / Repair of Signal Light
Installation/ Replacement / Repair of Traffic Camera
Installation/ Replacement / Repair of Traffic Controller
Functional Testing & Troubleshooting of Intelligent Traffic Management System
Condition Monitoring of Intelligent Traffic Management System
Preventive Maintenance of Intelligent Traffic Management System: Blowering and cleaning, dedusting …etc as per PM Checklist shall be submitted on each occasion.
Engagement of one 5 Seated Bolero Camper or TATA Xenon with driver for 8 Hrs Operation from 9:00 AM to 5 PM. The Vehicle shall be of 2019 Model or subsequent.
Kilometer run by the Vehicle :- Fuel Charge shall be reimbursed @ 1Litre for every 12 Kilometers run by the Vehicle
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .