Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹97.4 LAccepted-AOC KOVILPATTI | KOVILPATTI | TAMIL NADU | 1 | Accepted-AOC Accepted | |
| 2 | 2₹97.7 L+₹29,797.05 (0.31%)Rejected-Finance | 2 | Rejected-Finance Rejected |
Tender Value
₹99.7 L
EMD Value
₹99,710
Closing Date
28 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (BP)
Block Development office, Sattur
Reconstruction of Houses and other infrastructure
2022_RDTN_228962_1
A2/1607/2021
Open Tender
Civil Works - Buildings
Item Rate
SATTUR
Reconstruction of Houses and other infrastructure
3 documents required · 3 mandatory
₹0
₹99,710
Yes
10 May 2022
13 Apr 2022
28 Apr 2022
13 Apr 2022
28 Apr 2022
13 Apr 2022
13 Apr 2022 - 28 Apr 2022
270 days
Amount
Reconstruction for 24 Nos. of Houses
Dismantling the existing dameged Pressed tiles
Dismantling the existing dameged Brick work / Stone masonry
Dismantling the existing dameged RCC
Dismantling the existing dameged Plain cement Concrete
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Supply and errection of steel centering for RCC works using MS sheets and angles and strutting upto 3.00 in height including cost and conveyance of all materials to site and all labour charges etc complete.
Supply and fabrication of steel for R.C.C work using R.T.S & M.S rod including cost and conveyance of all materials to site all labour charges etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Granolithic floor finishing with CC1:2:4 mix using 10mm to 12mm IRC chips 25mm thick including cost and conveyance and all labour charges etc complete.
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
White washing in two coats with best shell lime.including cost and conveyance of all materials to site and labour charges etc. complete
Exterior emulsion painting two coats with best shell lime using colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
Painting two coats with ready mixed paint for new iron work including cost of all materials to site and all labour charges etc complete.
Supply and fixing of Steel Door size of 1.00 x 2.10m
Supply and fixing of Steel Window size of 0.90 x 1.20m
Light Point (SD 22)
Fan Point (SD 22)
Supply and fixing of Tube light Fittings (SD88)
Plug Point 3x3 (SD 139)
Run off wire for service connection (SD 64)
Renovation of 30000 Ltr OHT
Dismantling the damaged RCC
RCC 1:1.5:3 mix using 20 mm HBGS exculuding cost of reinforcement, centerin, shuttering, strutting, but including cost of mixing concrete, placing, vibrating with mechanical,vibrator finishing curing etc, complete.
Supplying and erecting steel centering for sides soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable size of BG 10 stiffiened with welded MS angles of size 25mm x 25mm x 3mm of boarding laid over silver oak uoints of size 10cm x 6.5 cm spaced at 90 cm centre to centre and supported by causarina props pf 10 cm to 13 cm dia spaced at 75cm centre to centre complying with standared specification etc.,
Painting two coats with a pproved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservior including cleaning propering the surface and curing etc., complete
Supplying fabricating and placing in position of HSD steel rods for reinforcemnet including the cost of steel and binding wire etc.,
Fabrication supply delivey and fixing of outside MS ladder of 45 cm wide made out of 50 x 50 c 6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded jointed etc. providing with suitable side supports clamps and locking arrangements provied with on coat of red oxide paint for provideng access to roof top 30,000 lit capacity OHT of sutiable inclined lenth including length including bottom anchaorage and transportation
Providing Platform in alround Periyar Statue
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting steel centering for sides soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable size of BG 10 stiffiened with welded MS angles of size 25mm x 25mm x 3mm of boarding laid over silver oak uoints of size 10cm x 6.5 cm spaced at 90 cm centre to centre and supported by causarina props pf 10 cm to 13 cm dia spaced at 75cm centre to centre complying with standared specification etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Renovation of Community Hall
Dismantling the damaged RCC
RCC 1:1.5:3 mix using 20 mm HBGS exculuding cost of reinforcement, centerin, shuttering, strutting, but including cost of mixing concrete, placing, vibrating with mechanical,vibrator finishing curing etc, complete.
Supplying and erecting steel centering for sides soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or suitable size of BG 10 stiffiened with welded MS angles of size 25mm x 25mm x 3mm of boarding laid over silver oak uoints of size 10cm x 6.5 cm spaced at 90 cm centre to centre and supported by causarina props pf 10 cm to 13 cm dia spaced at 75cm centre to centre complying with standared specification etc.,
White washing in two coats with best shell lime.including cost and conveyance of all materials to site and labour charges etc. complete
Supplying fabricating and placing in position of HSD steel rods for reinforcemnet including the cost of steel and binding wire etc.,
Distembering in two coats with best shell lime.including cost and conveyance of all materials to site and labour charges etc. complete
Exterior emulsion painting two coats with best shell lime using colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
Painting two coats with ready mixed paint for new iron work including cost of all materials to site and all labour charges etc complete.
Rainwater down fall pipe of 110mm dia
Light Point (SD 22)
Fan Point (SD 22)
Supply and fixing of Tube light Fittings (SD88)
Plug Point 3x3 (SD 139)
CFL Bulk Head
Supply and fixing of Fan (SD 106)
Renovation of Entrance Arch
Exterior emulsion painting two coats with best shell lime using colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S SIVASANKARAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .