Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹1.6 Cr+₹56,805.17 (0.37%)Rejected-Finance | ₹1.6 Cr+₹56,805.17 (0.37%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
10 Jan 2025, 3:00 pmClosed
Additional collector DRDA Madurai
o/o Additional collector DRDA Madurai
Strenthening and Black Topping from Kottagudi Panangadi - Ayyanarkovil Road Km 0 / 0 - 2 / 2 R-195 Strenthening and Black Topping from Swanjanpatti - Vinobacolony Road Km 0 / 0 - 2 / 2 R-80 in Melur Block in Madurai district under NABARD XXX
2024_RDTN_514730_25
DIPR/5603/Tender/2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Melur
Refer Tender documents
5 documents required · 5 mandatory
₹0
₹1.6 L
o/o Additional collector DRDA Madurai
6 Feb 2025
31 Dec 2024
10 Jan 2025
31 Dec 2024
10 Jan 2025
3 Jan 2025
3 Jan 2025
Amount
Part-1:- Strenthening and Black Topping from Kottagudi Panangadi - Ayyanarkovil Road Km 0 / 0 - 2 / 2 R-195
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking exiting BT Surface including all materials and labour charges etc complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per SS20B
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying tack coat over the Pream coat surface using 2.50 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.
Bituminous concrete of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for etc complete
Supply and fixing of KM stone SI No.44 A
Supply and fixing of HM stone SI No.44 A
Provision for Side marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision for Sign board Charges etc Complete
Provision for Name board Charges etc Complete
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part-2:- Strenthening and Black Topping from Swanjanpatti - Vinobacolony Road Km 0 / 0 - 2 / 2 R-80
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking exiting BT Surface including all materials and labour charges etc complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per SS20B
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.therefor and all incidental charges etc., complete for TOP LAYER
Providing and laying tack coat over the Pream coat surface using 2.50 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.
Bituminous concrete of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for etc complete
Supply and fixing of KM stone SI No.44 A
Supply and fixing of HM stone SI No.44 A
Provision for Side marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision for Sign board Charges etc Complete
Provision for Name board Charges etc Complete
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K. MOHAN, GOVERNMENT CONTRACTOR. (BID ID -1228127)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .