Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.2 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹5.8 L+₹58,368.94 (11.3%)Rejected-Finance 100 33 1 R G S ROAD USHAGRAM ASANSOL SALANPUR PASCHIM WEST BURDWAN BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHMAN | WEST BENGAL | 713303 | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder | |
| 3 | 3₹6.4 L+₹1.2 L (23.5%)Rejected-Finance DUTTA BAGAN SEN RALEIGH ROAD ASANSOL BARDHAMAN BARDHAMAN 713305 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713305 | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹5.0 L
EMD Value
₹6,300
Closing Date
4 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
Sonrpur Bazari Area
Complete repairing/rewinding of 250KW, 6600V, 3Phase, Induction Motor, Make- Marathon Sl. No. 3F660957/2 of S.B. Project.
2024_ECL_302083_1
GM/SBA/EnM/e-Tender/23-24/382
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonrpur Bazari Area
Please refer tender documents.
5 documents required · 5 mandatory
₹6,300
23 Mar 2024
21 Feb 2024
6 Mar 2024
22 Feb 2024
4 Mar 2024
22 Feb 2024
22 Feb 2024 - 26 Feb 2024
Amount
Item Description/ Heading
Material Cost
Supply of new electrolyte grade super enameled copper strips.
Supply of Glass fiber wool (F-Class) for covering DFGC on bare copper conductor.
Supply of Glass Mica Polyester (GMP) tape.
Supply of nomex paper for starter core insulation.
Supply of Kaftans tape for interlayer insulation of stator coils.
Supply of varnish.
Supply of thinner.
Cost of single core HT XLPE 70 Sq. mm Copper Cable.
Supply of silicon base glass wedges.
Cost of fabrication of both side bearing housing by metalization & machining as per bearing size.
Dynamic balancing of the Rotor.
Transportation charges.
Less: Cost of Scrap copper wire.
Labour Cost:-
Labour charges for Dismantling of complete motor.
Labour charges for taking out Stator coils from the stator core slots & Cleaning & decarburizing of core slots.
Labour charges for formation of coil with the converted DFGC copper conductor inserting the stator coil in the core, insulation of overhang portion of the coil with GMP tape, inter connection of coils & other related job.
Fixing of silicon base glass wedges.
Cost of fabrication of both side bearing housing by metalization & machining as per bearing size.
Final assembly of complete motor with all dismantled parts after proper baking & pre-delivery testing.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
JUBILEE ELECTROMECH WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_312945.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .