Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹130.6 CrAccepted-AOC FLAT NO 201 BLOCK B 2ND FLOOR BHAWANI COMPLEX MAIN SAGUNA KHAGAUL ROAD OPPOSITE RADIANT INTERNATIONAL SCHOOL DANAPUR PATNA 801105 | DANAPUR PATNA | PATNA | BIHAR | 801105 | ₹130.6 Cr | L1 | Accepted-AOC BEING LOWEST |
| 2 | L2₹134.4 Cr+₹3.7 Cr (2.87%)Rejected-Finance 8 2 1 1 FLAT NO 203 SITARAMA APARTMENTS OPP AXIS BANK LTD SRINAGAR COLONY ROAD PUNJAGUTTA HYDERABAD TELANGANA 500 082 | HYDERABAD | TELANGANA | TELANGANA | 500082 | ₹134.4 Cr+₹3.7 Cr (2.87%) | L2 | Rejected-Finance NOT BEING LOWEST |
| 3 | L3₹140.9 Cr+₹10.3 Cr (7.88%)Rejected-Finance 2 LETTER OF A W ARD N O N B C C E D CPG 2022 11 05 DATED 04 02 2022 3 LETTER N O N B C C E D CPG 2022 11 06 DATED 04 02 2022 | ₹140.9 Cr+₹10.3 Cr (7.88%) | L3 | Rejected-Finance NOT BEING LOWEST |
| 4 | L4₹164.7 Cr+₹34.1 Cr (26.1%)Rejected-Finance | ₹164.7 Cr+₹34.1 Cr (26.1%) | L4 | Rejected-Finance NOT BEING LOWEST |
| 5 | L5₹173.4 Cr+₹42.8 Cr (32.8%)Rejected-Finance PLOT NO GA 62 GAYATRI VIHAR PATIA BHUBANESWAR ODISHA PIN 751024 | KHORDHA | ODISHA | 751024 | ₹173.4 Cr+₹42.8 Cr (32.8%) | L5 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | Kanwarji Construction Co. L6 | Varindera Constructions Limited L3 | Som Projects Pvt Ltd L4 | DIVERSIFIED ENERGY SOLUTIONS PVT LTD L5 | SARYUG GAUTAM CONSTRUCTION PRIVATE LIMITED L1 | SHRADHA SABOORI PROJECTS INDIA PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|
| .10Schedule "A" Part – I to Schedule "A" Part – XX: NOTE: Schedule "A" Part – I to Part – XX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | |||||||||
| 1.00 | Lumpsum price worked out by the contractor for "Buildings & Structures", as listed in Schedule "A" Part – I . | 1 | EACH JOB | 1,41,67,69,888 ₹1,41,67,69,888 | 1,08,99,53,500 ₹1,08,99,53,500 | 1,29,70,88,804.97 ₹1,29,70,88,804.97 | 1,33,34,53,750 ₹1,33,34,53,750 | 1,02,03,82,000 ₹1,02,03,82,000 Lowest | 1,08,15,48,750 ₹1,08,15,48,750 |
| 2.00 | Lumpsum price worked out by the contractor for "Site Clearance / Earthwork/ Excavation", as listed in Schedule "A" Part – II . | 1 | EACH JOB | 1,17,63,383 ₹1,17,63,383 | 40,23,503.38 ₹40,23,503.38 Lowest | 50,52,078.34 ₹50,52,078.34 | 1,07,34,096.41 ₹1,07,34,096.41 | 80,05,088.85 ₹80,05,088.85 | 74,98,347 ₹74,98,347 |
| 3.00 | Lumpsum price worked out by the contractor for "Internal Electrification", as listed in Schedule "A" Part – III . | 1 | EACH JOB | 36,65,319 ₹36,65,319 | 65,10,211.34 ₹65,10,211.34 | 34,22,432.42 ₹34,22,432.42 Lowest | 62,91,380.7 ₹62,91,380.7 | 48,14,273.93 ₹48,14,273.93 | 43,65,850 ₹43,65,850 |
| 4.00 | Lumpsum price worked out by the contractor for "Internal Water Supply", as listed in Schedule "A" Part – IV . | 1 | EACH JOB | 86,08,446 ₹86,08,446 | 69,61,209.12 ₹69,61,209.12 | 63,55,679.71 ₹63,55,679.71 | 58,86,316.54 ₹58,86,316.54 | 45,04,311.79 ₹45,04,311.79 Lowest | 45,12,560 ₹45,12,560 |
| 5.00 | Lumpsum price worked out by the contractor for "Sewage Disposal B/R", as listed in Schedule "A" Part – V . | 1 | EACH JOB | 5,40,713 ₹5,40,713 | 6,98,373.02 ₹6,98,373.02 | 5,57,214.95 ₹5,57,214.95 | 6,15,602.89 ₹6,15,602.89 | 4,55,235.75 ₹4,55,235.75 Lowest | 5,22,486 ₹5,22,486 |
| 6.00 | Lumpsum price worked out by the contractor for "External Water Supply", as listed in Schedule "A" Part – VI | 1 | EACH JOB | 17,27,280 ₹17,27,280 | 14,83,086.63 ₹14,83,086.63 | 18,74,126.42 ₹18,74,126.42 | 12,17,513.56 ₹12,17,513.56 | 9,10,308.13 ₹9,10,308.13 Lowest | 9,46,520 ₹9,46,520 |
| 7.00 | Lumpsum price worked out by the contractor for "External Electrification", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 2,92,53,330 ₹2,92,53,330 | 1,88,97,169.65 ₹1,88,97,169.65 | 1,73,01,965.52 ₹1,73,01,965.52 | 1,87,34,236.01 ₹1,87,34,236.01 | 1,46,61,597.14 ₹1,46,61,597.14 | 1,35,00,000 ₹1,35,00,000 Lowest |
| 8.00 | Lumpsum price worked out by the contractor for Roads/Paths/Hard Standing", as listed in Schedule "A" Part – VIII . | 1 | EACH JOB | 2,02,43,480 ₹2,02,43,480 | 1,74,46,000.83 ₹1,74,46,000.83 | 1,97,32,523.84 ₹1,97,32,523.84 | 1,88,86,496.31 ₹1,88,86,496.31 | 1,40,84,844.71 ₹1,40,84,844.71 | 1,26,00,000 ₹1,26,00,000 Lowest |
| 9.00 | Lumpsum price worked out by the contractor for "Area drainage", as listed in Schedule "A" Part – IX | 1 | EACH JOB | 97,68,187 ₹97,68,187 | 92,91,574.96 ₹92,91,574.96 | 72,50,571.72 ₹72,50,571.72 | 96,99,100.18 ₹96,99,100.18 | 71,72,443.83 ₹71,72,443.83 | 63,35,453 ₹63,35,453 Lowest |
Tender Value
₹140 Cr
EMD Value
₹15 L
Closing Date
29 May 2026, 6:00 pmClosed
CHIEF ENGINEER NAVY VISAKHAPATNAM
CHIEF ENGINEER NAVY STATION ROAD VISAKHAPATNAM
PROVISION OF DEFICIENT SINGLE LIVING ACCOMMODATION AND TRAINING INFRASTRUCTURE FOR TRAINEE SAILORS AT INS CHILKA
2026_MES_751688_2
82349
Open Tender
Civil Works
Lump-sum
1095 days
CHILKA ODISSA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE CHILKA
₹15 L
Yes
2 Sept 2026
27 Apr 2026
5 Jun 2026
27 Apr 2026
29 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Schedule "A" Part – I to Schedule "A" Part – XX:
NOTE: Schedule "A" Part – I to Part – XX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | - | - | - | - |
| 1 | Lumpsum price worked out by the contractor for "Buildings & Structures", as listed in Schedule "A" Part – I . | 1 | EACH JOB | 93,43,75,000 | ₹93,43,75,000 |
| - | Lumpsum price worked out by the contractor for "Site Clearance / Earthwork/ Excavation", as listed in Schedule "A" Part – II . | 1 | EACH JOB | 87,87,833.57 | ₹87,87,833.57 |
| - | Lumpsum price worked out by the contractor for "Pile foundation", as listed in Schedule "A" Part – III | 1 | EACH JOB | 15,29,79,565.88 | ₹15,29,79,565.88 |
| - | Lumpsum price worked out by the contractor for "Internal Electrification", as listed in Schedule "A" Part – IV . | 1 | EACH JOB | 10,51,436 | ₹10,51,436 |
| - | Lumpsum price worked out by the contractor for "Internal Water Supply", as listed in Schedule "A" Part – V . | 1 | EACH JOB | 9,83,731.65 | ₹9,83,731.65 |
| - | Lumpsum price worked out by the contractor for "Sewage Disposal B/R", as listed in Schedule "A" Part – VI . | 1 | EACH JOB | 5,09,053.35 | ₹5,09,053.35 |
| - | Lumpsum price worked out by the contractor for "External Water Supply", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 9,54,958.12 | ₹9,54,958.12 |
| - | Lumpsum price worked out by the contractor for "External Electrification", as listed in Schedule "A" Part – VIII | 1 | EACH JOB | 1,61,23,949 | ₹1,61,23,949 |
| - | Lumpsum price worked out by the contractor for Roads/Paths/Hard Standing", as listed in Schedule "A" Part – IX . | 1 | EACH JOB | 1,57,44,015.35 | ₹1,57,44,015.35 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.11 MB
TENDER_merged.pdf
Tender Documents • 3.51 MB
BOQ_853997.xls
BOQ • 0.48 MB
TENDERREVISEDPS_merged.pdf
PDF • 18.27 MB
82349DATE2.pdf
PDF • 0.61 MB
tender_merged.pdf
PDF • 3.81 MB
82347date1.pdf
PDF • 0.61 MB
DRG2.rar
PDF • 28.71 MB
DRG1.rar
PDF • 18.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .