Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC KARAIKAL MUNICIPALITY PUDUCHERRY PY | ₹1.2 Cr | L1 | Accepted-AOC Work cancelled as requested by you. 50 percent of EMD forfeited |
| 2 | L2₹1.4 Cr+₹25.9 L (22.4%)Rejected-Finance NO 23 AMBOUR SALAI PUDUCHERRY 605 001 | PONDICHERRY | PUDUCHERRY | 605001 | ₹1.4 Cr+₹25.9 L (22.4%) | L2 | Rejected-Finance Unsuccessful tenderer |
| 3 | L3₹1.4 Cr+₹27.7 L (23.9%)Rejected-Finance KARAIKAL 609602 | KARAIKAL | PUDUCHERRY | 609602 | ₹1.4 Cr+₹27.7 L (23.9%) | L3 | Rejected-Finance Unsuccessful tenderer |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
9 Mar 2026, 4:00 pmClosed
Executive Engineer
Buildings and Roads Division, PWD, Karaikal
Improvements to internal roads of Mathakovil Street in Thiruvettakudy village in Kottucherry Commune.
2026_PWDC3_21885_1
59-04/PW/BRK/2025-26
Open Tender
Civil Works - Roads
Percentage
120 days
karaikal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,050
₹2.9 L
17 Sept 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of the existing black topped surfaces with brooms, soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. As per clause no 503.3.1 of MOST specification. | 6,280 | 1 Sqm (One Square Metre) | 10.82 | ₹67,949.6 |
| 2 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. On the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision) | 15,560 | 1 Sqm (One Square Metre) | 14.34 | ₹2,23,130.4 |
| 3 | Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen - VG30 | 405 | 1 Cum (One Cubic Metre) | 8,455.43 | ₹34,24,449.15 |
| 4 | Providing and laying bituminous concrete with HMP of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 509 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material.-Bitumen -VG30 | 190 | 1 Cum (One Cubic Metre) | 10,942.76 | ₹20,79,124.4 |
| 5 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | 315 | 1 Sqm (One Square Metre) | 725.15 | ₹2,28,422.25 |
| 6 | Providing and fixing of retro - reflectorised cautionary, mandatory & informatory sign as per IRC:67 made of aluminium sheet encapsulated lens with high intensity grade sheeting vide Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm X 75 mm X 6 mm ( 3.8 mtrs height - 6.8kg/mtr = 25.84 kg with board support angle 35x35x6mm - 2.8 mtrs - 3kg/mtr = 8.4kg and anchor flats - 0.5kg ) firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45 cm X 45 cm X 60 cm , 60cm below ground level as per approved drawing. - 80cm X 60cm rectangular . (including cost of angle iron towards cost of drilling holes , nuts , bolts etc.,) | 2 | 1 No (One Number) | 6,359.19 | ₹12,718.38 |
| 7 | Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Ordinary Soil - Manual Means - Depth upto 3 metres including the cost of labour and overhead charges. | 718 | 1 Cum (One Cubic Metre) | 437.19 | ₹3,13,902.42 |
| 8 | Supply and filling with Quarry rubbish including watering, ramming, consolidating and dressing, etc., complete as directed by the Engineer - in - Charge. | 159 | 1 Cum (One Cubic Metre) | 1,367.87 | ₹2,17,491.33 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) | 160 | 1 Cum (One Cubic Metre) | 6,796.41 | ₹10,87,425.6 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 fine aggregate : 4 graded stone aggregate 20mm nominal size) | 343 | 1 Cum (One Cubic Metre) | 7,870.41 | ₹26,99,550.63 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 2.30 MB
BOQ_22326.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .