Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,061.35Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L1₹93,061.35Admitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MAA SHAKUMBHARI TRADERS L1 | SHREE ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | cleaning thick bushes & throny jungle without uprooting with dispasal | 4,270 | M² | 6 ₹25,620 Lowest | 6 ₹25,620 Lowest |
| 2.00 | EarthWork in silt clearence of internal Section I/c lift upto 1.50 m & initial lead including ramming and dressing by manual labour or machines. The earth from clearence to be used in side embankment or to be disposed off spoil bank or as directed by Engineer -in-charge i/c cost of all labour T&P etc. complete. | 650 | M³ | 60 ₹39,000 Lowest | 60 ₹39,000 Lowest |
| 3.00 | Dressing of Excavated Silt/Earth By Manual Labour i/c all cost labour, T&P& ramming for Proper completion of work. | 650 | M³ | 4 ₹2,600 Lowest | 4 ₹2,600 Lowest |
| 4.00 | Uprooting jhoond including back filling with dressing i/c all cost of labour T&P etc. complete | 240 | Nos | 4 ₹960 Lowest | 4 ₹960 Lowest |
| 5.00 | Earth Work in correcting internal section including extra slush and lahel lift upto 1.50 m and lead upto 200.0 m including ramming and dressing by manual labour or machine.The earth from clearance to be used inside embankment or to be disposed off spoil banks or as directedby Engineer -in-charge i/c cost of all labour T&P etc. complete. | 119 | M³ | 125 ₹14,875 Lowest | 125 ₹14,875 Lowest |
| 6.00 | Videography / Photography of silt clearance works in canal and drains before,during and after silt clearance by DRONE as per requirement including supply of Videography / Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 3.52 | KM | 1,650 ₹5,806.35 Lowest | 1,650 ₹5,806.35 Lowest |
| 7.00 | Providing & fixing sign board size 3'x4' with Blue surface,edge & letter coloron iron sheet etc. complete | 1 | Nos | 4,200 ₹4,200 Lowest | 4,200 ₹4,200 Lowest |
Tender Value
₹1.1 L
EMD Value
₹3,000
Closing Date
7 Oct 2026, 2:00 pmClosed
EE UDEYC, Saharanpur
Office of the EE UDEYC, Saharanpur
Silt Clearance of Internal Section of Minor Kishankheri from km. 0.000 to km. 3.519 in District Saharanpur
2026_UPIDC_1190937_46
03/EE/UDEYC/2026-27
Open Tender
Civil Works - Canal
Item Rate
15 days
Minor Kishankheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹589
₹3,000
Office of the EE UDEYC, Saharanpur
17 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
6 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | cleaning thick bushes & throny jungle without uprooting with dispasal | 4,270 | M² | - | - |
| 2 | EarthWork in silt clearence of internal Section I/c lift upto 1.50 m & initial lead including ramming and dressing by manual labour or machines. The earth from clearence to be used in side embankment or to be disposed off spoil bank or as directed by Engineer -in-charge i/c cost of all labour T&P etc. complete. | 650 | M³ | - | - |
| 3 | Dressing of Excavated Silt/Earth By Manual Labour i/c all cost labour, T&P& ramming for Proper completion of work. | 650 | M³ | - | - |
| 4 | Uprooting jhoond including back filling with dressing i/c all cost of labour T&P etc. complete | 240 | Nos | - | - |
| 5 | Earth Work in correcting internal section including extra slush and lahel lift upto 1.50 m and lead upto 200.0 m including ramming and dressing by manual labour or machine.The earth from clearance to be used inside embankment or to be disposed off spoil banks or as directedby Engineer -in-charge i/c cost of all labour T&P etc. complete. | 119 | M³ | - | - |
| 6 | Videography / Photography of silt clearance works in canal and drains before,during and after silt clearance by DRONE as per requirement including supply of Videography / Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 3.52 | KM | - | - |
| 7 | Providing & fixing sign board size 3'x4' with Blue surface,edge & letter coloron iron sheet etc. complete | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.53 MB
BOQ_2245464.xls
BOQ • 0.26 MB
CorrigendumForDate01.pdf
Additional Documents • 0.09 MB
03BOOKLATESilt.pdf
Tender Documents • 5.84 MB
051026CORRI.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .