Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC Lowset | |
| 2 | L2₹9.4 L+₹33,000 (3.64%)Rejected-Finance 24 42 1 B BHATAI NEW COLONY NAINI PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | L2 | Rejected-Finance Highest | |
| 3 | L3₹10.2 L+₹1.1 L (12.1%)Rejected-Finance | L3 | Rejected-Finance Highest |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
24 Aug 2021, 1:00 pmClosed
SE EDC-I, Mathura
Near Kali Mandir, Mathura Cantt, Mathura
The Work for Replacement of Defective Meter, Re-Installation of Unenerzised Meter with New Box if required, and by connecting Unenergized Meter to LT Line with Consumer Load Cut Out for MU Base Billing Under EDD-IV, Goverdhan, Mathura
2021_DVVNL_599871_2
08/EDC-I(M)/2021-22
Open Tender
Electrical Works
Item Rate
365 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,062
Dvvnl Portal (dvvnl.org)
₹9,000
Yes
19 Oct 2022
19 Aug 2021
24 Aug 2021
19 Aug 2021
24 Aug 2021
19 Aug 2021
Amount
(A) In case of Defective Meter (IDF etc.) :- Replacement of Single Phase meter at consumer's premises at appropriate outside location and height (atleast 5 Feet), then connecting the meter with LT distribution Line and consumer's cut out/electrical fitting. Work includes proper completion and submission of sealing certificate to the concern supervisiory engineer with Pre and post work photographs, and entry of meter advise in billing data by providing Meter advise report in prescribed M.S. Excel format. and conversion of consumers to MU Base Billing. (B) Review of connections for confirming MU Base Billing after 10-15 days of meter installation as per Billing Parameter and providing meter reading in KWH and Maximum Demand in M.S. Excel format.
(A) Where Meter is Installed (Meter OK in Box) but Service Cable not available :- Re-installation of existing meter with new box at consumer's premises at appropriate outside location and height (about 5 Feet), then connecting the meter with LT distribution Line and consumer's Load/Cut out/electrical fitting with Submission of Sealing Certificate to the Concern Supervisiory Engineer with Pre and post work photographs, and entry of meter advise in billing data by providing Meter advise report in prescribed M.S. Excel format and Conversion of Consumers to MU Base Billing. (B) Meter Box and Service Cable will be Provided by The Department as per site requirment and length of Service Cable to be mentioned in Sealing Certificate. (C) Review of connections for confirming MU Base Billing after 10-15 days of meter installation or Reinstallation as per Billing Parameter and providing meter reading in KWH and Maximum Demand in M.S. Excel format.
(A) Where Meter is Installaed and Service Cable is available but Not Connected to LT Distribution Line :- Connecting the meter with LT distribution Line and consumer's Load Cut out/electrical fitting with Submission of Sealing Certificate to the Concern Supervisiory Engineer with Pre and post work photographs, and entry of meter advise in billing data by providing Meter advise report in prescribed M.S. Excel format and Conversion of Consumers to MU Base Billing. (B) Service Cable will be Provided by The Department as per site requirment and length of Service Cable to be mentioned in Sealing Certificate. (C) Review of connections for confirming MU Base Billing after 10-15 days of Connecting the Unenergzied meter to LT Distribution Lin with Consumer Load/Cut Out as per Billing Parameter and providing meter reading in KWH and Maximum Demand in M.S. Excel format.
Sai Enterprises
Shri Krishna Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .