Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 CrAccepted-AOC D 123 SECTOR 7 NOIDA UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹5.7 Cr | 1 | Accepted-AOC Rates are on lower side |
| 2 | 2₹8.0 Cr+₹2.2 Cr (39.0%)Rejected-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹8.0 Cr+₹2.2 Cr (39.0%) | 2 | Rejected-AOC Rates are on higher side |
| 3 | 3₹9.0 Cr+₹3.2 Cr (56.6%)Rejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹9.0 Cr+₹3.2 Cr (56.6%) | 3 | Rejected-AOC Rates are on higher side |
| 4 | Not Admitted-Fee/PreQual/Technical C 1001 NOIDA ONE SECTOR 62 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201309 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201309 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical H NO 30 SECTOR 17 PANCHKULA 2022R6473 | PANCHKULA | PANCHKULA | HARYANA | 2022 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.2 Cr
EMD Value
₹12.5 L
Closing Date
1 Jun 2023, 5:00 pmClosed
AMIT KUMAR SANDILA
EE PHE Division Sohna
Upgradation of existing 4.5 MLD STP including civil/ mechanical / electrical installations with provision of VFD, DO Meter, Flow meter
2023_HRY_279564_1
2023FA5DE7E3 47DE 4CFE A032 79F0071C09A6558PUH
Open Tender
Civil Works
Works
365 days
Pataudi
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹12.5 L
Yes
31 Aug 2023
5 May 2023
2 Jun 2023
5 May 2023
1 Jun 2023
5 May 2023
Amount
Up gradation and commissioning after conversion of existing 4.50 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to extended aeration process with addition of new Mechanical Coarse and Fine Screens, aeration tanks, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set & transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e. completion of tertiary treatment plant at Pataudi town District Gurugram. (a) Entire Civil works as per DNIT (As per detail attached and inclusive of O&M). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and O&M cost (as 20%) of quoted L.S cost
Up gradation and commissioning after conversion of existing 4.50 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to extended aeration process with addition of new Mechanical Coarse and Fine Screens, aeration tanks, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set & transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e. completion of tertiary treatment plant at Pataudi town District Gurugram. (b) Entire mechanical, electric & instrumentation works as per DNIT – Existing mechanical equipment, Electric & instrumentationequipment any other works contingent thereto (As per detail attached and inclusive of O&M). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and O&M cost (as 20%) of quoted L.S cost)
Up gradation and commissioning after conversion of existing 4.50 MLD Capacity sewage Treatment based on Moving Bed Biological Reactor Technology (Attached growth process) to extended aeration process with addition of new Mechanical Coarse and Fine Screens, aeration tanks, Internal Recirculation Pumps, Treated Effluent Lifting Pumps with Tertiary Treatment based on Deep Bed Filters followed by Chlorination in existing STP complete in all respect with PLC with data transfer through modem to website, DG set & transformer for additional capacity and all other works contingent thereto including Operation and Maintenance of existing STP /MPS during up- gradation period and 3 months of trial run period 12 months defects liability period after and 5 years thereafter on the commissioning of up- gradated STP i.e. completion of tertiary treatment plant at Pataudi town District Gurugram. (c) Repair of existing structures as per site requirement (the bidders have to visit the site to assess the works required for repair of existing structures for achieving the prescribed HSPCB effluent standards). (The rate quoted by contractor shall be bifurcated into capital cost (as 80%) and O&M cost (as 20%) of quoted L.S cost)
Jaiveer Singh Contractor
RAJEEV KUMAR GOEL CONTRACTORS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .