Under District Gonda, Construction Of Camp Office For Regulated Area Gonda, Lot No 1
2026_REDUP_1164261_1
181/SE RED Devipatan/Gonda/26-27 Dt 11/06/2026
Open Tender
Civil Works
365 days
Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹70,000
SE RED, Devipatan Circle Gonda
26 Jun 2026
26 Jun 2026
21 Jul 2026
26 Jun 2026
20 Jul 2026
26 Jun 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Excavation of Foundation-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 1 | Cum | 181.75 | ₹181.57 |
| - | Excavating. Supplying, stacking and filling of local earth (including roylaty) by mechhanical transport upto a lead of 5 km. also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complate for all lift.2.25A | - | Cum | 489.13 | - |
| - | Sand Filling-Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | Cum | 1,482.91 | ₹1,481.43 |
| - | PCCProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 4,756.48 | - |
| - | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground Floor) Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration 2.35.3.1 | - | Sqm | 216.5 | - |
| - | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | - | - | - | - |
| - | Footing | - | Cum | 6,636.69 | - |
| - | Column | - | Cum | 6,636.69 | - |
| - | Plinth | - | Cum | 6,636.69 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_2182905.xls
BOQ • 0.44 MB
T2_GONDA.pdf
Tender Documents • 1.94 MB
Download all tender documents and submit your bid