| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹9.4 LRejected-Finance | ₹9.4 L | L2 | Rejected-Finance Higher Rate |
| Sl No | Description | Qty | Unit | YASHARDA ENTERPRISES L1 | The RH Coop L&C Society ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Precast RCC Slab for Drain | 50 | Each | 900 ₹45,000 | 1,000 ₹50,000 |
Tender Value
₹12.0 L
EMD Value
₹28,371
Closing Date
19 Mar 2026, 5:00 pmClosed
Dinesh Kumar
Municipal Committee Kanina
CLEANING, DESILTING AND REPAIR OF ALL DRAINS BEFORE MANSOON SEASON OF MC KANINA. (Session 2026-27)
2026_HRY_508271_1
20269AA805A5 8B00 45A3 8144 818163A85569334ULB
Open Tender
Civil Works
120 days
Kanina
CLEANING, DESILTING AND REPAIR OF ALL DRAINS BEFORE MANSOON SEASON OF MC KANINA. (Session 2026-27)
2 documents required · 2 mandatory
₹1,000
₹28,371
Yes
24 Apr 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
19 Mar 2026
13 Mar 2026
13 Mar 2026 - 19 Mar 2026
Precast RCC Slab for Drain
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[14.67]Hoisting and placing precast R.C. concrete slab or stones in position on outlets or W.C. culverts by mechanical/ mannual means [Through Rate]
[17.67]Removal of existing CC Block. Removing of existing CC block pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or desired by Engineer. [Through Rate]
[17.68]Relaying of available (removed and stacked) C.C. Block M-30 Size 450x300x150mm Relaying of available (removed and stacked) C.C. Block M-30 Size 450x300x150mm and spreading 25 mm thick sand underneath filling joints with sand as per technical specification clause 1503. [Through Rate]
[3.CA002] CA002. Dump manure or Sludge [Rate]
[30.91]Cleaning of chocked sewer line by diesel running vehicle mounting hydraulic operated high pressure suction cum jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jetting tank capacity including skilled operator, supervising engineer etc. for cleaning and partial desilting of manholes and dechocking of sewer lines. Dechocking and flushing of sewer line from one manhole to another by high pressure jetting system of 2200 PSI for sewer line from 150mm dia up to 300mm [Through Rate]
[5.26]Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[6.43]Providing, hoisting and fixing above plinth level up to floor four level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_587038.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid