| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.3 L+₹5,969 (4.76%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | INDU ERECTION L1 | BIRUNTHA ENGINEERING CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the scrapper conveyor feeder Gear Coupling end side plate support channels removing, grinding the weldments, releasing the bends for further usage and re-erecting the old/new SS channels with new side plate and with bottom channels and feeder bed channels. This includes cost of consumables like goughing electrodes. S.S.Electrodes. cutting gas.etc and hire charges for T&P's. | 1 | Opn | 32,635 ₹38,509.3 Lowest | 34,189 ₹40,343.02 |
| 2.00 | Charges for cutting and removing the wornout S.S feeder body Coupling end side plate from bottom and slope plate after taking the existing dimensions like gap between side plates, diagonal lengths, slag bath height etc., as per the direction of Engineer - in - charge including cot of consumables like goughing electrode, cutting gas and hire charges for T&P's like welding machine, cutting set etc., and devolution os scrap stores. | 1 | Opn | 27,406 ₹32,339.08 Lowest | 28,711 ₹33,878.98 |
| 3.00 | Charges for transporting of SCF Gear Coupling end side plate from central stores, lifting of new Gear Coupling end plate, setting, aligning the plates, welding the plates with bottom & slope plates, and with bottom & slope plate channels, fixing the necked flange, making 2 nos openings for fixing submercible idler wheel assembly and 2 nos opening for fixing bottom idler wheel assembly fixing the support arrangement for plummer block, inspection of any water leakage in welding and re-welding including cost of consumables like goughing rod, S.S.Electrode etc., and hire charges for T&P's like welding machine grinding machine. chisels, etc., complete. | 1 | Opn | 35,875 ₹42,332.5 Lowest | 37,584 ₹44,349.12 |
| 4.00 | Removing the 1 No chain tension adjustment assembly from old side plate and erection of the same chain tension adjustment assembly in new side plate by lifting the driven shaft assembly by jockey on both free end, arresting with proper supports. Removing and refixing the plummer block. And then assembling & alinging the driven shaft assembly after completion of 1 No chain tension adjustment assembly erection work. Including cost of consumables like cutting rod, SS welding rod, etc., T&P complete. | 1 | No | 29,432 ₹34,729.76 Lowest | 30,833 ₹36,382.94 |
Tender Value
Refer Docs
EMD Value
₹1,300
Closing Date
13 Dec 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II AHP Unit IV BAH Scrapper Conveyor Feeder 4A2 Erection of new Gear Coupling end side plate and its supporting channels after removing of wornout Gear coupling end side plate channels and normalising the feeder
2025_EB_629941_1
CE/TTPS/SE/M-II/No.308/2025-26
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹1,300
Yes
17 Dec 2025
8 Dec 2025
15 Dec 2025
8 Dec 2025
13 Dec 2025
8 Dec 2025
Charges for dismantling the scrapper conveyor feeder Gear Coupling end side plate support channels removing, grinding the weldments, releasing the bends for further usage and re-erecting the old/new SS channels with new side plate and with bottom channels and feeder bed channels. This includes cost of consumables like goughing electrodes. S.S.Electrodes. cutting gas.etc and hire charges for T&P's.
Charges for cutting and removing the wornout S.S feeder body Coupling end side plate from bottom and slope plate after taking the existing dimensions like gap between side plates, diagonal lengths, slag bath height etc., as per the direction of Engineer - in - charge including cot of consumables like goughing electrode, cutting gas and hire charges for T&P's like welding machine, cutting set etc., and devolution os scrap stores.
Charges for transporting of SCF Gear Coupling end side plate from central stores, lifting of new Gear Coupling end plate, setting, aligning the plates, welding the plates with bottom & slope plates, and with bottom & slope plate channels, fixing the necked flange, making 2 nos openings for fixing submercible idler wheel assembly and 2 nos opening for fixing bottom idler wheel assembly fixing the support arrangement for plummer block, inspection of any water leakage in welding and re-welding including cost of consumables like goughing rod, S.S.Electrode etc., and hire charges for T&P's like welding machine grinding machine. chisels, etc., complete.
Removing the 1 No chain tension adjustment assembly from old side plate and erection of the same chain tension adjustment assembly in new side plate by lifting the driven shaft assembly by jockey on both free end, arresting with proper supports. Removing and refixing the plummer block. And then assembling & alinging the driven shaft assembly after completion of 1 No chain tension adjustment assembly erection work. Including cost of consumables like cutting rod, SS welding rod, etc., T&P complete.
BIRUNTHA ENGINEERING CONSTRUCTION (BID ID -1530571)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_753337.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .