Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 605 6TH FLOOR LOTUS TOWER TAJ ROYALE FATEHABAD ROAD TAJ NAGARI PH II AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹46.4 L
EMD Value
₹46,500
Closing Date
18 Oct 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE EWC Agra
Construction of 33 KV Lines from 132 KV sub statotion Shamshabad and Installation of additional 5 MVA Transformer at Kuberpur Sub station in Agra
2023_DVVNL_839447_2
EWCA/T-03 (2023-24)
Open Tender
Electrical Works
Fixed-rate
90 days
Agra
as per tender specification
2 documents required · 2 mandatory
₹3,000
DVVNL
₹46,500
25 Oct 2023
30 Sept 2023
18 Oct 2023
30 Sept 2023
18 Oct 2023
30 Sept 2023
Amount
Part-A (Supply of Material) As per RESSPO Norms & Drawaing
Bus Bar Gantry
M.S. Angle 50×50×6 mm, 2.350 M
Structure of 33 KV Bus Isolator.
33 KV Post Insulator
Structure of 33 KV Post Insulator
Structure of 33 KV Lightening Arrestors
90 Lbs. Rail pieces for T/F
Plinth and foundation of T/F
33 KV Fuse Set
Structure of 33 KV Fuse Set
Control cable 4 × 2.5 Sq.mm.
Control cable 2 × 2.5 Sq.mm.
Alluminium Paint for painting of Sub-Station Structure & equipment.
Chemical Pipe earthing
Sundry Stores
33 KV Cross arm holding clamp with nuts, bolts & washers
" F " bracket for 33 KV line
" E " bracket for 33 KV line
Armour rod with ferrule for Dog conductor
G.I. Angle 65x65x6 mm, 4300 mm long for bracing with 4 nos clamps
G.I. Top Channel 125x65 mm, 3200 mm long with 2 nos clamps
G.I. Droper Channel 100x50 mm, 3000 mm long with 2 nos clamps
P.G. Clamp for ACSR Dog conductor, L.I., B.I., L.A., T/F, Bus Bar etc.
G.I. Nut, bolt with washer off size
G.I. Guarding Angle 65x65x6x2600 mm
G.I. Guarding Angle 65x65x6x3600 mm
Holding clamp for guarding angle with nuts & bolts
G.I. Barbed wire
G.I. Wire No. 16 SWG
G.I. Wire No. 6 SWG
G.I. Wire No. 8 SWG
Stone Pad (300x300x75 mm.)
33 KV Number plate with clamp with nuts, & bolts
33 KV Danger board with clamp with nuts, & bolts
Alluminium binding wire- 6 SWG
Alluminium paint
Red oxide paint
Turn Buckle
Eye bolt 12 x 110 mm
Earthing of Pole by M.S. earthing Rod of 20 x2500 mm and 6 SWG earthing wire etc.
Complete Stay (GI stay rod 20x1800mm, stay wire 7/8 SWG 10 Kg., stay insulator, stay clamp with bolt, nut & washer)
Clamps for fixing of cable and cable box
Supply of HDPE Pipe 160 mm dia PN-6, PE-100 Grade UV Stabilized for Double Pole Structure and U/G laying of 3x300 Sq. mm. 33 KV XLPE Cable below the Railway Track/Highway (Pipe to be laid by H.D.D. method)
Clamps for holding of 160 mm dia H.D.P.E. Pipe
Cable marker
Wooden Bushes
Sub Total of Part-A (Supply of Material)
Part-B (Erection Work) As per RESSPO Norms & Drawaing
Carriage of following material from Center Store to Site (i) 11 KV SWITCH GEARS of Incoming and Outgoing VCB
(ii) 11 KV Cable and jointing kit etc.
(iii) 9.0 Mtr. P.C.C. Pole
(iv) 11.0 Mtr. S.T.P. Pole
(v) 13.0 Mtr. S.T.P. Pole
(Vi) 33 KV Cable, Outdoor jointing kit, etc.
(vii ACSR Dog Conductor
(viii) Other line materials
INSTALLATION OF BUS BAR GANTRY : Assembling and installation of Bus Bar Gantry complete in all respect. The work also includes erection of disc fitting, disc insulator, P.G. clamp jumpering and conductoring on Bus Bar Gantry.
INSTALLATION OF BUS ISOLATOR : Assembling and installation of Bus Isolator on the Bus Isolator structure. The work includes fabrication for proper fixing if required.
INSTALLATION OF POST INSULATOR : Assembling and installation of Post Insulator on the Post Insulator structure. The work includes fabrication for proper fixing if required.
INSTALLATION OF LIGHTENING ARRESTOR : Assembling and installation of Lightening Arrestor on the Lightening Arrestor structure. The work includes fabrication for proper fixing if required.
INSTALLATION OF 33 KV FUSE SET : Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing if required.
ISOLATOR STRUCTURE : Fabrication of isolator structures 3.5 Mtrs. in height as per drawing No. RES. 39 Digging of two Nos. pits of size of 1.075x 0.9 x 0.3 Mtr., providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC of two legs of the isolator structure in CC ( Cement, coarse sand and stone grit of 20 mm gauge ) of ratio 1:4:8 in block of 1.075 Mtr. x 0.9 Mtr. x 0.3 Mtr. including supply of all T & P complete in all respect. The work includes dragging , shifting up to 40 Mtrs., raising and erecting the two legs with runner of isolator in proper alignment, level and plumb. Both plinth of the isolator structure shall be properly finished with champering of edges.
LIGHTENING ARRESTOR/ POST INSULATOR/FUSE SET STRUCTURE: Fabrication of Lightening arrestor / post insulator / fuse set structure as per drawing No. RES. 39 Digging of two Nos pits of size of 1.075x 0.3x 0.3 Mtr. , providing stone pad at the bottom of the pit and grouting of two legs of the above structures in CC ( Cement, coarse sand and stone grit of 20 mm gauge ) of ration 1:4:8 in block of 1.075 Mtrs. x 0.3 Mtrs. x 0.3 Mtrs. including supply of all T&P complete in all respect. The work include dragging, shifting up to 40 Mtrs., raising and erecting the two legs with top frame above structures in proper alignment, level and plumb. Both plinths of the structures shall be properly finished with champering of edges etc.
PAINTING OF STRUCTURE : Painting of Isolator/L.A./Post Insulator/Fuse Set Structures with one coat of ready and two coats of Aluminum paint of good quality including cost of material, labour and T&P complete in all respect.
Chemical Pipe earthing for LA, T/F body and T/F neutral earthing by making delta
Fabrication and grouting of G.I. Channel 100x50x6 mm. in L shape & in proper size and alignment to provide support for the two separate Earthing strips for power transformer neutral including supply & fixing of two nos. flexible copper bonds for neutral Earthing. The work also includes painting of G.I. Channel with two coats of aluminium paint.
Fabrication and erection of cable support made of two pieces of G.I. 65x65x6 mm. 3.00mtr. long, joined to each other by means of 5 Nos. M.S. flat 50x6 mm. pieces of size 150 mm. long each by welding at equal intervals as per drawing and grouting in a block of size 300x300x700 mm complete with two coats of Aluminum paint. This includes providing of four nos. G.I. clamp made of G.I. flat for holding the cable including Nuts & bolts.
PLINTH OF 5 MVA, 33/11 KV TRANSFORMERS : Construction of plinth of size 3.46x4.46 Mtr. for 5 MVA Transformers having 0.5 Mtr. below ground level and 0.4 Mtr. above ground level. The work also includes laying of 2 Nos. 3.46 Mtrs. long each rail pieces complete with cutting welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/finished on top and sides of the plinth.
Installation of 11 KV I/C VCB 600/300/5A, 350MVA
Installation of 11 KV O/G VCB 200/100/5A, 350MVA
Laying and dressing of 11 KV , 3x300/185 Sq. mm. under ground cable in the trench as per Resspo norms. The work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling.
FIXING OF 11 KV CABLE ENDS: (A) Preparing and fixing of 11 KV, XLPE cable cut out door jointing kits after carefully removing the insulation of the cable, duly plumbing and taping of cable providing, fixing and crimping of proper size good quality lugs and complete work including cost of material such as insulating tapes, cotton tape, plumping material and lugs etc. other than jointing kits.
(B) Preparing and fixing of 11 KV XLPE cable indoor jointing kits on switch gears after care fully removing the insulation for the cable, providing, fixing and crimpling of proper size good quality lugs , duly plumbing and taping of cable with good quality of cotton tape, empire tape, H.T. Tape and PVC tape, properly fixing of lugs on switch gears and boxer complete in all respect including cost of material such as insulating tapes, cotton tape , plumbing material and lugs etc. other than jointing kits.
Laying of 2 x 2.5 mm² control cable through cable trench in SGR interlinking through proper connections Transformer control panel/ Protection board/Battery & Battery Charger/ buchholtz relay/ 33/11 KV Transformer junction box etc. as per site conditions.
Laying of 4 x 2.5 mm² control cable through cable trench in SGR interlinking through proper connections Transformer control panel/ Protection board/Battery & Battery Charger/ buchholtz relay/ 33/11 KV Transformer junction box etc. as per site conditions.
OUT DOOR EARTHMAT : Laying of earth mat in the switch yard by laying of M.S. Round of 32 mm dia. in 750 mm deep trenches and grounding of earth mat with M.S. Round 32 mm. dia.,3 mtr. long earth electrodes as per drawing. The work includes welding/bolting of M.S. round, M.S. Branch Strips pad connecting all steel structures in the switch yard with the earth and connection by M.S. Flat to pipe earthing and chemical pipe earthing as per Resspo norms
IN DOOR EARTHMAT : Preparation of earth mat for earthing of indoor equipments by means of M.S. earth strips 50X6 mm connecting to 4 nos. earthing electrodes of 32 mm dia. (including fabrication of earthing electrodes) 3Mtr. long on both side of control room (as per RESPO drawing RES-40) This work includes driving of earth electrodes straight down into the earth so that its top remain 500 mm below ground level, earth work laying bending, welding of M.S. earth strips 50X6mm in the trench of con trol room and connection to both side squares. Earthing of all indoor equipments by providing and laying M.S. earth strip 50X6mm including cutting, welding bending etc.
Alluminium Paint for painting of Sub-Station Structure & equipment.
Sundry Stores
Erection of Single Pole on 9 Mtr. Long PCC Poles
Erection of Single Pole on 11 Mtr. Long SP-55 poles
Erection of Single Pole on 13 Mtr. Long SP-72 poles
Erection of double Pole on 9 Mtr. Long PCC Poles.
Erection of double Pole on 11 Mtr.SP-55 Poles
Erection of double Pole on 9 Mtr. PCC Poles Double Pole support for cable x-ing
Erection of Tri Pole on 9 Mtr. Long PCC Poles.
Erection of Tri Pole on 11 Mtr.SP-55 Poles
Erection of Four Pole on 9 Mtr. Long PCC Poles.
Erection of Four Pole on 11 Mtr.SP-55 Poles
Errection and grouting of stay rods 1800 x 20 mm. including all works of excavation, fixing, tightening & nozzling of stay with the poles and of required tension as per relevant drawing including back filling of earth and proper ramming.
Earthing of supports with M.S. Earth Rod 2.5 Mtr. in length including excavation of pit and driving M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. Wire 8 SWG, Nuts & bolts and earthing lugs.
Laying, spreading, lifting and final sagging of ACSR Dog Conductor in accordance with profiles and sag chart including binding, jumpering and fixing of all accessories in 3 Nos. conductor in parallel.
Fixing of cross bracing sets from M.S. Angle 65 x 65 x 6 / 50 x 50 x 6mm including cutting, drilling holes and providing M.S. Bolts of required size as per relevant drawing.
Providing and Fixing of danger board at each location as per relevant drawing.
Providing and Fixing of number plate at each location as per relevant drawing.
Providing and Fixing of Barbed wire on each pole as per relevant drawing.
Painting of Pole from top to galvanized portion with one coat of ready mix primer and Two coats of red paint. a) 11 Mtr.SP-55 poles
b) 13 Mtr.SP-72 poles
The Grouting and making of plinth of the support (1/6 of the full length of the supports) will be done as per norms in the CC 1:4:8 with cement, course sand and brick ballast including back filling and proper ramming.fixing of all clamps and other accessories as per relevant drawing. i) 9 Mtr. Long PCC Poles
ii) 11 Mtr. Long SP-55 poles
iii) 13 Mtr. Long SP-72 poles
Guarding between two poles like Single / Double / Tri / Four poles etc. to guard L.T. / 11KV/ Telephone lines, Road / River Crossing etc. with G.I.Wire 6 SWG and G.I. Wire 8 SWG including fixing of guarding channel with clamps and nuts & bolts etc. as per relevant drawing.
Continuous Guarding between two poles like Single / Double / Tri / Four poles etc. to guard L.T. / 11KV/ Telephone lines, Road / River Crossing etc. with G.I.Wire 6 SWG and G.I. Wire 8 SWG including fixing of guarding channel with clamps and nuts & bolts etc. as per relevant drawing.
Making H.T. Connection of the proposed line, on to the existing 33 KV bay/ Line from where line is emanating and another at 33 KV Sub-Station. The work consists of fixing of tension fitting Insulators, Jumpering, Clamping and binding etc. at the end as per site conditions.
Choping of branches of trees such as Eukeyleptus, Neem, Kedar and other kind of trees along the route of the line and disposal of the same at suitable place.
Digging of trench and Laying of 3x300 sq.mm. cable in H.D.P.E Pipe 160 mm dia below 1.5 Meter of ground level by open trench Method, back filling of earth, ramming and dressing properly complete Job and providing Cable Marker and wooden bushes at both ends. (50) x 2 = 100 Mtr.
Laying of 33 KV power XLPE 3 x 300 Sq.mm Cable without pipe in loop by excavation of trench as per Resspo norms below ground level including laying of bricks to cover the cable in the cable trench and back filling of earth, ramming and proper dressing (12.0 + 12.0 ) x 2 = 48 Mtr.
Filling of 33 KV out door type heat shrinkable cable jointing kit at the end of cable by plumbing and tapping of cable. Fixing and clampling of proper size and good quality lugs, after providing 3.00 Mtr. long H.D.P.E. pipe 160-mm dia over the 33 KV Power Cable as above Ground Level complete work including cost of insulation tapes lugs, Pipe etc. other than jointing Kits. ( 3+3 ) x 2 = 12 Mtr.
Lifting, mounting/ Fixing and clamping of 33 KV Cable with cable joining kits on already erected Double Pole Structure and making connections with over head line. The work includes the sealing of H.D.P.E. Pipe top. The lower end of the pipe is to be burried into the earth by about one feet.(6+6) x 2 = 24 Mtr.
Sub Total of Part-B (Erection Work)
Grand Total of (Part-A & Part-B)
Note: GST shall be paid Extra
shiva engineering AND suppliers
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .