Supply and fabrication of structural steel | Supply, fabrication and erection in position; bolted and/or welded structural steel works at all levels; including all built-up sections /compound sections made out of rolled sections and / or plates in trusses; rafters; purlins; wind ties; coloumns; portals; platforms; staircases; (excluding chequered plates, swing ladders, foundation bolts and gratings) ladders; stoppers; brackets sag rods; supports forequipment and accessories; hand railings posts cutting to required size as per approved drawings; straightening if required bolting/ welding of joints (including sealing the joints of the box sections with continuous welding wherever specified) finishing edges by grinding; fixing in line and level with temporary staging and removal of same after erection; grouting with ordinary grout or non-shrink grout as specified; including preparation of detailed fabrication drawings, cost of painting as specified below, complete in all respect as directed by Engineer-in-charge. Cost of nut-bolts to be borne by contractor. NOTE :1. All structural steel shall conform to IS-2062 & IS-808 and of SAIL/TISCO/IISCO/ JINDAL/ ESSAR/ VIZAG STEEL or equivalent make with prior approval from BPCL only.13carried out after completion of the erection works. Min. hot works will be allowed at site. It is vendors responsibility to verify the actual measurements at site before making the bolting shedule.3. PAINTING SPECIFICATIONS :The cost includes surface preparation by grit/shot blasting to SA 2.5finish of swedish standard SIS 05 5900.Primer Coat :After surface preparation one coat of inrganic zinc silicate @ 65 microns. Intermediate Coat: One coat of epoxy high built micaceous iron oxide @ 100 microns. Top Finish Coat :2 coats of acrylic aliphatic polyeurethene @ 30 microns per coat. Total DFT 225 microns minimum. The rate includes the cost of materials, |