| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹1.2 Cr+₹4,815.87 (0.04%)Rejected-AOC | ₹1.2 Cr+₹4,815.87 (0.04%) | L2 | Rejected-AOC Rejected |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
16 May 2023, 3:00 pmClosed
Addl. Collector (Dev.) / PD DRDA KRISHNAGIRI
DRDA KRISHNAGIRI
Strengthening of road from Kundukottai to Erichetty Eri KM 0_0 to 3_26 at Kundukottai (R 156) in Thally Block of Krishnagiri District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 Package No TN 04 KRI 87
2023_RDTN_310926_1
RefNo_1433_2023_R3_21_04_2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Thally
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.2 L
DRDA KRISHNAGIRI
12 Jul 2023
4 May 2023
16 May 2023
4 May 2023
16 May 2023
4 May 2023
10 May 2023
Amount
Strengthening of road from Kundukottai to Erichetty Eri KM 0/0-3/26 H/o. Kundukottai (R-156) - Rs.117.820 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5cm to 10cm Old Metalled Surface and Sectioning -1 Sqm
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM/ WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and Laying Bituminous Concrete Based on job mix Formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving bitumen 60/70 Penetration grade as per IS 73 and Aggregates Conforming to Grading
Provision for H.M Stone
Provision for K.M Stone
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1 m centre to centre at approved locations to control speed, marked with white strips of road marking paint
Providing CC Pavement 0m to 260m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Construction of un-reinforced dowel jointed at expansion and construction joint only PCC pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade)
Provison for Name Board Cum Citizen Information Board and Maintanance Board
Provision for 60cm Equilteral Triangle Cautionary Sign Board
MAINTANANCE
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SA Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .