| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 LAccepted-AOC | ₹28.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹30.5 LRejected-Finance | ₹30.5 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹32.7 LRejected-Finance FIRST FLOOR 360 1 GREEN CITY KONDARASAMPALAYAM CHITHRAVUTHANPALAYAM DHARAPURAM TK TIRUPPUR 638657 | TIRUPPUR | TAMIL NADU | 638657 | ₹32.7 L | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | DMS Associates L2 | SPM SREE KADESHWARAN CONSTRUCTION L1 | SRI SAKTHIVEL AND CO L3 |
|---|---|---|---|---|---|---|
| 1.01 | Conducting Geophysical survey, quality and quantity test and transportation charges etc., ( This includes labour charges in the field, rent of the vehicle for reaching the place, rent of the instrument and excluding charges for the geologist) | 5 | No | 18,950 ₹18,950 | 18,690 ₹18,690 Lowest | 22,500 ₹22,500 |
| 1.02 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe Upto 150m Below GL | 750 | m | 2,22,750 ₹2,22,750 | 2,20,275 ₹2,20,275 Lowest | 2,47,500 ₹2,47,500 |
| 1.03 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 151 to 180m | 150 | m | 48,600 ₹48,600 | 48,060 ₹48,060 Lowest | 54,000 ₹54,000 |
| 1.04 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 181 to 210m | 150 | m | 56,850 ₹56,850 | 56,070 ₹56,070 Lowest | 63,000 ₹63,000 |
| 1.05 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 211m to 240m | 150 | m | 67,650 ₹67,650 | 66,750 ₹66,750 Lowest | 75,000 ₹75,000 |
| 1.06 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 241m to 270m | 150 | m | 81,150 ₹81,150 | 80,100 ₹80,100 Lowest | 90,000 ₹90,000 |
| 1.07 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 271m to 300m | 150 | m | 97,350 ₹97,350 | 96,120 ₹96,120 Lowest | 1,08,000 ₹1,08,000 |
| 1.08 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 301m to 330m | 120 | m | 93,120 ₹93,120 | 91,848 ₹91,848 Lowest | 1,03,200 ₹1,03,200 |
| 1.09 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 331 onwords | 10 | m | 9,020 ₹9,020 | 8,900 ₹8,900 Lowest | 10,000 ₹10,000 |
| 1.10 | Supply and delivery of 180mm PVC Caushing pipe including cost of all tools and plants etc complete WD-M0027 page 7 TWAD SOR 2025-26 | 150 | m | 61,800 ₹61,800 | 61,009.5 ₹61,009.5 Lowest | 68,550 ₹68,550 |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
13 Aug 2026, 3:00 pmClosed
Executive Officer
1 Office Street Selampalayam Post
Drilling of Borewell, Errection of Submersible Pump and extention of water line to W-4 Somanoothu Pudu Colony, W-5 to Seelanaikkanpatty Kuditheru, W-6 Pudu Colony,W-6 Chinnakkampalayam Pudu Colony Co-opperative Society West and W-8 Chikkinapuram, T
2026_DTP_691774_1
145/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
30 days
CHINNAKKAMPALAYAM TOWN PANCHAYAT
Please refer Tender Document
2 documents required · 2 mandatory
₹0
₹40,000
Yes
HINNAKKAMPALAYAM TOWN PANCHAYAT
28 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Conducting Geophysical survey, quality and quantity test and transportation charges etc., ( This includes labour charges in the field, rent of the vehicle for reaching the place, rent of the instrument and excluding charges for the geologist) | 5 | No | 65 | ₹325 |
| 1.02 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe Upto 150m Below GL | 750 | m | 66 | ₹49,500 |
| 1.03 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 151 to 180m | 150 | m | 67 | ₹10,050 |
| 1.04 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 181 to 210m | 150 | m | 68 | ₹10,200 |
| 1.05 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 211m to 240m | 150 | m | 69 | ₹10,350 |
| 1.06 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 241m to 270m | 150 | m | 70 | ₹10,500 |
| 1.07 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 271m to 300m | 150 | m | 71 | ₹10,650 |
| 1.08 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 301m to 330m | 120 | m | 72 | ₹8,640 |
| 1.09 | Drilling of 150 mm dia deep bore wells in overburden soil including all labour Charges for insertion of casing pipes and all Tools are plants Up to Causing pipe From 331 onwords | 10 | m | 73 | ₹730 |
| 1.1 | Supply and delivery of 180mm PVC Caushing pipe including cost of all tools and plants etc complete WD-M0027 page 7 TWAD SOR 2025-26 | 150 | m | 74 | ₹11,100 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_831793.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].