Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.4 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹24.4 L | 1 | Accepted-AOC Eligibe L-1 bidder |
| 2 | 2₹24.4 LRejected-Finance 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | ₹24.4 L | 2 | Rejected-Finance Quoted more than L-1 bidder. |
| 3 | 3₹24.5 LRejected-Finance VILL P O CHINCHURIA DIST BURDWAN WB PIN 713378 | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | ₹24.5 L | 3 | Rejected-Finance Quoted more than L-1 bidder. |
| Sl No | Description | Qty | Unit | JAY MAA DAL DALI KALI L3 | MAZUMDER ELECTRICAL L1 | RAJ ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01Material Cost | ||||||
| 1.02 | Fabrication of joint box including locking arrangement ,GI nut and bolt ,denting painting. | 6 | No. | 15,700 ₹94,200 | 15,700 ₹94,200 | 15,700 ₹94,200 |
| 1.03 | Epoxy molded bus bar support insulator. | 36 | No | 1,692 ₹60,912 | 1,690 ₹60,840 | 1,690 ₹60,840 |
| 1.04 | EC grade Aluminium bus bar size 1/3" x2"x16" with 1/2" holes/bore-06 nos for for fitting busbar support. | 18 | No | 1,065 ₹19,170 | 1,060 ₹19,080 | 1,061 ₹19,098 |
| 1.05Labour Cost: | ||||||
| 1.06 | Labour cost for fabrication of joint box. | 1 | LS | 42,000 ₹42,000 | 41,000 ₹41,000 | 41,200 ₹41,200 |
| 1.07 | Labour cost for Shifting, laying, loading, unloading of HT power cable of field switches, marching of shovels, drill, dragline under the qualified supervisor and supervisor of ECL representative for day to day advancement of mine for drilling blasting etc. (for one year/365 days)(including tools , tackles and overhead). | 1,05,900 | Mtrs | 15.55 ₹16.5 L | 15.54 ₹16.5 L | 15.55 ₹16.5 L |
| 1.08 | P. F. amount for labour cost. | 1 | No. | 2,08,728.88 ₹2.1 L | 2,08,874.39 ₹2.1 L | 2,08,630 ₹2.1 L |
| 1.09 | Total impact of GST for the purpose of CTC | 1 | Nos | 3,72,916.06 ₹3.7 L | 3,72,470.47 ₹3.7 L | 3,72,728.34 ₹3.7 L |
Tender Value
₹22.4 L
EMD Value
₹28,100
Closing Date
25 Dec 2025, 5:00 pmClosed
AE EnM
S. B. Area
Day to day shifting ,laying , unloading of HT power cable of field switches , marching of shovels ,drills , dragline under the qualified supervisor and supervisor of ECL representative for day to day advancement of mine for drilling blasting etc.
2025_ECL_348901_1
GM/SBA/EnM/Tender/25-26/61
Open Tender
Electrical and Maintenance Works
365 days
S. B. Area
Please refer tender documents.
6 documents required · 6 mandatory
₹28,100
24 Jan 2026
13 Dec 2025
27 Dec 2025
15 Dec 2025
25 Dec 2025
15 Dec 2025
15 Dec 2025 - 18 Dec 2025
Amount
Item Description/ Heading
Material Cost
Fabrication of joint box including locking arrangement ,GI nut and bolt ,denting painting.
Epoxy molded bus bar support insulator.
EC grade Aluminium bus bar size 1/3" x2"x16" with 1/2" holes/bore-06 nos for for fitting busbar support.
Labour Cost:
Labour cost for fabrication of joint box.
Labour cost for Shifting, laying, loading, unloading of HT power cable of field switches, marching of shovels, drill, dragline under the qualified supervisor and supervisor of ECL representative for day to day advancement of mine for drilling blasting etc. (for one year/365 days)(including tools , tackles and overhead).
P. F. amount for labour cost.
Total impact of GST for the purpose of CTC
RAJ ENTERPRISE (BID ID -1204943)
JAY MAA DAL DALI KALI (BID ID -1204528)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.68 MB
BOQ_361760.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid