Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance 0 RAILWAY STATION ROAD BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | 1 | Accepted-Finance ACCEPT | |
| 2 | 2₹2.0 L+₹180.25 (0.09%)Accepted-Finance | 2 | Accepted-Finance ACCEPT | |
| 3 | 3₹2.0 L+₹202.30 (0.10%)Accepted-Finance | 3 | Accepted-Finance ACCEPT |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
21 Apr 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BALRAMPUR
OFFICE SE EDC BALRAMPUR
LINE SHIFITING OF RAJKEEYA NALKOOP VILLAGE CHANDRAKHA BUZURG VIKAS KHAND GILAULA AND OTHER WORKS(RUNNING TENDER) UNDER EDD, SHRAWASTI
2022_MVVNL_686195_1
02/EDC(BLP)/2022-23
Open Tender
Electrical Works
Fixed-rate
90 days
SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BLP ICICI 101505001086 IFDC ICIC0001015
₹2,000
27 Apr 2022
9 Apr 2022
22 Apr 2022
9 Apr 2022
21 Apr 2022
9 Apr 2022
180 days
Amount
Carriage of all the concerning material from Electricity Store Centre Shrawasti to JE's dump store & from JE's dump store to the site of work including loading, unloading and proper satcking at site
STP Pole(11Mtr Long)
PCC Pole(8.5Mtr Long)
ACSR Weseal Conductor
Arial Bunch Cable Size 3X50 Sq Mm
LTPVC Cable 4X16 mm
AB Cable Size 3X120 mmsq
Earthing Complete
25 KVA T/F
63 KVA T/F
100KVA T/F
Stay Set
Errection Of STP Poles for HT/LT. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site
Errection Of PCC Poles for HT/LT. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site
Laying, stringing, sagging & binding of ACSR Weseal conductors of HT/ LT Line 11 KV in 3 phase, 3 wire line with jumpering (where as required)
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost.
Errection and Grouting of Stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Laying, Stringing & binding Of Arial Bunch Cable Size (3X50 Sq Mm)
Laying, Stringing & binding Of AB Cable Size 3X120 mmsq.
Laying, Stringing & binding Of LTPVC Cable 4X16 mm
Mounting And Installation Of 25 KVA T/F
Mounting And Installation Of 63 KVA T/F
Mounting And Installation Of 100 KVA T/F
Other Line Material
Installation Of Electrice Meter
Decentrilized material As F-Bracket Nut And Bolt Etc. (Provide By Working Agency)
M/s S S Associates
Anil Kumar Yadav
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .