| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56,768Admitted-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | L1 | Admitted-Finance | |
| 2 | L2₹59,280+₹2,512 (4.43%)Admitted-Finance SAS NAGAR MOHALI PUNJAB | S A S NAGAR | PUNJAB | 140103 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Markanda Electrical Works L1 | M/S GATIMAN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. upto 1.5 mtr depth | 1 | Cum | 100 ₹100 Lowest | 110 ₹110 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 1.5 to 2.25 mtr depth | 1 | Cum | 192 ₹192 Lowest | 200 ₹200 |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 192 ₹192 Lowest | 200 ₹200 |
| 4.00 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement . | 1 | Cum | 6,600 ₹6,600 Lowest | 6,700 ₹6,700 |
| 5.00 | 10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding. | 1 | Sqm | 172 ₹172 Lowest | 180 ₹180 |
| 6.00 | 10mm thick cement plaster 1:4 on bed and top. | 1 | Sqm | 134 ₹134 Lowest | 144 ₹144 |
| 7.00 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | Cum | 9,984 ₹9,984 Lowest | 10,000 ₹10,000 |
| 8.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 5,452 ₹5,452 Lowest | 5,500 ₹5,500 |
| 9.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 4,173 ₹4,173 Lowest | 4,200 ₹4,200 |
| 10.00 | Lowering, jointing and cutting of PVC pipes 225 mm dia into trenches and laying same to correct alignment | 1 | Mtr | 75 ₹75 Lowest | 76 ₹76 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
21 Oct 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Engineer
13-A, Canal Colony, Phase-1, Urban Estate, Dugri, Ludhiana-141013
Lining and Relining of w/c with u/g pipeline of Outlet RD 16780-L of Lohara Mr. of Kingwah Disty Village Khosa Pande, Khosa Randhir
2025_WR_150203_1
PWRMDC/NIT 17 of 2025/DT.18.09.2025
Open Tender
Civil Works
Item Rate
180 days
Moga
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹22,000
Ludhiana
11 Nov 2025
18 Sept 2025
21 Oct 2025
18 Sept 2025
21 Oct 2025
18 Sept 2025
24 Sept 2025
Amount
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. upto 1.5 mtr depth
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. from 1.5 to 2.25 mtr depth
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Lowering, jointing and cutting of PVC pipes 225 mm dia into trenches and laying same to correct alignment
Lowering, jointing and cutting of MS pipe 140 mm dia for air vent pipe into trenches and laying same to correct alignment
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in manholes complete with cement concrete 1:2:4
Providing and fixing equal T 225 mm for riser
Providing and fixing service handle 225 mm for air vent pipe joint
Providing and fixing air vent valve 140 mm
Providing and fixing end cap 225 mm
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D-Regulators)
Centreing &shuttering for Concerte faces
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect (600 mm dia)
Dismantling of brick work in cement
M/S GATIMAN CONSTRUCTION (BID ID -690789)
stage.html
html • 0.03 MB
techsummary_304071.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.91 MB
tb1.xls
Tender Documents • 0.07 MB
BOQ_304071.xls
BOQ • 0.29 MB
Corr10ofNIT17of2025.pdf
PDF • 0.83 MB
Corrigendum09ofNIT17of2025.rar
PDF • 0.69 MB
Corr08ofNIT17of2025.pdf
PDF • 0.83 MB
Corr07ofNIT17of2025.pdf
PDF • 0.83 MB
Corr06ofNIT17of2025.pdf
PDF • 0.83 MB
Corr05ofNIT17of2025.pdf
PDF • 0.83 MB
Corr04ofNIT17of2025.pdf
PDF • 0.83 MB
Corr03ofNIT17of2025.pdf
PDF • 0.82 MB
Corr02ofNIT17of2025.pdf
PDF • 0.83 MB
Corrigendum01ofNIT17of2025.rar
PDF • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .