Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,960
Closing Date
13 Jul 2026, 4:00 pm4d left
XEN REW kathua
XEN REW kathua
Construction of Dug well NHO Nazir Ahmed, Pyt. Dodla, Block Bhoond.
2026_RDPR_314702_2
e-NIT No.83/REW/K of 2026-27 Dated 06/07/2026
Open Tender
Civil Works
90 days
Bhoond
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹2,960
6 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundation, drains, pipes etc. neatly dressed in All kind of Soil | 12.94 | cum. | 479 | ₹6,198.26 |
| 2 | P/L in position cement conc.(1;5;10) crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 0.36 | cum. | 4,826.5 | ₹1,737.54 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.26 | cum. | 4,294.84 | ₹5,411.5 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.72 | CUM | 9,821 | ₹7,071.12 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 0.36 | kg | 12,320 | ₹4,435.2 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 9.33 | CUM | - | - |
| 7 | Filling of earth | 18.12 | cum. | 218 | ₹3,950.16 |
| 8 | Dewatering | - | no | 450 | - |
| 9 | Carriage of brick 130 km | 4,431.75 | cum | 5.43 | ₹24,064.4 |
| 10 | Carriage of sand and bajari 15km | 5.29 | cum | 938.37 | ₹4,963.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.98 MB
BOQ_1019256.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid