Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LQualified Make: NA
Model: 132/220/400 KVA PG Clamp 89 SECTOR 12 A PANCHKULA | Make: NA
Model: 132/220/400 KVA PG Clamp | ₹1.2 L | L1 | Qualified |
| 2 | L2₹1.5 LQualified Make: NA
Model: Substation Clamps / Connectors | Make: NA
Model: Substation Clamps / Connectors | ₹1.5 L | L2 | Qualified |
| 3 | L3₹1.6 LQualified Make: NA
Model: T-CLAMP FOR PANTHER CONDUCTOR B 515 KASHIRM NAGAR BHOGPUR MITHONI MORADABAD MORADABAD UTTAR PRADESH 244001 UDYAM DL 05 0029683 | MORADABAD | UTTAR PRADESH | 244001 | Make: NA
Model: T-CLAMP FOR PANTHER CONDUCTOR | ₹1.6 L | L3 | Qualified |
| 4 | L4₹1.6 LQualified Make: NA
Model: NA | Make: NA
Model: NA | ₹1.6 L | L4 | Qualified |
| 5 | L5₹1.8 LQualified Make: NA
Model: NA M 11 12 SHATABDI NAGAR COLONY QUARSI RAMGHAT ROAD ALIGARH ALIGARH UTTAR PRADESH 202001 UDYAM UP 02 0072899 | ALIGARH | UTTAR PRADESH | 202001 | Make: NA
Model: NA | ₹1.8 L | L5 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
21 Jan 2026, 1:00 pmClosed
Substation Clamps/Connectors (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7099507 Dated : 11-01-2026 Bid Document 1/22
-- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8826256
GEM/2026/B/7099507
Two Packet Bid
Ghaziabad, Uttar Pradesh
Total value wise evaluation
PRODUCT
6 documents required · 6 mandatory
10%
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Substation Clamps/Connectors (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria | - | 15 | - |
Exempted
11 Jan 2026
11 Jan 2026
21 Jan 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8826256.pdf
GEM_BID
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
GEM_OTHER • 0.64 MB
list-of-categories-where-trials-are-allowed_1712126171.pdf
GEM_OTHER • 0.52 MB
gtc.pdf
GEM_OTHER • 0.70 MB
Download all tender documents and submit your bid