Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-NOTHING MENTION ON FEE RECEIPT |
Tender Value
₹12.3 L
Closing Date
21 Dec 2021, 6:00 pmClosed
Executive Engineer, REW, Doda.
Office of the Executive Engineer, REW, Doda.
CONSTRUCTION OF FOOT BRIDGE AT KUNDA ZAYRAT NALLAH (NAROT) Panchayat Mallan Block Bhaqwah (PRI GRANT)
2021_RDPR_153097_14
e-NIT No 35/Capex of REW Doda 2021-22 DT 13-12-21
Open Tender
Civil Works
Item Rate
45 days
DODA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer, REW, Doda.
Exempted
23 Dec 2021
16 Dec 2021
22 Dec 2021
16 Dec 2021
21 Dec 2021
16 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth a directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including carriage of material all complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% boulders. Including all carriages complete.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. including carriage of material all complete
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. including carriage of material all complete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level TMT including carriage of material all complete
Dumping stone including cost of stones in Horizontal on level including carriage of material all complete
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
VEER TRADERS
SURJEET KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .