Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.4 L
EMD Value
₹4,440
Closing Date
18 Jul 2020, 4:00 pmClosed
EX.Engineer irrrigation ompora budgam
EX.Engineer irrrigation ompora budgam
Improvements to Dehgam canal by way of concrete lining at RD 8.50 to 56.80 mtrs and RD 56.80 to RD 70.30 mtrs including construction of RCC Super Passage and culvert at spots. of Work Rs. 4.44 lacs ( including deptt supply)(Fresh)
2020_IFC_100157_3
enit23of072020
Open Tender
Civil Works
Item Rate
10 days
Budgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹250
Yes
ExecutiveEngg ID ompora
₹4,440
Yes
20 Jul 2020
11 Jul 2020
20 Jul 2020
11 Jul 2020
18 Jul 2020
11 Jul 2020
Amount
Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed In: All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level.a)1:4:8 (1 cement : 4 coarse sand: 8 graded stone agg.40mm nominal size ) crushed.
b)1:3:6 (1 cement : 3 coarse sand: 6 graded stone agg.20mm nominal size ) crushed.
Providing and laying in position cement concrete of specified grade of reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement -All work upto plinth level 1:2:4 (1 cement : 2 coarsesand :4 graded stone agg. 20mm nominal size )
Reinforcement for RCC work including straightening cutting, bending , placing in position and binding all complete . Thermo-Mechnically treated bars.
Centring & shuttering including structting propping etc and removal of form for:- a))foundations, footings bases of columns etc for mass concrete
b)suspended floors, roofs,landings, balconies and access platform
12mm cement plaster of mix: 1:4 (1 cement: 4 fine sand)
Carriage of Materials upto road site of work by Mechanical transport including cost of loading unloading and stacking a)40mm agg av. 10Km
b) 20mm agg ---do---
c) sand av. 25km.
d) cement /steel from division store av. 23 km
M/S AHMAD CONSTRUCTIONS GROUP OF ENGINEERS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .