Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC AT BHAIRABI SAHI PO TALCHER TOWN PS TALCHER DIST ANGUL 759107 | TALCHER | ANGUL | ODISHA | 759107 | ₹4.8 L | L1 | Accepted-AOC AS BEING L1 |
| 2 | L2₹5.3 L+₹57,907.50 (12.2%)Rejected-Finance AT PO TALABEDA KANDHAL TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹5.3 L+₹57,907.50 (12.2%) | L2 | Rejected-Finance AS BEING L2 |
| 3 | L3₹6.0 L+₹1.2 L (25.9%)Rejected-Finance AT PO DEULBERA WARD NO 10 TALCHER DIST ANGUL ODISHA 75910 | TALCHER | ANGUL | ODISHA | 75910 | ₹6.0 L+₹1.2 L (25.9%) | L3 | Rejected-Finance AS BEING L3 |
| Sl No | Description | Qty | Unit | MANOJ KUMAR DAS L2 | M/S. SANJEEB NAYAK L3 | SANJIB KUMAR BHUTIA L1 |
|---|---|---|---|---|---|---|
| 1.01 | Manually drain out rain water from road to nearby drain cutting and cleaning of berm, where ever required, placement of Hume pipe in position, cleaninh of coal sludge and muck-mulma etc complete. As per instruction of EIC (for Monsoon period of 5 months @ 30 days). | 150 | day | 3,521 ₹5,28,150 | 3,951 ₹5,92,650 | 2,664 ₹3,99,600 Lowest |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 5,281.5 ₹5,281.5 | 5,926.5 ₹5,926.5 | 3,996 ₹3,996 Lowest |
Tender Value
₹13.5 L
EMD Value
₹16,900
Closing Date
27 Feb 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), LINGARAJ AREA
SO (CIVIL), OFFICE OF THE GM, LINGARAJ AREA TALCHER, ANGUL_759102, ODISHA, INDIA
Engagement of manpower for laying and cleaning of Hume Pipes and miscellaneous drainage works during monsoon under Lingaraj OCP of Lingaraj Area.
2026_MCL_353217_1
MCL/GM(LA)/e-Tender/ SO(C)/25-26/100 dt.14.02.2026
Open Tender
Civil Works - Others
Item Rate
150 days
Lingaraj OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹16,900
3 Apr 2026
16 Feb 2026
2 Mar 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
16 Feb 2026 - 20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Manually drain out rain water from road to nearby drain cutting and cleaning of berm, where ever required, placement of Hume pipe in position, cleaninh of coal sludge and muck-mulma etc complete. As per instruction of EIC (for Monsoon period of 5 months @ 30 days). | 150 | day | 7,540 | ₹11,31,000 |
| 2 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.43 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_366003.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .