Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 16 EDEN GARDEN CHUNA BHATTI KOLAR ROAD BHOPAL M P 462016 | BHOPAL | BHOPAL | MADHYA PRADESH | 462016 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Non-responsive as per Cl. 2.2.2.2 (i) (ii) and 2.2.2.4 (i) (ii) of RFP |
Tender Value
Refer Docs
EMD Value
₹1.1 Cr
Closing Date
22 Feb 2024, 3:00 pmClosed
Ankit Loyal
NHIDCL HQ New Delhi
Construction of 2-lane Ukhrul bypass starting at km 537.850 of NH-202 and joining at km 8.840 of NH-102A (Ukhrul - Toloi -Tadubi Road) and continuing upto km 9.840 of NH-102A (Package-1, Length-6.571 km) in the State of Manipur on EPC mode. -2nd Call
2024_NHIDC_793412_1
NHIDCL/MANIPUR/EPC/ UKHRULBYPASS/2023/C2
Open Tender
Civil Works
Manipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,600
MD NHIDCL
₹1.1 Cr
NHIDCL HQ New Delhi
7 Mar 2024
2 Feb 2024
23 Feb 2024
2 Feb 2024
22 Feb 2024
16 Feb 2024
2 Feb 2024 - 13 Feb 2024
13 Feb 2024
Amount
Construction of 2-lane Ukhrul bypass starting at km 537.850 of NH-202 & joining at km 8.840 of NH-102A (Ukhrul – Toloi – Tadubi Road) and continuing upto km 9.840 of NH-102A (Package-1, Length-6.571 km) in the State of Manipur on EPC mode. (2nd Call)
ABCI Infrastructures Pvt Ltd
AK SHIVHARE INFRASTRUCTURE PVT LTD
HVS Construction Materials Pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid