| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 CrAccepted-AOC | ₹28.7 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹30.6 Cr+₹1.8 Cr (6.41%)Rejected-Finance | ₹30.6 Cr+₹1.8 Cr (6.41%) | L2 | Rejected-Finance NOT L-1 bidder |
| 3 | L3₹31.6 Cr+₹2.9 Cr (10.1%)Rejected-Finance | ₹31.6 Cr+₹2.9 Cr (10.1%) | L3 | Rejected-Finance NOT L-1 bidder |
| 4 | Not Admitted-Fee/PreQual/Technical 1FA 3RD FLOOR D BLOCK IIT MADRAS RESEARCH PARK KANAGAM ROAD TARAMANI TARAMANI CHENNAI KANCHIPURAM TAMIL NADU 600097 | CHENNAI | TAMIL NADU | 600097 | - | - | Not Admitted-Fee/PreQual/Technical Others-Hard copy / offline bid not received. |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Hard copy / offline bid not received within stipulated time. The bid is considered as 'Late bid' as per Tender condition. |
| Sl No | Description | Qty | Unit | Enertech Engineering Private Limited L2 | mhpl india private limited L1 | SGB INFRA LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Design, Supply, Fabrication, Installation and commissioning of 04 nos. Triple storey (G+2) Pre-Engineered Field Hostel Building | ||||||
| 1.01 | Supply, Fabrication, Erecting, Installation and commissioning of 4 nos. Triple storey (G+2) Pre-Engineered Field Hostel Building as per specified technical specification. | 8,206.84 | Sqm | 33,800 ₹27,73,91,192 | 32,000 ₹26,26,18,880 Lowest | 34,200 ₹28,06,73,928 |
| 1.02 | Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift up to 1.50 m. | 1,238.57 | Cum | 320 ₹3,96,342.4 Lowest | 498 ₹6,16,807.86 | 730 ₹9,04,156.1 |
| 1.03 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 133.75 | Cum | 7,125.96 ₹9,53,097.15 | 6,810 ₹9,10,837.5 | 6,400 ₹8,56,000 Lowest |
| 1.04 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth | 12.7 | Cum | 9,173.72 ₹1,16,506.24 | 7,878 ₹1,00,050.6 Lowest | 8,400 ₹1,06,680 |
| 1.05 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 487.77 | Cum | 10,618.68 ₹51,79,473.54 | 9,050 ₹44,14,318.5 | 8,550 ₹41,70,433.5 Lowest |
| 1.06 | Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel | 31,416.92 | Kg. | 130.68 ₹41,05,563.11 | 110 ₹34,55,861.2 Lowest | 111 ₹34,87,278.12 |
| 1.07 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete. | 100.46 | Sq.m. | 536.68 ₹53,914.87 | 390 ₹39,179.4 Lowest | 711 ₹71,427.06 |
| 1.08 | Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint b) In Tees, Angles, Flats and Channels | 260.56 | Quintal | 13,867.9 ₹36,13,420.02 | 13,370 ₹34,83,687.2 Lowest | 14,100 ₹36,73,896 |
| 1.09 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge External work (viii) 75 mm nominal outer dia Pipes | 280 | Mtr | 2,437.8 ₹6,82,584 | 1,250 ₹3,50,000 Lowest | 1,800 ₹5,04,000 |
Tender Value
₹32.7 Cr
EMD Value
₹49 L
Closing Date
19 Nov 2025, 6:00 pmClosed
General Manager Electrical
Procurement and Contracts Department NHPC Limited Dibang Multipurpose Project Roing Arunachal Pradesh 792110
Design Supply Fabrication Installation and Commissioning of 04 nos Triple storey G plus 2 Pre Engineered Field Hostel Building at New Apali Colony Dibang Multipurpose Project DMPP Arunachal Pradesh
2025_NHPC_883189_1
NH/DMP/PNC/NIT/2025/13
Open Tender
Civil Works - Buildings
Works
Roing
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
NHPC Ltd
₹49 L
Yes
15 Jun 2026
29 Oct 2025
28 Nov 2025
29 Oct 2025
19 Nov 2025
29 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Design, Supply, Fabrication, Installation and commissioning of 04 nos. Triple storey (G+2) Pre-Engineered Field Hostel Building | |||||
| 1.01 | Supply, Fabrication, Erecting, Installation and commissioning of 4 nos. Triple storey (G+2) Pre-Engineered Field Hostel Building as per specified technical specification. | - | Sqm | 1.25 | - |
| 1.02 | Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift up to 1.50 m. | 1 | Cum | 100 | ₹99.99 |
| 1.03 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | - | Cum | 53 | - |
| 1.04 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth | 1 | Cum | 10 | ₹10 |
| 1.05 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 1 | Cum | 11 | ₹11 |
| 1.06 | Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel | 1 | Kg. | - | - |
| 1.07 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete. | 1 | Sq.m. | 100 | ₹99.99 |
| 1.08 | Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint b) In Tees, Angles, Flats and Channels | - | Quintal | 53 | - |
| 1.09 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge External work (viii) 75 mm nominal outer dia Pipes | - | Mtr | 10 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
BOQ_928287.xls
BOQ • 0.41 MB
Tendr32cr.pdf
Tender Documents • 5.52 MB
SafetyManual.pdf
Additional Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .