| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC SAROJA CONTRACTOR SENJI TAMIL NADU TN | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.1 L+₹1,219.24 (0.10%)Rejected-AOC KRISHNAGIRI | TAMIL NADU | 635001 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R RAJENDIRAN L2 | Saroja L1 |
|---|---|---|---|---|---|
| 1.00Providing Reneval BT to Bharathanthangal road 0/0-0/800 | |||||
| 1.01Clearing the scrub jungles including all labour charges for all labour charges etc complete. | |||||
| 1.02 | Km 0/0 - 0/800 | 688.5 | m2 | 6.36 ₹4,378.86 Lowest | 6.36 ₹4,378.86 Lowest |
| 1.03Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | |||||
| 1.04 | Km 0/0 - 0/800 | 54 | m2 | 140.35 ₹7,578.9 Lowest | 140.35 ₹7,578.9 Lowest |
| 1.05Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 1.06 | Km 0/0 - 0/800 | 11.36 | m3 | 4,422.28 ₹50,237.1 Lowest | 4,422.28 ₹50,237.1 Lowest |
| 1.07Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | |||||
| 1.08 | Km 0/0 - 0/800 | 2,868.75 | m2 | 34.36 ₹98,570.25 Lowest | 34.36 ₹98,570.25 Lowest |
| 1.09BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | |||||
Tender Value
₹12.2 L
EMD Value
₹12,240
Closing Date
5 Feb 2026, 3:00 pmClosed
BDO BP
Block Development Office, Gingee
Providing Reneval BT to Bharathanthangal road 0/0-0/800 at Bharathanthangal
2026_RDTN_649000_3
Gingee RRM SFC GRANT 202526 (Pack1)
Open Tender
Civil Works
Works
60 days
Gingee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,240
Yes
1 Mar 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing Reneval BT to Bharathanthangal road 0/0-0/800 | |||||
| 1.01 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | - | - | - | - |
| 1.02 | Km 0/0 - 0/800 | 688.5 | m2 | 6.36 | ₹4,378.86 |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | - | - | - | - |
| 1.04 | Km 0/0 - 0/800 | 54 | m2 | 140.35 | ₹7,578.9 |
| 1.05 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | - | - | - | - |
| 1.06 | Km 0/0 - 0/800 | 11.36 | m3 | 4,422.28 | ₹50,237.1 |
| 1.07 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | - | - | - | - |
| 1.08 | Km 0/0 - 0/800 | 2,868.75 | m2 | 34.36 | ₹98,570.25 |
| 1.09 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_778135.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .