| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.1 LAccepted-AOC | L1 | Accepted-AOC lowest quoted bidder | |
| 2 | L2₹57.5 L+₹1.4 L (2.51%)Rejected-Finance | L2 | Rejected-Finance work allotted to lowest quoted bidder |
| Sl No | Description | Qty | Unit | Karan Boro L1 | RATIN BARO L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of RCC Canal
Earth work in excavation in foundation of canal structure in all
types of soils as per design and drawing including dressing the
foundation, shoring etc. removing the surplus spoils by head load
to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m) | 210 | CuM | 250 ₹52,500 Lowest | 250 ₹52,500 Lowest |
| 2.00 | Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm
thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (i) For ordinary soil | 525 | SqM | 44 ₹23,100 Lowest | 44 ₹23,100 Lowest |
| 3.00 | Collection and supply of sand mixed gravel contains 40% of sand
and 60% of river gravel of size 13 mm to 38 mm free from all
foreign materials including carriage from quarry to the work site
loading, unloading and stacking in measurable stacks as directed Distance of work site from quarry @ 50 Km | 52.5 | CuM | 3,424 ₹1,79,760 Lowest | 3,500 ₹1,83,750 |
| 4.00 | Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all
carriage etc | 52.5 | CuM | 520 ₹27,300 Lowest | 520 ₹27,300 Lowest |
| 5.00 | Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) (ii)With shuttering & without Dewatering | 78.75 | CuM | 8,950 ₹7,04,812.5 Lowest | 9,500 ₹7,48,125 |
| 6.00 | Cement Concrete work in proportion 1: 1 ½ : 3 with aggregate of
size 6 mmto 20 mm free from dust and dirt and other foreign
materials including roding (vibrating), bailing out wate where
necessary and carrying with supplying all materials complete as
directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) | 143.04 | CuM | 11,725 ₹16,77,144 Lowest | 12,000 ₹17,16,480 |
| 7.00 | Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/
TMT bars of all sizes as per design and drawing as required
including cutting, bending, cranking with necessary lappage and
tying with black wire complete as directed. | 142.47 | Qtl | 14,718.5 ₹20,96,944.7 Lowest | 15,000 ₹21,37,050 |
| 8.00 | Earth work in back filling of structure with earth obtaining from
outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as direc | 84 | CuM | 390 ₹32,760 Lowest | 390 ₹32,760 Lowest |
| 9.00 | Earth work in all soils in canal embankment and bed filling as per
design section and grade by cart carriage for a minimum distance
of 1 Km. including paying compensation of earth obtained from
private land if any, loading, unloading and stacking in measurable
stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.) | 360 | CuM | 440 ₹1,58,400 Lowest | 440 ₹1,58,400 Lowest |
| 10.00 | Construction of 150 mm dia PVC pipe outlet
Earth work in excavation in foundation of canal structure in all
types of soils as per design and drawing including dressing the
foundation, shoring etc. removing the surplus spoils by head load
to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m) | 95.7 | CuM | 250 ₹23,925 Lowest | 250 ₹23,925 Lowest |
Tender Value
₹56.1 L
EMD Value
₹1.1 L
Closing Date
23 Dec 2025, 3:00 pmClosed
Addl. Chief Engineer cum CHD Irrigation, BTC Kokra
O/o the Addl. Chief Engineer cum CHD, Irrigation, BTC, Kokrajhar
Construction of RCC Canal, 150 mm dia PVC pipe outlet and Construction of Earthen Canal Kathalguri Agriculture Bund FIS under PMKSY (HKKP) for the year 2021-2022
2025_BoTC_48964_6
ACE/CHDI/10/2025/18 dated 01/12/2025
Open Tender
Civil Works
Works
365 days
BARAMA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,200
₹1.1 L
Yes
O/o the Addl. Chief Engineer cum CHD, Irrigation,
12 Jan 2026
1 Dec 2025
24 Dec 2025
1 Dec 2025
23 Dec 2025
5 Dec 2025
8 Dec 2025
Amount
Construction of RCC Canal Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (i) For ordinary soil
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed Distance of work site from quarry @ 50 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) (ii)With shuttering & without Dewatering
Cement Concrete work in proportion 1: 1 ½ : 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as direc
Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Construction of 150 mm dia PVC pipe outlet Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) (ii)With shuttering & without Dewatering
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) (i)Without shuttering & without Dewatering
PVC blind pipe 150mm dia as per IS:1281
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Construction of Earthen Canal Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
RATIN BARO (BID ID -289840)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
SBD6.pdf
Tender Documents • 1.56 MB
BOQ_77722.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .