Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.5 LAccepted-AOC GORAKHPUR GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹96.5 L | L1 | Accepted-AOC AOC |
| 2 | L2₹1.1 CrRejected-Finance | ₹1.1 Cr | L2 | Rejected-Finance NOT ADMITTED |
Tender Value
₹1.4 Cr
EMD Value
₹8.9 L
Closing Date
26 Mar 2026, 6:55 pmClosed
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
SE, Jaunpur-Ghazipur Circle, PWD, Jaunpur
Construction of 3x7x5 meter span Box Culvert, Approach Road and Additional Approach in place of narrow and damaged minor bridge on Gangi River at Km-3 of contact road from Itahara via Satmesara to Baburam house
2026_CEUVZ_1128864_1
665/SETender/jnp-gzp circle/25 Date-07-02-2026
Open Tender
Civil Works
365 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.9 L
Yes
12 Jun 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 2Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 3Sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 4Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 5Furnishing and Placing Reinforced/ Prestressed cement concrete in M20 super-structure as per drawing and Technical Specification. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 6(M-25) R.C.C work for Slab with cement approved coarse sand and 2cm gauge approved dalla grit proportion as per job mix excluding supply of reiforcement and its bending but uncluding its fixing and binding the same with 24BWGGI binding wire complete in all respect. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 7(M-30) R.C.C work for Slab with cement approved coarse sand and 2cm gauge approved dalla grit proportion as per job mix excluding supply of reiforcement and its bending but uncluding its fixing and binding the same with 24BWGGI binding wire complete in all respect. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 8Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 9(M-25) R.C.C work for Slab with cement approved coarse sand and 2cm gauge approved dalla grit proportion as per job mix excluding supply of reiforcement and its bending but uncluding its fixing and binding the same with 24BWGGI binding wire complete in all respect. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
| 10RCC Grade M20 using batching plant transit mixer & manual placing:-Reinforced Cement Concrete complete as per Drawing and Technical Specifications. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2105541.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid