Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 L+₹7,801 (2.52%)Admitted-Finance | ₹3.2 L+₹7,801 (2.52%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 L+₹19,746 (6.37%)Admitted-Finance | ₹3.3 L+₹19,746 (6.37%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HINDPATH CONSTRUCTION L1 | MUNNA KHAN L3 | Abdul Parvez Khan L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 3 | One Cubic Metre | 1,500 ₹4,500 Lowest | 2,600 ₹7,800 | 2,600 ₹7,800 |
| 2.00 | Extra for cutting reinforcement bars manually / by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 2 | One Square Metre | 350 ₹700 Lowest | 400 ₹800 | 700 ₹1,400 |
| 3.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | One Cubic Metre | 10,000 ₹20,000 | 7,000 ₹14,000 Lowest | 8,500 ₹17,000 |
| 4.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 4 | One Cubic Metre | 10,000 ₹40,000 | 8,000 ₹32,000 Lowest | 8,000 ₹32,000 Lowest |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 27 | One Square Metre | 600 ₹16,200 | 400 ₹10,800 | 300 ₹8,100 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : (b) Columns, Pillars, Piers, Abutments, Posts and Struts | 2 | One Square Metre | 650 ₹1,300 | 500 ₹1,000 | 250 ₹500 Lowest |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 540 | One Kilogram | 90 ₹48,600 Lowest | 100 ₹54,000 | 90 ₹48,600 Lowest |
| 8.00 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 27 | One Square Metre | 300 ₹8,100 | 400 ₹10,800 | 260 ₹7,020 Lowest |
| 9.00 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 152 | One Kilogram | 120 ₹18,240 Lowest | 130 ₹19,760 | 150 ₹22,800 |
| 10.00 | Steel work welded in built up sections / framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 169 | One Kilogram | 120 ₹20,280 | 90 ₹15,210 Lowest | 130 ₹21,970 |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
25 Jun 2026, 6:00 pmClosed
Nodal Officer (Tender)
O/o Sr. Chief Engineer (Civil), BSNL MP Civil Zone Block-C, BDA Flats, First Floor, Vidya Nagar, Behind Petrol Pump Hoshangabad Road, Bhopal (MP) - 462026
Dismantling of RTT at the existing rented BTS site at Indira Nagar Mohan Nagar and reerection at New rented BTS site at Indira Nagar Mohan Nagar OA Ujjain under BA Ujjain
2026_BSNL_281036_1
NIT No 12/EE/DIV/IND/2026-27
Open Tender
Civil Works
Item Rate
60 days
Ujjain
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer Cash Oo GMTD BA Ujjain
₹7,000
17 Jul 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 3 | One Cubic Metre | 100 | ₹300 |
| 2 | Extra for cutting reinforcement bars manually / by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 2 | One Square Metre | 100 | ₹200 |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | One Cubic Metre | 100 | ₹200 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). | 4 | One Cubic Metre | 100 | ₹400 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 27 | One Square Metre | 100 | ₹2,700 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : (b) Columns, Pillars, Piers, Abutments, Posts and Struts | 2 | One Square Metre | 100 | ₹200 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 540 | One Kilogram | 100 | ₹54,000 |
| 8 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 27 | One Square Metre | 100 | ₹2,700 |
| 9 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. | 152 | One Kilogram | 100 | ₹15,200 |
| 10 | Steel work welded in built up sections / framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 169 | One Kilogram | 100 | ₹16,900 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_327999.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .