Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
3 Nov 2026, 6:00 pm
HQ CWE BATHINDA
HQ CWE BATHINDA
CA NO CWE BTD TOKEN-14 2026-27 PROVN OF SINGLE LIVING ACCN IN OFFRS MESS FAMILY WELFARE CENTRE AT DRIGPAL SINGH INSTITUTE DSI TWO ROOM FOR STORAGE OF MEDICAL GAS CYLINDER NEAR RATION STORE RELIGION INSTITUTE SARV DHARMSTHAL AT BTD MIL STN
2026_MES_791332_1
CWE BTD/TOKEN-14/2026-27
Open Tender
Civil Works
Lump-sum
270 days
HQ CWE BATHINDA
AS PER NIT
8 documents required · 8 mandatory
₹1,000
Yes
GE PROJECT BATHINDA
₹2.1 L
Yes
HQ CWE BATHINDA
26 Sept 2026
26 Sept 2026
5 Nov 2026
26 Sept 2026
3 Nov 2026
24 Oct 2026
12 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GENERAL SUMMARY | |||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part- I (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,44,61,800 | ₹1,44,61,800 |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 44,616.16 | ₹44,616.16 |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part- III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 6,34,085.99 | ₹6,34,085.99 |
| 2.04 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 41,626 | ₹41,626 |
| 2.05 | Lump sum price worked out by the contractor for EXTERNAL ELETRIC SUPPLY WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,62,010.95 | ₹1,62,010.95 |
| 2.06 | Lump sum price worked out by the contractor for ROAD ,PATH , HARDSTANDING AND CULVERT WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,21,518.83 | ₹2,21,518.83 |
| 2.07 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 57,692.05 | ₹57,692.05 |
| 2.08 | Lump sum price worked out by the contractor for EXCAVATION, EARTH WORK AND SITE DEVELOPMENT WORKS as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 84,990.82 | ₹84,990.82 |
| 2.09 | Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IX (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,76,752.85 | ₹1,76,752.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.09 MB
8114_tender.pdf
Tender Documents • 6.31 MB
Btd DRGS THREE LBW and 1 Rev_BTD-006 (1R-2) 23-03-2023 FLOOR JOINTS.pdf
Additional Documents • 0.06 MB
Btd DRGS THREE LBW and 1 Rev_BTD-006 (2R-2) 07 JUN 2016 FLOOR JOINTS.pdf
Additional Documents • 0.06 MB
Btd DRGS THREE LBW and 1 Rev_BTD-007(1R-2) 30-01-2017 BEDDING, HAUNCHING ,ENCASING FOR PIPE SEWERS.PDF
Additional Documents • 0.14 MB
Btd DRGS THREE LBW and 1 Rev_BTD-007-2R-2 (07-06-2016) BEDDING, HAUNCHING ,ENCASING FOR PIPE SEWERS.PDF
Additional Documents • 0.06 MB
Btd DRGS THREE LBW and 1 Rev_BTD-039 (1R-1) 07 JUN 2016 SECTIONAL ELEVATION SHOWING DIFFRENT HEIGHT OF ELECTRICAL FITTING.PDF
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-045 (1R-1) 07 JUN 2016 BLACK BOARD.PDF
Additional Documents • 0.08 MB
Btd DRGS THREE LBW and 1 Rev_BTD-046 (1R-1) 07 JUN 2016 METER BOX -SWITCH BOX ELECTRIC.PDF
Additional Documents • 0.08 MB
Btd DRGS THREE LBW and 1 Rev_BTD-052 (1R-3) 07 JUN 2016 CONNECTION OF RWP PARAPET CI GRATING ROOF PROJECTION & SPLASH STONE.PDF
Additional Documents • 0.10 MB
Btd DRGS THREE LBW and 1 Rev_BTD-052 (2R-3) 07 JUN 2016 CONNECTION OF RWP PARAPET CI GRATING ROOF PROJECTION & SPLASH STONE.PDF
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-052 (3R-3) 07 JUN 2016 CONNECTION OF RWP PARAPET CI GRATING ROOF PROJECTION & SPLASH STONE.PDF
Additional Documents • 0.10 MB
Btd DRGS THREE LBW and 1 Rev_BTD-059R DT 23-06-2021 (SH 1-1).pdf
Additional Documents • 0.10 MB
Btd DRGS THREE LBW and 1 Rev_BTD-064 (1R-4) 10 MAR 2017 PLUMBING SINGLE STACK SYSTEM.PDF
Additional Documents • 0.13 MB
Btd DRGS THREE LBW and 1 Rev_BTD-064 (2R-4) 10 MAR 2017 PLUMBING SINGLE STACK SYSTEM.PDF
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-064 (3R-4) 10 MAR 2017 PLUMBING SINGLE STACK SYSTEM.PDF
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-064 (4R-4) 10 MAR 2017 PLUMBING SINGLE STACK SYSTEM.PDF
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-068 (1R-1) 10 MAR 2017 GENERAL NOTES ON ARCH DRG.PDF
Additional Documents • 0.15 MB
Btd DRGS THREE LBW and 1 Rev_BTD-084 E&M (1R-2) 18-9-2017 EXTENAL ELECTRICAL DETAIL SHOWING STREET LIGHT POLES & FITTINGS.PDF
Additional Documents • 0.10 MB
Btd DRGS THREE LBW and 1 Rev_BTD-084 E&M (2R-2) 18-9-2017 EXTENAL ELECTRICAL DETAIL SHOWING STREET LIGHT POLES & FITTINGS.PDF
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-097 (1R-1) 25-01-2017 DECORATIVE DRAPERY ROD.PDF
Additional Documents • 0.08 MB
Btd DRGS THREE LBW and 1 Rev_BTD-821-1(18-07-2013).PDF
Additional Documents • 0.88 MB
Btd DRGS THREE LBW and 1 Rev_BTD-836-1-1 DT 07 AUG 2021 MISC DETAILS.pdf
Additional Documents • 0.39 MB
Btd DRGS THREE LBW and 1 Rev_BTD-838.PDF
Additional Documents • 1.11 MB
Btd DRGS THREE LBW and 1 Rev_BTD-857-(01-07-2016).PDF
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-878 (19-9-2017) DETAIL OF DPC AT FINISHED FLOOR LEVEL & MESONARY VERTICAL DPC BETWEEN PB AND DPC.PDF
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-888R (1-5) pressed steel box type window without fly proof.pdf
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-888R (2-5) pressed steel box type window without fly proof.pdf
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-888R (3-5) 05-12-2018.pdf
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-888R (4R-5) (08-05-2020).pdf
Additional Documents • 0.11 MB
Btd DRGS THREE LBW and 1 Rev_BTD-888R (5-5) pressed steel box type window without fly proof.pdf
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-889 1-4 06-09-2018.pdf
Additional Documents • 0.20 MB
Btd DRGS THREE LBW and 1 Rev_BTD-889 2-4 06-09-2018.pdf
Additional Documents • 0.14 MB
Btd DRGS THREE LBW and 1 Rev_BTD-889 4-4 06-09-2018.pdf
Additional Documents • 0.12 MB
Btd DRGS THREE LBW and 1 Rev_BTD-889 3-4 06-09-2018.pdf
Additional Documents • 0.08 MB
Btd DRGS THREE LBW and 1 Rev_BTD-892 1- 5 18-09-2018 misc deatils.pdf
Additional Documents • 0.11 MB
Btd DRGS THREE LBW and 1 Rev_BTD-892 2- 5 18-09-2018 misc deatils.pdf
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-892 3- 5 20-11-2018 misc deatils.pdf
Additional Documents • 0.09 MB
Btd DRGS THREE LBW and 1 Rev_BTD-892 4- 5 05-02-2021 misc deatils.pdf
Additional Documents • 0.11 MB
Btd DRGS THREE LBW and 1 Rev_BTD-892 5- 5 18-09-2018 misc deatils.pdf
Additional Documents • 0.07 MB
Btd DRGS THREE LBW and 1 Rev_BTD-903 DT 28 OCT 2023 SHT 01 0F 02 PRESSED STEEL FRAME BOX WINDOW STEEL FLY PROOF.pdf
Additional Documents • 0.16 MB
Btd DRGS THREE LBW and 1 Rev_BTD-903 DT 28 OCT 2023 SHT 02 0F 02 PRESSED STEEL FRAME BOX WINDOW STEEL FLY PROOF.pdf
Additional Documents • 0.11 MB
Btd DRGS THREE LBW and 1 Rev_BTD-905 SH 1-2 .pdf
Additional Documents • 1.19 MB
DRAWINGS FOR 04 WORKS.rar
Additional Documents • 40.88 MB
BOQ_887166.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .